Melbana Energy — MEO Australia — Non-Deal Roadshow (November 2010)

22 slides from Melbana Energy's roadshow presentation, November 2010

  1. Slide 1: North American Roadshow

    Disclaimer This presentation includes certain forward-looking statements that have been based on current expectations about future acts, events and circumstances. These forward-looking statements are, however, subject to risks, uncertainties and assumptions that could cause those acts, events and ci

  2. Slide 2: Corporate snapshot

    Corporate snapshot Leverage to growing export gas markets, strong cash position MEO Australia Limited (ASX: MEO; OTC: MEOAY) Asian Net Gas Imports (LNG) 140 China Issued ordinary shares 477.2m 120 Unlisted options 8.9m 100 Market Cap (undiluted @ $0.50) A$239m 80 Other Cash @31st Oct (AUD/USD = $1.0

  3. Slide 3: Experienced team

    Experienced team Sound commercial decisions, underpinned by technical rigour Nick Heath Non-Executive Chairman Colin Naylor • Appointed May 2008 CFO/Company Secretary • Engineer • 30 years at Woodside, BHP, Rio • >30 years with ExxonMobil • Past APPEA President Jürgen Hendrich MD & CEO Robert Gard •

  4. Slide 4: Strategically located acreage

    Strategically located acreage Near existing LNG projects hungry for gas to underpin expansion Age of Main Gas Reservoir (Trap) Jurassic (Structural-Stratigraphic) Cretaceous (Structural) NWS Project (30 Tcf) Upper Triassic (Structural) East Artemis Existing Prospect 16.3 Mtpa (5 trains) Upper Triass

  5. Slide 5: Petrobras farm-in to WA-360-P

    Petrobras farm-in to WA-360-P ~12 Tcf prospect, multiple development options, drilling Nov/Dec 2010 • Petrobras farmed in for 50% interest (April 2010) • Paying 100% of 1st well (to US$41m cap, MEO & Petrobras 50/50 above cap) • MEO received US$31.5m cash, plus US$7.5m in seismic related back-costs

  6. Slide 6: Artemis prospect revealed on MEO 3D

    12 Tcf Artemis prospect revealed on MEO 3D Analogous to Perseus field - DHI* termination = Gas Water Contact? East Artemis Prospect: WA-360-P (MEO 25%) Perseus Field – NWS JV (nearby analogue) Base Calypso Amplitude Interpreted gas-water Depth Map Extract contact Published outline of field Interpret

  7. Slide 7: Rigorous geophysical analysis

    Rigorous geophysical analysis Used to identify & quantify probability* of gas sands occurring Acoustic Impedance 80% Gas Sand probability envelope Poisson’s Ratio Simultaneous inversion was undertaken to produce three datasets (Acoustic Impedance, Poisson’s Ratio and Gas Probability*) that were used

  8. Slide 8: Resource assessment (100% basis)

    Resource assessment (100% basis) Combined 12 Tcf mean prospective resources, 32% GCOS Formation P90 P50 Mean P10 Parameter Distribution Calypso Fm Legendre Fm Calypso GR Volume 10^6 m^3 20,650 23,769 Gas-in-place TCF 7.7 10.6 10.8 14.0 Net to Gross Triangular 25%-45%-70% 25%-45%-70% Recoverable TCF

  9. Slide 9: WA-360-P case study

    WA-360-P case study MEO’s technical skills and rapid evaluation identifies potential value 2007 2008 2009 2010 Permit awarded to Cue Energy and Gascorp (Feb ‘05) MEO farms-in for 60% equity (Oct’07) on seismic option acquire/process MEO acquires 200 km2 3D over Artemis lead (Dec’07) interpret Interp

  10. Slide 10: Bonaparte Basin – more challenging for LNG

    Bonaparte Basin – more challenging for LNG Best quality resource developed, other resources economically challenged Timor-Leste Evans Shoal-2 DST-1: 25 MMcfd 2500m DST-1A: 5.5 MMcfd 8% Abadi 10 Tcf Indonesia Greater 4% Australia Sunrise Barossa-1 % Barossa DST-1: <1 MMcfd CO2 Evans 16% DST-2: 30 MMc

