Slide 1: Presentation of ArcelorMittal Châtelet
Presentation of ArcelorMittal Châtelet Bernard Hallemans, General Manager Châtelet 19 November 2010
Slide 2: Welcome to ArcelorMittal Châtelet
Welcome to ArcelorMittal Châtelet 1
Slide 3: The site of ArcelorMittal Châtelet
The site of ArcelorMittal Châtelet Scrap & HR slag coils Steel yards area plant Hot strip mill Slabs area River Rail Highway 2
Slide 4: Safety is a priority
Safety is a priority • “Shared vigilance” • Systematic audits on site • Various campaigns to raise awareness (fair play) • OHSAS 18001 certified since 2008 3
Slide 5: Environmental care
Environmental care • Environmental protection in the numerous fields is an ongoing concern • Management of the HSM environment has been ISO 14001 certified since 2001 • The use of BATs (Best Available Technologies) in the construction of the new steelworks (effective dust removers, closed water circ
Slide 6: The Châtelet Melt Shop
The Châtelet Melt Shop Restoring upstream competitiveness • Only a move away from the industrial structure of Stainless Europe makes way for a competitive upstream division • The process involved three changes : – Concentrating all Stainless hot rolling on one site created the possibility to impleme
Slide 7: The Melt Shop
The Melt Shop A compact layout Capacity 160 t Diameter 8 m Power installed 160 MVA Casting speed 1,4 m/min Dimensions 200x1650 mm Capacity 180 t Slab weight up to 30 t 6
Slide 8: The Châtelet Hot Strip Mill
The Châtelet Hot Strip Mill A flexible dedicated stainless mill • Built in 1976, enlarged and revamped in different successive operations • Gradual evolution towards nearly 100% stainless steel operation over time • Optimal resizing for current stainless load (1.6 MT) • Upstream OTD >90% with high s
Slide 9: The Hot Strip Mill
The Hot Strip Mill Optimally suited for stainless 2 scale breakers Edger 1.775 kW 7 4-high stands Dimensions 12,9x36m Twin drive 2 x 7.600 kW 2 x 4.500 kW per stand Capacity 300 t/h each Tunnel length 53 m Final gauge 1,2 - 20 mm 8
Slide 10: 10 Golden Rules to respect
=~ 10 Golden Rules to respect ArcelorMittal IT Reger: " Se La consignation | Régle w 2: ig | | Priorité absolue : i te || ee = nS: Ay tf Ne mcnes yal Fry sous les charges ntl 3 = . — fk le code de la route est d'epplication ‘SUR TOUT LE SITE o Via. y TT Reg Lalcot, ee ja I mie cannabis et Respectez
Slide 11: ArcelorMittal
i ArcelorMittal