  1. Slide 1: McPhillamys Community Consultative Committee

    ASX:RRL McPhillamys Community Consultative Committee Monday 27 May 2024

  2. Slide 2: Agenda: Monday 27 May 2024

    2 Agenda: Monday 27 May 2024 Item 1. Welcome, introduction and apologies DR 2. Declaration of interest DR 3. Business arising from previous minutes DR 4. Previous meeting DR 5. Correspondence All - Questions from members 6. Update on project WT, DW, KL 7. General business All - Communications to and

  3. Slide 3: Project update

    Project update

  4. Slide 4: Project status

    4 Project status Current work: Preparing Definitive Feasibility Study for Final Investment Decision Ongoing preparation of environmental management plans and other supplementary approvals Modification 1 scoping letter submitted to DPHI, EPBC controlled action decision, environmental assessment under

  5. Slide 5: Regis ASX update – McPhillamys cost estimate April 2024

    5 Regis ASX update – McPhillamys cost estimate 3 April 2024 Key points: Cost increases reflect the general cost inflation seen globally for construction Estimated costs are in line with other comparable projects both within Australia and globally At current gold prices and the estimated All in Susta

  6. Slide 6: MGP Environmental Management Plans

    6 MGP Environmental Management Plans • Environmental Management Strategy • Hazard and Operability Study • Traffic Management Plan • Final Hazard Analysis • Biodiversity Management Plan • Transport of Hazardous Materials Study • Noise and Blast Management Plan* • Emergency Plan • Air Quality and Gree

  7. Slide 7: Social Impact Management Plan

    7 Social Impact Management Plan Preliminary consultation on the SIMP was completed in late 2023, results collated by CDM Smith Results of consultation and feedback will be incorporated and considered in the draft The SIMP is still under development and targeting consultation on the draft in the comi

  8. Slide 8: Modification 1

    8 Modification 1 Modification 1 scoping letter submitted to DPHI – October 2023 EPBC controlled action decision from DCCEEW (Cth) – March 2024 Ongoing field surveys being undertaken for MOD1: Biodiversity (flora, fauna, aquatic ecology, insects) Land contamination Aboriginal cultural heritage Histor

  9. Slide 9: Environmental monitoring

    9 Environmental monitoring Ongoing consultation with EPA & DPHI regarding proposed monitoring network and environmental management plans Monitoring equipment – discussions with private landowners continuing, installation planned for coming months Ongoing baseline monitoring across the site and surro

  10. Slide 10: Environmental monitoring – noise trailer

    10 Environmental monitoring – noise trailer Noise and Blast Management Plan is under assessment by DPHI In addition to the proposed fixed monitors, Regis has purchased a mobile noise monitoring trailer The mobile trailer can be used to measure noise at locations anywhere on or off site The mobile tr

  11. Slide 11: Community engagement

    11 Community engagement Communication: Six Blayney Chronicle fortnightly updates (800 print copies plus digital & social, 1 600 to McPhillamys email list) April newsletter (4 450 to Blayney LGA letterboxes, 1 600 to McPhillamys email list) Blayney Chronicle advertising support for Can Assist, Blayne

  12. Slide 12: General business

    M\\\\\\\\\ - General business

  13. Slide 13: Mining and the circular economy

    13 Mining and the circular economy The circular economy is a system where materials never become waste and nature is regenerated. In a circular economy, products and materials are kept in circulation1 Business imperatives in mining mean that the principles of the circular economy have been part of b

  14. Slide 14: Gold in the circular economy

    14 Gold in the circular economy Metals are inherently recyclable Nearly all gold ever mined remains in circulation because it is both valuable and virtually indestructible The majority of recycled gold comes from jewellery (90%) with the remainder extracted from technology. https://www.quintet.com/n

  15. Slide 15: Mining, water & circular economy principles

    15 Mining, water & circular economy principles Principle1 McPhillamys examples 2 Eliminate waste and pollution • Designed to move external surface water around site • Designed to use production water from Lithgow that would otherwise be wasted (evaporation) • Rainfall captured on site in Water Manag

  16. Slide 16: Environmental, social and governance reporting (ESG)

    16 Environmental, social and governance reporting (ESG)

  17. Slide 17: ESG reporting

    17 ESG reporting Regis reports annually on environmental, social and governance performance Regis’ ESG reporting is based on Global Reporting Initiative principles for the mining sector and provides information about our company’s commitment to sustainable development The GRI Standards represent glo

  18. Slide 18: McPhillamys Gold Project