  11. Slide 11: Tassie Shoal Projects have environmental approvals

    Tassie Shoal Projects have environmental approvals A modular hub ready for gas of any quality... Accommodation and Control Platform (ACP) Methanol Plant LNG Plant (5,000 tpd/1.75 Mtpa Stage 1 only) Methanol Gas (3.0 Mtpa) (For CO2 sequestration) N Loading Buoy Supply MEO 100% MEO 50%, Air Products 5

  12. Slide 12: Projects provide optionality & flexibility

    Projects provide optionality & flexibility Methanol plant has substantially lower reserves threshold than LNG 30 Uneconomic (unless blended) 25 2 Methanol Plants 1 Methanol Plant 3 Mtpa LNG + 1 Methanol Plants 20 CO2 Content (%) 3 Mtpa LNG + 2 Methanol Plants 15 10 CO2 sequestration Uneconomic 5 (un

  13. Slide 13: Heron gas discovery – seeking farminee

    Heron gas discovery – seeking farminee Best estimate, prospective resource ~5 Tcf Blackwood East Heron-2 Heron-1 Blackwood Well Well NT/P68 Heron Line of Cross Section Lowest Known Gas (LKG) = 4115m SS GCA Mid Case = gas down to 4133m SS Heron North Heron South MEO mapped structural spill point = 43

  14. Slide 14: Portfolio management

    Portfolio management Identify prospectivity, add value, test potential, replenish acreage 2H2009 2010 1H2011 WA-360-P (25%, Carnarvon) • Complete data room process • Select preferred farminee negotiate execute • Farmout agreements FIRB Permit Tfr • Regulatory approvals Artemis-1 (WA-360-P) • Raise f

  15. Slide 15: Summary

    Summary Balanced portfolio with considerable growth potential • Balanced board, experienced management team Songa Venus • ~A$71m uncommitted cash (assumes AUD/USD = parity) • Material gas projects near existing infrastructure • 25% equity in ~12 Tcf Artemis prospect – drilling Nov 2010 • Proposed Ta

  16. Slide 16: Supplementary information

    Supplementary information Technical back-up Developed Developed Developed Developed 16

  17. Slide 17: CO2 emissions intensity

    CO2 emissions intensity Projects must deal with carbon to achieve Environmental Approvals CSG gas gathering 875 km pipeline to Darwin   Developed Developed Developed Developed Developed Developed Developed Devel’d Devel’d Gas production emissions intensity Drivers: • CO2 content in reservoir gas -

  18. Slide 18: Methanol production sequesters CO2

    Methanol production sequesters CO2 Enables gas with moderate CO2 content to be sanitised for LNG production Sequestration in companion Methanol plant 9% CO2 Feed Gas Example 74% of feed 67% of revenue LNG US$1.36bn/yr 480 mmscfd LNG Plant 3.0 Mtpa (at average 2006-present $ 4.5 Tcf, Japan LNG import

  19. Slide 19: Prelude and Greater Sunrise FLNG

    Prelude and Greater Sunrise FLNG “Shell plans world’s biggest ship at Australian field” Source: http://royaldutchshellplc.com 19

  20. Slide 20: Timor Sea LNG Plant – no floating risks

    Timor Sea LNG Plant (TSLNGP) – no floating risks “MEO plans smallest footprint 3.0 Mtpa LNG plant” Conventional Concrete and Steel LNG Tanks Conventional Concrete Gravity Based Structure • One 3.0 Mtpa module • 170,000 m3 LNG storage • Arup, Air Products and Worley Air Products 3.0 Mtpa LNG Arup sel

  21. Slide 21: Tassie Shoal Methanol Project (TSMP)

    Tassie Shoal Methanol Project (TSMP) Brings the gas processing plant to gas field – eliminating long pipelines Davy Process Technology M5000 Plant in Trinidad + = Methanol Plant on Concrete Gravity Structure (CGS) • Off-the-shelf technology • DPT, Arup & Aker Kvaerner designs ExxonMobil’s Adriatic L

  22. Slide 22: Methanol Demand – China Only

    Methanol Demand – China Only High forecast demand growth 25 Million tonnes per annum (Mtpa) 20 15 Fuels (direct use and additives) 10 5 Chemicals & other - 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 11.8 x 1.75 Mtpa forecast Methanol Plants • Strong growth averages more than one 1.7