Lomiko Metals Inc.

Lomiko Metals — Investor Presentation (February 2022)

38 slides from Lomiko Metals's investor presentation, Feb 2, 2022

  1. Slide 1: New Vision. New Strategy. New Energy.

    New Vision. New Strategy. New Energy. Creating a world of abundant renewable energy With Canadian critical minerals Lomiko Metals Inc. February 2022 1

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation is not a prospectus, offering memorandum or an advertisement and is being provided for information purposes only and does not constitute or form part of, and should not be construed as, an offer or invitation to sell or any solicitation of any offer to purchase or subscr

  3. Slide 3: Land Acknowledgement

    Land Acknowledgement We would like to begin by acknowledging that the land/projects where we operate are located within the traditional land of the Algonquin Anishnaabeg and Cree Eeyou Istchee Peoples. Our vision is to embrace Indigenous people and Indigenous values within our projects in order to d

  4. Slide 4: We will lead and accelerate the new energy circular economy

    We will lead and accelerate the new energy circular economy Our purpose is to be a people first company and build a major new energy platform in Quebec with Canadian critical minerals for a North American solution With Value creation on three pillars 1. Develop our projects to production 2. Originat

  5. Slide 5: Leaders with shared purpose

    Leaders with shared purpose Belinda Labatte, CEO Gordana Slepcev, COO Vince Osbourne, CFO CFA, MBA, ICD.D P.Eng., M.Sc. CMA, CBV • Chief • Senior finance Corporate professional Development with Sobeys Officer for • Over 19 years Mandalay experience in Resources finance • Over 20 years • Expertise in

  6. Slide 6: Board of Directors

    Board of Directors Eric Levy A. Paul Gill Anu Dhir Sagiv Shiv Chair of Corporate Compensation, Executive Chair Lead Independent Director Chair of Audit Governance and Nominating Chair of ESG Committee 1,2 Committee 1,3 Committee 3 Mr Gill is the Executive Mr. Shiv is a Managing Director at Mr. Levy

  7. Slide 7: All of Canada's new cars will be electric by 2035

    July 2021 Fed announces: All of Canada’s new cars will be electric by 2035 The challenge: To reach even 50% of EV penetration in vehicles requires 20x increase in battery supply. Renewable energy supercentres, longer life batteries, and charging stations can and should be sourced from Canadian criti

  8. Slide 8: Graphite: La Loutre belongs to crystalline flake graphite

    Graphite: La Loutre belongs to crystalline flake graphite Natural Graphite deposits of economic interest are grouped into three Synthetic Graphite is made by heating high-carbon materials main categories, as noted below and illustrated: like petroleum coke and coal-tar pitch to temperatures in • Amo

  9. Slide 9: Your phone runs on a rechargeable lithium-ion battery

    Your phone runs on a rechargeable lithium-ion battery, as do most of your other electronic devices • The first battery was invented in 1800 by Alessandro Volta What are batteries made of? • In 1859, Gaston Planté invented the first rechargeable battery. A battery is a collection of one or more cells

  10. Slide 10: Domestic battery supply chain development will spur graphite developers

    Domestic battery supply chain development will spur development of graphite developers EV and battery processing developments in North America are accelerating  Tesla in discussions with Quebec government on a battery factory  Lion Electric announced a 5 GWh battery factory in Quebec  Canada also

  11. Slide 11: Flake graphite demand up 11% - by 413kt in 2021

    Flake graphite demand up 11% - by 413kt in 2021 EV Breakdown Projected Sales (units) EV sales 90,000,000 Total BEV and PHEV sales are on track to top 11 M units by as 80,000,000 early as 2023, with forecast for average battery pack sizes 70,000,000 increasing 60,000,000 • Anode growth accelerates fo

  12. Slide 12: Graphite shortage starting in 2022 - Shortage to grow to 8Mt by 2040

    Graphite shortage starting in 2022 - Shortage to grow to 8Mt by 2040 Graphite Market Balance (Mt) 12,000,000 4,000,000 Projected Anode Demand (Mt) 10,000,000 2,000,000 9,000,000 - 8,000,000 8,000,000 7,000,000 -2,000,000 6,000,000 6,000,000 -4,000,000 5,000,000 4,000,000 4,000,000 -6,000,000 3,000,0

  13. Slide 13: Flake graphite price forecast 2021-2040

    Flake graphite price forecast 2021-2040: short term instability, long term uptick Graphite price is dependent on the flake size and purity. Benchmark Mineral Intelligence Q4 2021 forecast sees increased pricing for natural graphite flakes. Mesh size - microns 2021 /US$/t Long-term shortfall in the g

