Gek Terna S.A. · ATHEX:GEKTERNA
Gek Terna — Investor Presentation (December 2023)
58 slides from Gek Terna's investor presentation, December 2023

Slide 1: Corporate Presentation
Corporate Presentation December 2023

Slide 2: Disclaimer
Disclaimer We have prepared this document solely for informational purposes. You should not rely upon it or use it to form the definitive basis for any decision, contract, commitment or action whatsoever, with respect to any proposed transaction or otherwise. You and your directors, officers, employ

Slide 3: Leading Transportation and Utility Infrastructure Platform
Leading Transportation and Utility Infrastructure Platform 3

Slide 4: GEK TERNA Group at a Glance
GEK TERNA Group at a Glance A diversified group strategically positioned in low risk and stable growth economic sectors with unparalleled execution capabilities, unique market positioning and expertise #1 Concessions Portfolio Key data #1 Concessions Investor/Developer #1 Motorways Operator >1,600 k

Slide 5: Corporate Milestones
Corporate Milestones Α History of Growth from a Leading Technical Company into a Vertically Integrated Infrastructure Investment Platform TERNA TERNA Energy HERON TERNA and GEK join TERNA absorbs GEK’s Listing of TERNA and Independent RES arm is TERNA is forces, forming one of construction division

Slide 6: Group Structure – Activities
Group Structure – Activities MCap €1.4Bn as of 23.11.2023 Conventional Construction Concessions RES Other Segments Energy 100% 100% 100% 37% 100% Motorways Operation I & Maintenance 75% (6) 100% 100% MCap €1.8Bn Egnatia Odos II as of 23.11.2023 Real Estate Assets (2) 100% 50% (5) 100% Attiki Odos Ko

Slide 7: Unique Value Proposition
Unique Value Proposition The Transportation and Utility Infrastructure Backbone of Greece 1 The Leading Core Infrastructure Player in The Transportation and Utility Sectors in Greece… 2 …With a Fully Integrated, and Naturally Hedged, Presence Across Both Sectors… 3 …Offering a Unique Combination of

Slide 8: The Leading Core Infrastructure Player in Greece
The Leading Core Infrastructure Player in The Transportation and Utility 1 Sectors in Greece… Strategic presence across the country with assets essential for everyday life Map of Operations Key Highlights Komotini CCGT • >1,600 km of roads under concession • Largest portfolio in Greece #1 • ~€8.0Bn

Slide 9: Fully Integrated, Naturally Hedged Presence Across Both Sectors
…With a Fully Integrated, and Naturally Hedged, Presence Across Both 2 Sectors… Transportation Segment Supported by the Leading Fully Integrated and Naturally Hedged Position in the Infrastructure/Construction Firm in the Country… Utility Sector Across: Construction segment LTM results ✓ Unique comb

Slide 10: What Makes us Different
2 …With a Fully Integrated, and Naturally Hedged, Presence Across Both Sectors (Cont’d)… What Makes us Different An established and Highly competitive …generating value Secured long term Uniquely vertically and versatile, during all stages of value creation with positioned for the integrated platfor

Slide 11: Vertically Integrated Platform with Selective Approach to Investments
2 …With a Fully Integrated, and Naturally Hedged, Presence Across Both Sectors (Cont’d)… Vertically Integrated Platform with Selective Approach to Investments, Ability to Scale Up Largest and Most Complex Projects and with Unique Competitive Positioning Illustrative IRR build-up for GEK TERNA in the

Slide 12: Secured Growth and Strong Yield
3 …Offering a Unique Combination of Secured Growth and Strong Yield… Secured Growth Across all the Group’s Main Activities Transportation Renewables Recent large tenders won Capacity (GW) Attiki Odos Egnatia Odos ✓ EV (100%) ~€3.3Bn ✓ Equity to be invested(1): ~€300m >6.0 ✓ Cumulative Distributions:

Slide 13: Adj. EBITDA Outlook
…Offering a Unique Combination of Secured Growth and Strong Yield… 3 (Cont’d)… • Operating profitability to double within the next 5 years (~20% CAGR)… • …driven by projects that are already secured and at various development stages related to concessions and RES GEK TERNA Group Adj. EBITDA Outlook

Slide 14: Average Annualised Cash Distributions from OpCos to Parent
…Offering a Unique Combination of Secured Growth and Strong Yield… 3 (Cont’d)… Highly Visible and Sustainable Cash Flow Streams to Shareholders with Significant Growth Expected Over the Coming Periods as Contracted Pipeline Assets Reach Commercial Operation Average Annualised Cash Distributions(1) f

