  1. Slide 1: Growth on the Horizon

    Growth on the Horizon October 22, 2024 TSE: EDR | NYSE: EXK TSX: EDR | NYSE: EXK www.edrsilver.com

  2. Slide 2: Cautionary Note

    Cautionary Note This presentation contains “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward- looking information" within applicable Canadian securities legislation. Such forward-looking statements and information herei

  3. Slide 3: Investor Highlights

    Investor Highlights MID-TIER BUILDING SIGNIFICANT LEADING STRATEGICALLY SILVER MEXICO’S NEXT ORGANIC SILVER ACQUIRING KEY PRODUCER SILVER MINE GROWTH LEVERAGE ASSETS Two high grade, Terronera is Best organic Pure precious Opportunistic underground scheduled for growth profile in metals producer merg

  4. Slide 4: 2024 Outlook – Core Assets Focused in Mexico

    2024 Outlook – Core Assets Focused in Mexico Exploration Operation Development 2023 CONSOLIDATED OUTLOOK (3) Parral Project Guanacevi Mine Chihuahua State, Mexico 2024 CONSOLIDATED OUTLOOK (2) Durango State, Mexico 4.4 – 4.6 Moz $30M Pitarrilla Project Silver Production Sustaining Capital Durango St

  5. Slide 5: 2023 Sustainability Highlights

    2023 Sustainability Highlights TSX: EDR | NYSE: EXK 5

  6. Slide 6: Guanacevi Mine

    Guanacevi Mine Durango 80% Ag 20% Au 2023 Mine Plan, Metals Mix • Production – 2005 - 2022: 48.4M oz Ag, 120k oz Au – 2023: 5.1M oz Ag, 15.0k oz Au • Reserves(1) : 0.7 million tonnes at 476 g/t AgEq TSX: containing 11.2 million AgEq oz TSX:EDR • M&I Resources(1) : 570k tonnes at 523 g/t AgEq EDR| NY

  7. Slide 7: Guanacevi – Production Continues

    Guanacevi – Production Continues PRIMARY BALL MILL TRUNNION FAILURE AgEq Quarterly Production (oz)(1) Cash shortfall to be limited during reduced production period (3) 1,665,662 1,569,359 1,535,148 1,294,091 OPERATIONS CONTINUE AT REDUCED RATE 995,145 Temporary modifications have been completed with

  8. Slide 8: Guanacevi – Delivering High Grade Drill Results

    Guanacevi – Delivering High Grade Drill Results PROLIFIC AREA CONTINUITY TO THE EAST POTENTIAL Situated along prolific Intersecting excellent Connecting El Curso to One continuous orebody Santa Cruz vein 15 km results with step-out holes Porvenir Dos - comparable to original long, producing in area

  9. Slide 9: Bolanitos Mine

    Bolanitos Mine Guanajuato 80% Au 20% Ag 2023 Mine Plan, Metals Mix • Production – 2007 - 2022: 16.8M oz Ag, 339k oz Au – 2023: 0.6M oz Ag, 22.9k oz Au • Reserves(1) : 459k tonnes at 246 g/t AgEq containing 3.6 million AgEq oz • M&I Resources(1) : 789k tonnes at 327 g/t AgEq TSX: containing 8.3 milli

  10. Slide 10: Bolanitos – Maintaining Steady Performance

    Bolanitos – Maintaining Steady Performance YTD 2024 PRODUCTION AgEq Quarterly Production (oz)(1) Increased gold production from higher grades with similar throughput, offset by lower silver production due to lower grades 581,764 605,704 605,063 621,257 622,772 EXPLORATION UPSIDE Completed surface di

  11. Slide 11: Terronera Project

    Terronera Project Jalisco 60% Ag 40% Au Reserve, Metals Mix • Endeavour’s next core asset • Construction continues on track ✓ Achieved formal board approval in Q2-23 ✓ Closed $120 million debt facility in Q4-23 • 2 defined ore bodies: • Terronera vein TSX: • La Luz vein TSX:EDR • Proposed LOM + 10 y

  12. Slide 12: Terronera – Mexico's Next Silver Mine Commissioning in Q4 2024

    Terronera – Mexico’s Next Silver Mine Commissioning in Q4 2024 CONSTRUCTION NEARLY COMPLETE ALMOST 100% ORGANIC GROWTH • Endeavour’s largest mine and next operating mine • 10 years of technical work has prepared the project for construction including 6 technical reports (105,000 m of drilling) EXPEC

  13. Slide 13: Terronera - Operating Cost Comparison

    Terronera - Operating Cost Comparison $ 120.00 TERRONERA EST. CASH COSTS(1) VS. OPERATING PEER GROUP(2) 100.00 80.00 60.00 40.00 26.46 21.23 21.81 23.20 17.17 17.50 18.54 19.66 19.92 20.07 13.86 15.00 16.48 20.00 10.28 11.05 12.74 12.81 13.28 7.17 7.19 8.24 8.35 9.18 9.81 10.09 3.79 5.26 6.39 0.26 1