  14. Slide 14: La Loutre graphite project close to infrastructure and great geological setting

    La Loutre graphite project close to infrastructure and great geological setting La Loutre  Stage of development: Preliminary Economic Assessment ("PEA")  Starting Preliminary Feasibility Study  Concession size: 2,867 ha  Location: Quebec, Papineau - 192 km Highway to Port of Montreal – access to

  15. Slide 15: La Loutre Resource Estimate: focus on conversion

    La Loutre Resource Estimate: focus on conversion La Loutre Resource Estimate (Effective Date: May 14, 2021) - PEA Cutoff EV Deposit Battery Deposit Total (%) Run-of- In-Situ Run-of- In-Situ Run-of- In-Situ Graphite Class Mine Grade Mine Grade Mine Grade (kt) Tonnage Graphite Tonnage Graphite Tonnage

  16. Slide 16: La Loutre: PEA establishes a critical path ahead

    La Loutre: PEA establishes a critical path ahead for improvements and project de-risking  LOM plant production of 21,8 Mtonnes of mill feed at 6.78% Cg diluted.  Graphite concentrate production at 1.43 Mtonnes La Loutre Graphite Project grading 95.0% Cg.  14.7-year mine life producing 100,000tpy

  17. Slide 17: La Loutre: environmental studies key next steps

    La Loutre: environmental studies key next steps No conventional tailings facilities • Waste rock and tailings co-disposed WASTE ROCK & EV ZONE CODISPOSAL PILE • Efficient site water management  Pits sequenced to maximize the returns starting from North – EV Pits to South – Battery Pits  Stockpiles

  18. Slide 18: Exploration program

    Exploration program 2022 EV ZONE Infill and extension drilling along the strike of the deposits to confirm ore body shape and extents 18,700m drill program: 114 infill holes (16,700 m) and 13 extension holes (2,000m)  52 drill holes in EV Zone -9,000meters BATTERY drilled to date 49 holes for 6,942

  19. Slide 19: Additional exploration potential Step out in B and C zones

    Additional exploration potential Step out in B and C zones  New graphite zones  Follow up on preliminary greenfield exploration with drilling at Targets B & C. • Potential for 5,000 m drill program (15-20 holes) www.lomiko.com TSXV: LMR OTC: LMRMF FRANKFURT: DH8C 19 Source: NI 43-101 Technical Rep

  20. Slide 20: La Loutre study priorities Phase 1

    La Loutre study priorities Phase 1 Community engagement and communications • Meet with all communities on needs assessment and knowledge sharing - ongoing Continue with environmental baseline studies • Complete 4 full seasons of Environmental Baseline studies by end of 2022 • Submit Project registra

  21. Slide 21: La Loutre study priorities Phase 2

    La Loutre study priorities Phase 2 Other PFS studies • Initiate and complete geotechnical studies for pit structure and stability • Selection of additional exploration drill targets south of EV and Battery zones • Costing exercises to decrease initial capital requirements (contracting or leasing equ

  22. Slide 22: Corporate Budget Requirements La Loutre

    Corporate Budget Requirements La Loutre Phase 1 Cost ($M) Phase 2 Cost ($M) Resource Drilling $3.5 Mining & Mining Geotechnical $0.7 Metallurgy $0.6 Infrastructure Geotechnical $1.0 Environmental $0.7 Power $0.1 Total $4.8 Waste Disposal Facility $0.4 Environmental $1.3 Pre-Feasibility Study Budget

  23. Slide 23: NPV Scenario Analysis

    NPV Scenario Analysis PEA used a graphite concentrate selling price of US $916/t. The current forecast selling price is US $1000/t of graphite concentrate (source: Benchmark). Graphite Price Post-Tax NPV Post-Tax IRR % Payback (yrs.) (US$/t) (8%) $916 $186M 21.5% 4.2 $1,000 $239M 25.0% 3.7 $1,150 $3

  24. Slide 24: Highly prospective Bourier lithium assets close to infrastructure

    Highly prospective Bourier lithium assets close to infrastructure Bourier Bourier Lithium Project Stage of development: Early-Stage exploration  Concession size: 10,252 ha  Location: Quebec, Nemaska  Owned by Critical Elements with an earn in option up to 70% of the ownership  Geology - volcanic

  25. Slide 25: Bourier lithium project identifies 15 exploration targets

    Bourier lithium project identifies 15 exploration targets Bourier  Located on Nemiscau greenstone belt and Critical Elements south-east of the Eeyou Istchee James Bay territory in Quebec.  GoldSpot’s AI analysis revealed the considerable lithium potential  Next steps • Phase 1: Surface sampling o