Slide 15: Robust Capital Structure with Headroom to Fund Growth
…Facilitated by a Robust Capital Structure with Significant Headroom to 4 Fund the Upcoming Growth… Balanced approach on capital allocation, ensuring balance sheet health, growth and shareholder remuneration Growth Corporate Leverage Shareholder Remuneration • Expansionary capex for high • €0.9 Bn o

Slide 16: Funding Cost, Debt Capacity and Maturities
…Facilitated by a Robust Capital Structure with Significant Headroom to 4 Fund the Upcoming Growth (Cont’d)… Competitive Group All In Funding Cost GEK TERNA’s Debt Capacity Corporate Bond Covenant: 3.0x 4.38% 2.5 4.29% 3.89% 2.0 2.0 3.65% 1.9 FY 2020 FY 2021 FY 2022 H1 2023 FY2020 FY2021 FY2022 9M23

Slide 17: Group Net Debt Breakdown (9M 2023)
…Facilitated by a Robust Capital Structure with Significant Headroom to 4 Fund the Upcoming Growth (Cont’d)… Group Net Debt Breakdown (9M 2023) €Bn 0.4 1.0 0.6 1.2 2.1 0.9 Gross Debt Cash Net Debt Recourse Non-Recourse 17

Slide 18: Contracted, Long-term and Macro-resilient Cash Flows
…Which is Further Underpinned by Contracted, Long-term and Macro- 5 resilient Cash Flows… Transportation Infrastructure RES Portfolio able to generate significant, stable and recurring Long Term Contracted Revenue revenues in the long run Cumulative distributions split of Concessions portfolio & of

Slide 19: Shareholding Structure, Board and Committees
…Delivered by an Experienced Proven Management Team, Focused on 6 Sustainable Development… Shareholding Structure Board of Directors Committees Chairman and CEO Strategic Planning Committee George Peristeris Free Float ExCo 53.6% 15 Georgios Peristeris BoD Members 29.8% Audit Committee 53% non-execu

Slide 20: Sustainable Development at the Forefront of Strategy
…Delivered by an Experienced Proven Management Team, Focused on 6 Sustainable Development (Cont’d)… … Sustainable Development the forefront of the Group’s Strategy “The Group’s priority is the development and implementation of a strategy that focuses on continuous improvement and achievement of high

Slide 21: Track Record in Landmark Projects
…And with a Unique Track Record in Delivering the Country’s Most 7 Sought After, Landmark Projects in the Transportation and Utility Sectors KAFIREAS WIND PARK KOMOTINI CCGT • Kafireas, Evia, Greece • Komotini, East Macedonia and Thrace, Greece • Capacity: 330 MW • Capacity: 877 MW • Capex: €555M •

Slide 22: Key Financials Overview
Key Financials Overview

Slide 23: 9M / 3Q 2023 Highlights
9M / 3Q 2023 Highlights • Solid profitability driven by growth in infrastructure amid expected normalization of conventional energy – Rebound in RES in 3Q • 3Q23 Group adj. EBITDA exc. Conventional Energy +62% y-o-y in 9M23 • Group Revenues, Adj. EBITDA and net earnings modestly decline in 9M 2023 G

Slide 24: Group Revenues and Adj. EBITDA per Segment
Group Revenues and Adj. EBITDA per Segment Revenues 9M 2022 9M 2023 y-o-y % of total (9M 2023) (1) €m Construction 649.7 991.6 52.6% 37.8% RES 175.2 173.1 -1.2% 6.6% Concessions 152.7 166.0 8.7% 6.3% Conventional Energy Generation, Supply & Trading 1,901.2 1,271.5 -33.1% 48.5% HQ and Other 16.7 18.9

Slide 25: Consolidated Income Statement
Consolidated Income Statement €m 9Μ 2022 9Μ 2023 y-o-y • Revenues decline on the back of lower contribution from Conventional Energy Revenues 2,762.0 2,529.3 -8.4% vis-a-vis lower energy prices Adj. EBITDA 404.8 396.3 -2.1% • Operating profitability supported by growth in infrastructure (Concessions

Slide 26: Debt Highlights I: Leverage KPIs
Debt Highlights I: Leverage KPIs Operating profitability supports financial position with headroom and liquidity to facilitate investment pipeline Group Net Debt (1) (€m) Parent Co. Cash position & Net Debt (2) (€m) Net Debt/ 2.8x 2.1x 2.5x Adj.EBITDA 557.1 559.1 542.0 1,630 1,444 1,366 336.8 335.4

Slide 27: Debt Highlights II: Financial Debt By Segment
Debt Highlights II: Financial Debt By Segment €M 9M 2023 FY 2022 Gross Debt Cash(1) Net Debt/(Cash) (1) Gross Debt Cash(1) Net Debt/(Cash) (1) Construction 156.1 196.9 (40.8) 80.0 200.7 (120.7) o/w external debt 100.4 69.8 RES 1,151.1 287.5 863.6 1,030.8 362.5 668.3 Conventional Energy 165.5 170.9 (