  14. Slide 14: Terronera – Project Schedule

    Terronera – Project Schedule COMISSIONING ESTIMATED LATE Q4 2024 • 21-month construction period • Ramp-up Q1 2025 SENIOR SECURED DEBT FACILITY(1) • Principal: $120 million • Term: 8.5 years; grace period during construction • Cost: SOFR + 3.75% per annum • Gold hedge for up to 68,000 ounces at $2,32

  15. Slide 15: Terronera – Q3 2024 Construction Update

    Terronera – Q3 2024 Construction Update CONSTRUCTION PROGRESS 77% COMPLETE • Terronera has been significantly de-risked with $258 (1) million spent to date; Project commitments total $270 million (1,2) UNDERGROUND MINE DEVELOPMENT • 5,544 metres of mine development completed to date (1) • Undergroun

  16. Slide 16: Construction Advanced Through Q3 2024

    Construction Advanced Through Q3 2024 TSX: EDR | NYSE: EXK Mill and surface infrastructure construction was 90% complete and continues to transition to operations. 17

  17. Slide 17: Construction Milestones Achieved in Q3 2024

    Construction Milestones Achieved in Q3 2024 TSX: EDR | NYSE: EXK Flotation cell installations well advanced: Mechanical, piping, Primary jaw crusher was commissioned with rock electrical and instrumentation. crushed in August. 18

  18. Slide 18: Terronera - Exploration Opportunities

    Terronera - Exploration Opportunities TERRONERA PROJECT SURFACE VIEW TERRONERA VEIN • Endeavour controls 25 concessions totaling 20k hectares • The Terronera vein holds over 90% of the defined reserve • +50 mines on +50 known veins • Inferred envelope is open along strike and at depth • Thick veins

  19. Slide 19: Pitarrilla Project

    Pitarrilla Project, Durango 60% Ag 40% Pb, Zn Resource metals mix • Acquired from SSR Mining in July 2022 • Silver dominant project with extensive historical database and comprehensive work completed to date : • SSR invested $140 million to advance the project since 2002 TSX: TSX: • +225,000 metres

  20. Slide 20: Pitarrilla – One of the World's Largest Undeveloped Silver Projects

    Pitarrilla – One of the World’s Largest Undeveloped Silver Projects ENHANCES ORGANIC GROWTH PROFILE ORGANIC GROWTH POTENTIAL • Complimentary to regional existing platform in Mexico • Provides both open pit and underground optionality SUPPORTED BY LARGE RESOURCE • Maintains growth portfolio geared to

  21. Slide 21: Pitarrilla – Opportunity & History of the Project

    Pitarrilla – Opportunity & History of the Project Focus pivots to expanding resources with evaluation of open-pit SSR shifts focus of the project to reducing initial concepts following surge in silver price capex and maximizing returns Pre-feasibility study published, Feasibility study Scoping study

  22. Slide 22: Pitarrilla – Summary of Historically Contemplated Operations

    Pitarrilla – Summary of Historically Contemplated Operations 2009 PFS(1,3) MODELLED ON AN UNDERGROUND MINE • 4,000 tpd mining operation over 12-year mine life ENDEAVOUR SILVER IS EVALUATING THE BUSINESS • Targets sulphides beyond the limits of conceptual OP mine CASE FOR AN UNDERGROUND MINE, FOCUSED

  23. Slide 23: Parral Project

    Parral Project, Chihuahua 10% 90% Ag other Resource metals mix • Acquired Parral from SSR Mining in 2016 • Located in prolific silver mining district • 4 distinct mineralized vein systems • Veta Colorado • San Patricio • Palmilla • Cometa TSX: TSX:EDR EDR| NYSE: | NYSE: EXK EXK 24

  24. Slide 24: Parral – Potential Core Asset

    Parral – Potential Core Asset SURFACE VIEW – 4 MINERALIZED AREAS HISTORIC SILVER PRODUCING DISTRICT • Existing development / access to ore from past producers • Historic annual production was 4 million Ag oz until 1990 from the Veta Colorada mine • Palmilla – highest grade silver mine in Mexico in 1

  25. Slide 25: Sector Leading Organic Growth Strategy

    Sector Leading Organic Growth Strategy OPERATIONS Guanacevi Bolanitos 2024E production 4.9 – 5.2 Moz Ag, 13 – 15 koz Au 0.5 – 0.6 Moz Ag, 21 – 23 koz Au Terronera DEVELOPMENT Next core asset in Jalisco, near Puerto LOM production of 7.0 million oz AgEq Vallarta on 200 km2 land package over the next

  26. Slide 26: Shareholder Information

    Shareholder Information CAPITAL STRUCTURE KEY DATA Issued/ outstanding 245.9 million Exchange listings NYSE:EXK, TSX:EDR, FSE:EJD Potentially dilutive units 5.6 million Working capital US$65 million Total diluted shares 251.5 million Cash position US$68 million Recent closing price – NYSE (October 2

