  1. Slide 1: Presentation of ArcelorMittal Châtelet

    Presentation of ArcelorMittal Châtelet Bernard Hallemans, General Manager Châtelet 19 November 2010

  2. Slide 2: Welcome to ArcelorMittal Châtelet

    Welcome to ArcelorMittal Châtelet 1

  3. Slide 3: The site of ArcelorMittal Châtelet

    The site of ArcelorMittal Châtelet Scrap & HR slag coils Steel yards area plant Hot strip mill Slabs area River Rail Highway 2

  4. Slide 4: Safety is a priority

    Safety is a priority • “Shared vigilance” • Systematic audits on site • Various campaigns to raise awareness (fair play) • OHSAS 18001 certified since 2008 3

  5. Slide 5: Environmental care

    Environmental care • Environmental protection in the numerous fields is an ongoing concern • Management of the HSM environment has been ISO 14001 certified since 2001 • The use of BATs (Best Available Technologies) in the construction of the new steelworks (effective dust removers, closed water circ

  6. Slide 6: The Châtelet Melt Shop

    The Châtelet Melt Shop Restoring upstream competitiveness • Only a move away from the industrial structure of Stainless Europe makes way for a competitive upstream division • The process involved three changes : – Concentrating all Stainless hot rolling on one site created the possibility to impleme

  7. Slide 7: The Melt Shop

    The Melt Shop A compact layout Capacity 160 t Diameter 8 m Power installed 160 MVA Casting speed 1,4 m/min Dimensions 200x1650 mm Capacity 180 t Slab weight up to 30 t 6

  8. Slide 8: The Châtelet Hot Strip Mill

    The Châtelet Hot Strip Mill A flexible dedicated stainless mill • Built in 1976, enlarged and revamped in different successive operations • Gradual evolution towards nearly 100% stainless steel operation over time • Optimal resizing for current stainless load (1.6 MT) • Upstream OTD >90% with high s

  9. Slide 9: The Hot Strip Mill

    The Hot Strip Mill Optimally suited for stainless 2 scale breakers Edger 1.775 kW 7 4-high stands Dimensions 12,9x36m Twin drive 2 x 7.600 kW 2 x 4.500 kW per stand Capacity 300 t/h each Tunnel length 53 m Final gauge 1,2 - 20 mm 8

  10. Slide 10: 10 Golden Rules to respect

    =~ 10 Golden Rules to respect ArcelorMittal IT Reger: " Se La consignation | Régle w 2: ig | | Priorité absolue : i te || ee = nS: Ay tf Ne mcnes yal Fry sous les charges ntl 3 = . — fk le code de la route est d'epplication ‘SUR TOUT LE SITE o Via. y TT Reg Lalcot, ee ja I mie cannabis et Respectez

  11. Slide 11: ArcelorMittal

    i ArcelorMittal

ArcelorMittal Châtelet — Corporate Update (November 2010) on 6ix