Chalice Gold Mines Limited

Chalice Gold Mines — Investor Presentation (March 2006)

16 slides from Chalice Gold Mines's investor presentation, March 2006

  1. Slide 1: Disclaimer

    © cneArice DISCLAIMER © bite laa

  2. Slide 2: Overview

    OVERVIEW © CHALICE Port Hedland * YANDEEARRA WESTERN AUSTRALIA

  3. Slide 3: Regional geology and gold camps

    \ <== Proterozoic dyke \ 4 \q | zi sranite, gneiss é [1 Greenstone sequence OMAN i X& |S comtenements \ | \ |* os Camp/Mine endowment Cc Avoca’s Trident Higginsville Camp BoMor Gold | past production ER Te cneArice mm 4 POSEIDON FOOTWALL CENTRAL Cc bite laa a ™ ne 1 | SFAPLAY Oat a NORTH END \ = MIT

  4. Slide 4: Higginsville style lodes

    © CHALICE Trident Style Lodes Poseidon South Style Lodes Two Boys Style Lode 0 200 400m BB] Sediments —— Shear zone a Horizontal Scale BBY Matic rocks A Orthote with gold intercept Vertical Exaggeration x 2 HAG Uttramatic volcanics ~“\_ Outline of goid deposits HIGGINSVILLE © I ¢ & = ¢ Surface = ba

  5. Slide 5: Higginsville cross sections

    HIGGINSVILLE 379000meE Section 6482560mN 380 100mE 300RL- WEST Pit outline EAS? & Sv sv ~ > S ~ eFF F eH EE [PE EF Esine® I__1C_] I 4m @93.09g/tAu incl. 1m @367.33g/tAu gi 4m@7.25g/tAu Rowe, mined 2m@1.159/tAu 4 — — [a 250RL 4 Gold mineralisation associated with structure separating 50m + 1m@7.43g/t

  6. Slide 6: Higginsville

    HIGGINSVILLE (5 Transported cover Basalt (0) Ultramatics €=3) Gold Targets

  7. Slide 7: Higginsville

    HIGGINSVILLE CHALICE GOL MEMES Kimiren B78 800mE WEST 379 500mE 578 800mE 379 S00mE WEST Poseidon South Style Lodes Projected 4.5km south B78 800mE 379 500mE WEST Surface Two Boys Style Lode Projactad 3.5km south n [ez] Transported cover [BABY Matic volcanics ——~— Shear zone a Drilhole with gold int

  8. Slide 8: Higginsville and Chalice Gold Mine area

    GW Proterozoic dyke CE) Granitoids [2 Sedimentary rocks VENDETTA q tomet oon Au, \ | Gi Matic-uttramatic Au peated aca Avoca Gold Interests @ Bullion Target Areas > CHALICE GOLD MINE (+700,0000z) T i] HIGGINSVILLE PIONEER GRANITOID COMPLEX

  9. Slide 9: Chalice Main Lode and Deeps

    Cc HALICE : RESOURCE — CHALICE . “ So MAIN LODE paceuduagi atures soe : 556 0000z@5.55g/tAu | jum — DEEPS 3 RESOURCE 7m@10.09g/tAu & 8m@4.76g/tAu Main Lode > Grade x Thickness Contours A >... >50gm xm 2 13m@3.59g/tAi 20 | 20-50gm xm = = m ; A 10 | 10-20gmxm Renee ne Ar , 10.45m@2.56g/tAu + +| Granit

  10. Slide 10: Yandeearra Project

    [1 sediments, intrusives [2 Greenstone [4 Granite ARRA 2) com Project outlines A CHALICE = Fer R/Ac Drilling N ° Prospect ~~~ Interpreted shear Indee Calvert 451,000 oz| | 49,000 oz S De Ss Turner LS) mal _autis — “77 Range River's | ina Well Indee Project 2 rf fingina, zs is j (Buen =xcsed ° A . Ex

  11. Slide 11: Meekatharra geology

    Proterozoic sediments Felsic volcanics & sediments Mafic volcanics Ultramafic volcanics Internal granitoids Gneissic granitoids MEEKATHARRA >3.5M OZ PRODUCTION v4

  12. Slide 12: Project geology and RAB drilling

    peated aca R \S WSs ee < ° RAB Drilling >0-1gitau 7: soz endowment) N Ap \ | Red October [J Cainozoic alluvial i Fortitude [[) Archaean granite (43 7,0000z endowment) [] Archaean sediments ND < and acid volcanics = Archaean mafic and a ultramafics —— Major structures | CGM Tenement ROJECT

  13. Slide 13: Investment Highlights

    -~ Banded Iron Formation > -80# soil sampling >15ppbAu preston a ® Selected drillhole collar [_) Tenement Boundary 2 GE | C \ WILGA 3me7 t5gft A im@1. iu from 45m WHR129 INVESTMENT HIGHLIGHTS © CHALICE > Multiple drill ready targets. > 150 km? at Higginsville adjacent Avoca’s Trident gold discovery

  14. Slide 14: Drilling Schedule

    DRILLING SCHEDULE © Diamond & RC Drilling Advance Targets © Commencement of Drilling Announced :: Core & RAB Drilling, Pipeline Prospects ¢Drilling Result Aangonded CHALICE _ wa H] Apr06 = May06 «Jun 065 Jul05 «= Aug05 §«=Sep05 §Oct06 NovO5 Dec06 JanO7 Feb07 MarO7 ~™ om mo 1 a) Pe 2i00m a * O05 a ya

  15. Slide 15: Capital Structure

    CAPITAL STRUCTURE CG CHALICE CAPITAL STRUCTURE CG CHALICE

  16. Slide 16: Application of Funds

    APPLICATION OF FUNDS CG CHALICE IPO TIMETABLE CG CHALICE

Chalice Gold Mines — Investor Presentation (March 2006) on 6ix