  27. Slide 27: Focused on Becoming a Premier Senior Silver Producer

    Focused on Becoming a Premier Senior Silver Producer Optimize Extend Mine Develop Advance Growth Grow Through TSX: EDR | NYSE: EXK Operations Lives Terronera Pipeline M&A Focus on delivering mine free Complete construction on Drill world class Pitarrilla Acquire new mines that Continue exploration c

  28. Slide 28: Appendix

    Appendix Find us on social: @edrsilvercorp @EDRSilverCorp Endeavour Silver Corp. @EDRSilverCorp Endeavour Silver Corp. TSX: TSX: Endeavour Silver Allison Pettit EDR EDR Suite 1130-609 Granville Street Director, Investor Relations | NYSE: Vancouver, BC apettit@edrsilver.com | NYSE: Canada V7Y 1G5 TF:

  29. Slide 29: Mineral Reserves and Mineral Resources Estimates

    Mineral Reserves and Mineral Resources Estimates Silver-Gold Proven and Probable Reserves (as of December 31, 2023) Tonnes (000s) Ag g/t Au g/t Ag Eq g/t Ag oz (000s) Au oz (000s) Ag Eq Oz (000s) Guanaceví 299 426 1.17 519 4,090 11.3 4,993 Bolanitos 99 74 2.48 273 235 7.9 865 Total Proven 398 338 1.

  30. Slide 30: Mineral Reserves and Mineral Resources Estimates (continued)

    Mineral Reserves and Mineral Resources Estimates (continued) Silver-Lead-Zinc Resources (as of December 31, 2023) Ag Eq Oz Tonnes (000s) Ag g/t Au g/t Ag Eq g/t Ag oz (000s) Au oz (000s) (000s) Pb% Zn% Guanaceví 363 208 0.26 229 2,421 3.1 2,670 0.78 1.32 Pitarrilla In Pit (Oxide & Transition) 133,90

  31. Slide 31: Notes to Mineral Reserves and Mineral Resources Tables

    Notes to Mineral Reserves and Mineral Resources Tables Notes 1 Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. There is no certainty that any or all part of the Mineral Resources will be converted into Mineral Reserves. The estimate of Mineral Resources ma

  32. Slide 32: Notes to Mineral Reserves and Mineral Resources Tables (continued)

    Notes to Mineral Reserves and Mineral Resources Tables (continued) Notes on Pitarilla Resource Estimate: 18 The classification of the current Mineral Resource Estimate into Indicated and Inferred Mineral Resources is consistent with current 2014 CIM Definition Standards - For Mineral Resources and M

  33. Slide 33: Qualified Persons

    Qualified Persons Guanacevi and Bolanitos The Technical Reports are entitled “NI 43-101 Technical Report: Updated Mineral Resource and Reserve Estimates for the Guanaceví Project, Durango State, Mexico” (the “ 2022 Guanacevi Report ”) with an effective date of November 5, 2022, and “NI 43-101 Techni

  34. Slide 34: 2023 Optimized Plan (2,000 tpd) Compared to 2021 FS

    2023 Optimized Plan (2,000 tpd) Compared to 2021 FS Detailed View - 2,000 TPD Plant Compared to 2021 FS Updated Development Plans and Initial Capital Costs Summary 2023 2021 % Change Silver Price 20.00 20.00 0% Gold Price 1,575 1,575 0% Silver: Gold Ratio 79 79 0% Operating Statistics Life of % LOM

  35. Slide 35: Terronera – Operational Metrics & Updated Initial Capex Scenario

    Terronera – Operational Metrics & Updated Initial Capex Scenario Select Operating Metrics 2021 FS(1) Optimized(2) 2023 Optimized 2024 Updated LOM tonnes processed (thousands) 7,380 7,382 CAPEX Estimate (millions) Scenario Scenario (4) Variance Life of Mine (Years) 12 10 Mining $69.9 $83.8 $13.9 Aver

  36. Slide 36: Non-IFRS Measures

    Non-IFRS Measures Endeavour Silver reports non-IFRS measures which include cash costs net of by -product revenue on a payable silver basis, total p roduction costs per ounce, all-in sustaining costs per ounce, direct production costs per tonne, silver co-product cash costs and gold co-product cash c

  37. Slide 37: Management Team

    Management Team Dan Dickson, CPA, CA, Don Gray, Ing., MBA, MSE, Elizabeth Senez, FCA CEO COO (ICAEW) CFO TSE: EDR | NYSE: EXK Greg Blaylock, B.Sc, MSE, Luis Castro, Ing., Geo. Dale Mah, B.Sc., P.Geo. VP Operations VP Exploration VP Corporate Development 38

  38. Slide 38: Board of Directors

    Board or Directors Rex McLennan, B.Sc., Dan Dickson, CEO Margaret Beck Ricardo Campoy MBA, ICD.D Chairman CPA, CA B.Sc. Audit B.Sc. Corp. Gov. & Nom. Director Committee Chair Comp. Committee Chair Committee Chair TSE: EDR | NYSE: EXK Amy E. Jacobsen Ken Pickering Mario Szotlender, Angela Johnson QP,