Liontown Limited · ASX:LTR

Liontown — Liontown Resources — Noosa Mining Virtual July 2020

28 slides from Liontown's conference presentation, Jul 15, 2020

  1. Slide 1: Advancing a world-class lithium deposit and an emerging gold-PGE-nickel project

    For personal use only Advancing a world-class lithium deposit and an emerging gold-PGE-nickel project ______________________________ ASX : LTR |JULY 2020 Noosa Mining Virtual July 2020

  2. Slide 2: Important Information

    Important Information For personal use only Forward Looking Statements This Presentation may include statements that could be deemed “forward-looking statements”. The information in this report that relates to 2020 metallurgical test work for the Kathleen Valley Although the Company believes the exp

  3. Slide 3: Liontown Overview

    Liontown Overview Kathleen • World class resource Valley • 156Mt @ 1.4% Li2O & 130ppm Ta2O5 Kathleen Valley Lithium Project For personal use only • 80% Measured and Indicated • Potential long life (>25 years) mine • Significant opportunities to build on previous positive PFS: Moora Ni-Cu- o Access h

  4. Slide 4: Kathleen Valley Lithium-Tantalum Project

    Kathleen Valley Lithium- For personal use only Tantalum Project WESTERN AUSTRALIA 100%

  5. Slide 5: Hard Rock Lithium Operations and Advanced Projects

    Hard Rock Lithium Operations and Advanced Projects A globally significant lithium resource For personal use only 3.00 Li2O Grade % Greenbushes Tianqi/Albemarle Kathleen Valley May 2020 2.50 SEP JUL 2018 2019 Mt Holland 2.00 (WES / SQM) Grota de Pilgangoora Cirilo (Sigma) Mt Marion (Min (Pilbara Mine

  6. Slide 6: May 2020 MRE – 108% growth in tonnes and 119% growth in contained lithium

    May 2020 MRE –108% growth in tonnes and 119% growth in contained lithium 80% Measured and Indicated W N 1,700m SE Cut-off Resource Million Ta2O5 Li2O% Li2O% Category Tonnes (ppm) For personal use only Measured 20 1.3 140 600m 0.55 Indicated 105 1.4 130 600m Inferred 32 1.3 110 Total 156 1.4 130 W 12

  7. Slide 7: December 2019 PFS Key Metrics

    December 2019 PFS Key Metrics | Open-pit mining and lithium only Based on Jul 2019 MRE – 74.9Mt @ 1.3% Li2O A$ For personal use only SC6.1: Mining: Reserve: Life of Mine Total Free Cash 295Ktpa 2Mtpa 50Mt @ 1.2% Li2O 26 years Flow +$1.9B NPV1 $507M IRR 25.1% Payback Period ~4 YEARS Opex2 $564/t conc

  8. Slide 8: Updated PFS – Input Criteria

    Updated PFS – Input Criteria 1 Underground & Optimised New, larger MRE will underpin future Open Pit Mining feasibility studies • Access higher grades sooner For personal use only • Reduce unit costs by: o Lowering mine dilution o Increasing concentrate production • Shorten payback 2 Process Improve

  9. Slide 9: Updated PFS – Proposed Processing Flowsheet 2020 Test Work Outcomes

    Updated PFS – Proposed Processing Flowsheet 2020 Test Work Outcomes • WOF produces higher grade concentrate compared with conventional DMS/Flotation For personal use only process. • Tantalum recovery of 56% at a grade of 15.3% Ta2O5 achieved. • Tantalum mineralogy appears suitable for upgrade of Pro

  10. Slide 10: The longer-term fundamentals remain strong

    The longer-term fundamentals remain The rise of lithium batteries continues strong January 2020: China extends subsidies on EV’s For personal use only EU rules begin – heavily penalising carmakers on CO2 emissions May 2020: France to provide €12,000 subsidies to swap to EVs – wants to be #1 EV manuf

  11. Slide 11: Location

    Location Well serviced and highly active mining region For personal use only Mt Keith Major Ni & Au Goldfields Mines Highway Kathleen Valley Bellevue Sealed Town of Airstrips Leinster Leinster Agnew Leinster Town Power Natural Gas JULY 2020| 11

  12. Slide 12: Major Milestones

    Major Milestones Consistent delivery of results with targets met or exceeded For personal use only INTERIM MRE MRE MAIDEN MRE UPGRADED MRE UPGRADE UPGRADE 21.2Mt @ 1.4% Li2O 74.9Mt @ 1.3% Li2O 139Mt @ 1.3% Li2O 156Mt @ 1.4% Li2O and 170ppm Ta2O5 and 140ppm Ta2O5 and 140ppm Ta2O5 and 130ppm Ta2O5 SEP

