Slide 1: Presentation to Rodman & Renshaw Conference
For personal use only Presentation to Rodman & Renshaw Conference David Johnson – Managing Director September 2010
Slide 2: Disclaimer
Disclaimer For personal use only This presentation is being provided for the sole purpose of providing the recipients with background information about Metgasco Ltd (Metgasco). No representation, express or implied, is made as to the fairness, accuracy, completeness or correctness of information con
Slide 3: Metgasco overview
Metgasco overview Onshore oil and gas exploration close to For personal use only markets on east coast of Australia Shares on issue – 252 million (approximately) Options on issue - 9 million (approximately) Included in ASX All Ordinaries Index Market capitalisation - A$128 million @$0.51 (
Slide 4: Metgasco overview - board and management
Metgasco overview - board and management Board Management & Technical Team For personal use only NICK HEATH Chairman MICK O’BRIEN Chief Operating Officer Chemical engineer with over 35 years experience in Over 30 years experience in senior engineering Australian and international energy markets. rol
Slide 5: Metgasco overview - location and acreage
Metgasco overview location and acreage For personal use only Clarence Moreton is southern continuation of the Surat basin in Queensland Leader in the Clarence Moreton Basin in NSW with dominant acreage position Basin wide holdings provide unrivalled technical insight 100% ownership and opera
Slide 6: Clarence Moreton Basin
Clarence Moreton Basin For personal use only Coal Seam Gas Tight Gas Tight Gas Tight Gas Conventional Gas 6 More Gas !
Slide 7: Reservoirs
Coal Seam Gas Reservoirs Walloon Coal Measures For personal use only Primary Reservoirs “Richmond” coal seam Average coal thickness : 5.5m Depth range : 130m - 653m (s.s) Gas content : 13.6m³/t (daf) Saturation : 100% Current Certified Resource (3P/2C) : 670 Bcf Trial Production method : Lateral, “R
Slide 8: Development of Reserves
Development of Coal Seam Gas Reserves 3000 For personal use only 2500 2000 Consistent and steady Bcf buildup of reserves associated with core 1500 drilling and testing 2,153 1000 1,479 1,336 1,084 500 381 287 21 238 3 3 0 2007 2008 2009 2010 1P 2P 3P Reserves have been certified by Mr Tim Hower of M
Slide 9: Resources
Coal Seam Gas Resources For personal use only PEL 16 (commenced CSG 2004) PEL 16 2P Reserves : 381 Bcf 3P Reserves : 2,153 Bcf 2C Resources : 1,132 Bcf PEL 13 (Independent certification) PEL 13 (commenced CSG 2007) 2C Estimate 11,000 Bcf (Internal estimate) PEL 426 (commenced CSG 200
Slide 10: Trial production: Richmond Reservoir
Coal Seam Gas trial production : “Richmond Reservoir” For personal use only Eden Creek Trial Production well CP-11 Drilled January 2008 Design : Single leg lateral In seam length : 680m 10
Slide 11: Trial production: Richmond Seam Reservoir
Coal Seam Gas trial production : Richmond Seam Reservoir 1000 For personal use only CP-11 Production Profile > 2 years of production history Initial 1P certification 2.7PJ 100 Recovery now greater than 0.1Bcf, no decline Gas composition still +97% CH4 Only modest water make, 10 suitable wa
Slide 12: Coal seam gas trial production
Coal seam gas trial production For personal use only Coal seam gas wells drilled over 100 km distance– all producing gas 12
Slide 13: Conventional/Tight Gas
Conventional/ Tight Gas Reservoirs 2009 1985 1965 For personal use only The Clarence Moreton Basin is highly prospective for large tight gas reservoirs Prior to Metgasco Kingfisher E1, In central basin high trend last well was Rappville (1985). Significant because; Prior to tight gas era old
Slide 14: Kingfisher – our first conventional discovery
Kingfisher – our first conventional discovery For personal use only Kingfisher E-1 gas discovery Drilled to Total Depth of 2,090 metres Large gas column of 138 metres with 30 metres of net pay Bottom zone was best performer on test 2,050-2,043.7m 2.97 million scfd through a 1” choke over
Slide 15: Kingfisher E1 flow testing
Kingfisher E1 flow testing For personal use only 15
Slide 16: Conventional/Tight Gas Resources
Conventional/Tight Gas Resources For personal use only PEL 16 Kingfisher 2C (Pmean) 77 Bcf Kingfisher 2C (P10) 284 Bcf 7 other Prospects & Leads Total Pre drill OGIP (Pmean) 391 Bcf Total Pre drill OGIP (P10) 4,360 Bcf PEL 13 5 Prospects and Leads Total Pre drill OGIP (Pmean) 299 B
Slide 17: Multiple development pathways – gas or power
Multiple development pathways – gas or power For personal use only 700 1x 3.5 Mtpa NSW Electricity LNG Plant Market with 600 Carbon price or direct policy Distance to Market (Km) 500 action Power 400 Brisbane 300 Gas Load Mini200 LNG Nth NSW 100 Electricity ad NRPS RVPS 0 Export LNG 0 100 200 300 40
Slide 18: Development pathways
Development pathways Infrastructure to support production gas as gas For personal use only gas as electricity East coast existing & emerging markets Northern NSW electricity market (16 PJ/a) Brisbane gas market (60 PJ/a) NSW electricity demand (290 PJ/a) Single 3mtpa LNG plant (180 P
Slide 19: In Summary
In Summary Basin focused player with a large For personal use only attractive acreage position Identified and growing CSG resources Newly discovered conventional resources with substantial upside potential Strategic location in a growing market Sound commercial development program Solid