  26. Slide 26: Capital Structure

    Capital Structure As at Feb 1, 2022 Shares Issued & Outstanding 276.3M Market Cap (Dec. 29) $24.4M Options 16.5M Cash* $3.8M Warrants 91.0M Debt $- Fully Diluted 383.8M Total Enterprise Value $20.6M Management & Insider Ownership 6.9% Note: * Excludes cash from last FT PP of $2.1M and Hard Dollar ra

  27. Slide 27: Comparable company analysis demonstrates value creation potential

    Comparable company analysis demonstrates value creation potential Feb 1, 2022 Cash & Cash Market Cap Measured Indicated Inferred EV/Resource Symbol Price Company Name Shares O/S Equivalents TEV (Current M) (Current M) (Mt) (Mt) (Mt) (M&I) TSXV:NOU 8.88 Nouveau Monde Graphite Inc 55 81 425 487 24.0 9

  28. Slide 28: How we will create success for all stakeholders

    How we will create success for all stakeholders Listen We will respectfully listen to communities and First Peoples concerns and considerations in order to maintain honour and respect Discuss We will discuss mutually acceptable opportunities in order to achieve a working partnership within all commu

  29. Slide 29: Appendix

    Appendix 29

  30. Slide 30: Flake Graphite Supply Forecast

    Flake Graphite Supply Forecast Total Graphite Supply - Projected (Mt) 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 500,000 - 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 Opportunity: The evolving nature of Chin

  31. Slide 31: Working on ECOLOGO certification

    Working on ECOLOGO certification Ecologo (UL) is an independent certification specifically designed for mineral exploration • It was set up as a third-party independent certification, set up jointly by UL and the AEMQ (Québec Association of Mineral Exploration). • Currently only in place for the pro

  32. Slide 32: Graphite and lithium in supply bottleneck

    Graphite and lithium in supply bottleneck • Graphite demand expected to increase 7x by 2030, behind lithium • Total lithium available will be enough to satisfy 22% of EV penetration • Both lithium and graphite to see supply deficit by 2024 • Lithium-ion batteries and fuel cells demand is set to grow

  33. Slide 33: Electric Vehicles Batteries

    Electric Vehicles Batteries Tesla plans to replace 18650 with 4680 DBL (dry battery electrode) Raw materials in an electric car battery of 100 kWh, weighing 600kg: • 7 kg of lithium (70g per kWh) • 10 kg of manganese • 11 kg cobalt (4.5kg for 75kWh) • 70 kg of nickel (Ni-Co-Al~ 8:1:1) • 125 kg graph

  34. Slide 34: We will create multiple ways to win with re-rate opportunities

    We will create multiple ways to win with re-rate opportunities S&P 500 performance (source: Cowen 03/21) • Battery names generate 700% returns in 12months • EV names generate 400% return • RE producers: trade at 28x EV/ EBITDA • Mining companies: trade at 4x EV/ EBITDA Source: QUÉBEC PLAN FOR THE DE

  35. Slide 35: Capital Structure

    Capital Structure As at Feb 1, 2022 Issued and Outstanding Shares (M) 276.3 Cash Balance Issue Date # of Options (M) Option Price Expiry Date February 28, 2019 3.4 $ 0.05 02-28-2022 Cash Balance (Q1 – Oct 31, 2021) $3.8M April 16, 2019 0.3 $ 0.05 04-16-2022 (Includes $1.3M in flow-through issuance c

  36. Slide 36: 30-Day Share Price and Volume

    30-Day Share Price and Volume As at Feb 1, 2022 $0.12 900,000 800,000 $0.10 700,000 $0.08 600,000 500,000 $0.06 400,000 $0.04 300,000 200,000 $0.02 100,000 $- - Volume Price Source: Yahoo Finance 30-Day average closing price $0.087 30-Day average trading volume: 306,284 www.lomiko.com TSXV: LMR OTC:

  37. Slide 37: Flow sheet La Loutre

    TAILINGS CRUSHER POLISHING MILL STIIRED DRYING AND MILL CLASSIFICATION SAG MILL FLOTATIO PRODUCT N Flow sheet La Loutre FLOTATIO N 37 Source: NI 43-101 Technical Report and Preliminary Economic Assessment (July 2021)

  38. Slide 38: Flow sheet La Loutre

    Flow sheet La Loutre Size Fraction Analysis of Combined Concentrate of LCT Size (Mesh) Size (µm) Mass (%) C(t) (%) C(t) Distribution (%) +32 +500 1.0 97.6 1.0 +48 +300 9.8 97.4 9.7 +80 +180 21.6 98.0 21.7 +100 +150 10.8 98.2 10.9 +150 +106 17.5 98.1 17.5 +200 +75 13.0 98.3 13.1 +325 +45 13.5 98.1 13

Lomiko Metals — Investor Presentation (February 2022) on 6ix