  13. Slide 13: Moora Au-PGE-Ni-Cu Project

    Moora Au-PGE-Ni-Cu For personal use only Project WESTERN AUSTRALIA 100%

  14. Slide 14: Project Overview

    Project Overview Moora is located in an emerging precious and base metal mineral province For personal use only Same geological terrain as the Julimar Ni- 1 PGE discovery by Chalice Gold Mines1. Tenements acquired in 2018 and 2019 as 2 part of generative exploration strategy for battery metals 1 Lim

  15. Slide 15: Project Background

    Project Background Gravity image • Regional geophysics indicate that Moora is underlain by mafic/ultramafic intrusions similar to that which hosts the Julimar For personal use only discovery • There has been no drill testing of the fresh bedrock at Moora. • Initial field programs have defined 2 prio

  16. Slide 16: Mt Yule – Felton Au – PGE Corridor

    Mt Yule – Felton Au – PGE Corridor • 15km long, 2.5km wide zone For personal use only with multiple, coincident Au- PGE and magnetic anomalies • Individual auger assays up to: ◦ 925ppb (0.92g/t) Au ◦ 75ppb Pd+Pt ◦ 492ppm Ni ◦ 884ppm Cu • Multiple plus 100ppb (0.1g/t) Au zones • Similar geochemical/g

  17. Slide 17: Mt Yule Prospect – 3.6 x 2.2km, multi-element anomaly

    Mt Yule Prospect – 3.6 x 2.2km, multi-element anomaly For personal use only JULY 2020| 17

  18. Slide 18: Bindi Bindi Nickel Area

    Bindi Bindi Nickel Area – Historic intersections up to 21m @ 0.5% Ni from 1.5m For personal use only Poseidon RAB drilling area (1968) JULY 2020| 18

  19. Slide 19: Next Steps

    Next Steps Results continue to validate exploration concept For personal use only Phase 1 (Q2/Q3 2020) • Infill auger sampling – phase 1 complete • Extend first pass auger sampling to adjacent areas - complete • Airborne EM – August 2020 • Total budget ~ $500,000 Phase 2 (Q4 2020/Q1 2021) • Ground E

  20. Slide 20: Investment Case

    Investment Case The only uncommitted “Tier 1” lithium resource in Australia, strengthened by exciting new targets For personal use only Kathleen Valley Lithium-Tantalum Project 156Mt resource Multiple opportunities to improve economics Flexible development Updated PFS Q4 timeline aligned to 2020 dem

  21. Slide 21: Leadership and Key Financials

    Leadership and Key Financials For personal use only David Richards Tim Goyder Craig Williams Anthony Cipriano Steven Chadwick Managing Director Chairman Non-Executive Director Non-Executive Director Non-Executive Director • +35 years • +40 years • +40 years • +30 years • +40 years • Discovered multi

  22. Slide 22: Thank You

    For personal use only THANK YOU For more information visit www.ltresources.com.au JULY 2020| 22

  23. Slide 23: Appendix: Peer Comparison Information

    For personal use only Appendix 1 PEER COMPARISON INFORMATION

  24. Slide 24: Peer Comparison Information – Mineral Resource Estimates

    Peer Comparison Information – Mineral Resource Estimates Measured Indicated Inferred Global Company Project Stage MRE Grade Information Source Mt Mt Mt MRE Mt Kathleen ASX Announcement, 11 May 2020: Development 20 105 32 156 1.35 Valley https://www.ltresources.com.au For personal use only Liontown R

  25. Slide 25: Appendix: Buldania Lithium Project

    For personal use only Appendix 2 BULDANIA LITHIUM PROJECT (LIONTOWN 100%)

  26. Slide 26: Project Overview

    Project Overview Significant lithium discovery Buldania is Located in a 1 Outcropping, fresh, spodumene- For personal use only Lithium-Rich Mineral Province related mineralisation Mineralisation at Anna extends to the SE 2 under shallow cover – strike length >1.4km and open 1 Similar geology to the

  27. Slide 27: Maiden Mineral Resource Estimate

    Resource Maiden Mineral Resource Estimate 14.9Mt @ 1.0% Li2O For personal use only The completion of the MRE complements flagship Kathleen Valley Lithium Project

  28. Slide 28: For personal use only

    For personal use only Level 2, 1292 Hay St West Perth WA 6005 +61 8 9322 7431 info@ltresources.com.au www.ltresources.com.au liontown-resources-limited @LiontownRes

Liontown Resources — Noosa Mining Virtual July 2020 on 6ix