Slide 28: Debt Highlights III: Debt Breakdown by Subsidiaries
Debt Highlights III: Debt Breakdown by Subsidiaries GEK TERNA Group debt (9M 2023) ~68% non-recourse Parent Co, 29.1% TERNA Energy Group, 39.5% € 3.1 bn GEK TERNA Kasteli, 3.1% Other, 1.6% Heron I&II, 2.2% TERNA, 3.2% GEK TERNA Motorways, 7.0% Motorways Op Cos, 14.3% 28

Slide 29: Appendix 1: Concessions: Deep Dive
Appendix 1: Concessions: Deep Dive

Slide 30: Strategic Presence Across the Country
Strategic Presence Across the Country Critical assets with multiple opportunities to extract additional value through synergies and vertical integration INDICATIVE NEW PROJECTS AT TENDER Komotini CCGT PROCESS OR EXPECTED TO COME TO THE MARKET Egnatia Odos • North Crete Motorway Kavala Port • Kalamat

Slide 31: Concessions Portfolio Overview
Concessions Portfolio Overview GEK TERNA motorways portfolio exceeds 1,600km (inc. Egnatia and Attiki Odos) with an average remaining lifetime of ~25 years and total Invested Equity to exceed €1.2bn … EQUITY INVESTED/TO COMMERCIAL CONCESSION MOTORWAYS LENGTH (100% KM) % STAKE BE INVESTED (€M) OPERAT

Slide 32: Concessions – Assets Overview
Concessions – Assets Overview Diversified portfolio of mature and under development assets, strategically located across the country Kentriki Odos (E65) Parking • Total length: 150km • Parking stations all over Greece ✓ Equity invested €67M (100%) ✓ 2,235 total spaces ✓ Senior Bank debt (non recours

Slide 33: Attiki Odos At-a-glance
Attiki Odos At-a-glance On September 14, GEK TERNA was declared preferred investor by HRADF for the 25-year concession of Attiki Odos for a total consideration of €3.270Bn Attiki Odos Overview Map of Attiki Odos • Attiki Odos is a project constructed on a concession basis and constitutes one of the

Slide 34: Attiki Odos - Strategic Value for GEK Terna
Attiki Odos - Strategic Value for GEK Terna ✓ Strategic & high quality asset • Essential asset of the domestic road network, linking major transportation and infrastructure facilities with ~237k AADT 1 • Backbone of Attica connecting all modes of transportation and infrastructures, i.e., road (natio

Slide 35: Attiki Odos – Financial KPIs
Attiki Odos – Financial KPIs • Very low risk project given traffic data and contractual provisions • Returns (base case) within the range that GEK TERNA Group traditionally aims and achieves • Upside potential Key financials – Base case Traffic CAGR Low single digit Avg. annual > €300m (2024–49) EBI

Slide 36: Concessions – Egnatia Odos at a Glance
Concessions – Egnatia Odos at a Glance Overview Main Concession Highlights ✓ Concession Period: 35 years Key Metrics (2027E) ✓ Toll Stations: 18 frontal stations and 43 lateral toll stations Transactions: 217.6m ✓ Project Budget: over €2.7bn (acquisition cost €1.5bn, ` €0.7bn construction cost, fina

Slide 37: Concessions – Ionia and Kentriki Odos at a Glance
Concessions – Ionia and Kentriki Odos at a Glance Overview Main Concession Highlights ✓ “Ionia Odos” • Concession Grant: 2007 Concession Project • Concession End: 2037 • Concession Grant: 2007 • Total Length: 231km, E-65 Motorway • Concession End: 2037 currently operational 136km • Total Length: 380

Slide 38: Concessions – Kasteli Airport at a Glance
Concessions – Kasteli Airport at a Glance Overview Main Concession Highlights ✓ It is one the most significant investments that have taken place in Key Metrics (2027E) the island of Crete and one of the country’s top infrastructure projects Pax (2019A) (2): 8m Pax (2022A) (2): 8.1m ✓ Construction is

Slide 39: Concessions – Hellinikon IRC at a Glance
Concessions – Hellinikon IRC at a Glance Main Concession Highlights • Site: The site is unique, located in the south coastline of the greater Athens area within the overall Hellinikon Project (largest waterfront development in Europe’s history) and in proximity to the Athens center and major transpo

Slide 40: Concessions Financial Highlights
Concessions Financial Highlights (€m) 9M 2022 9M 2023 • Traffic in motorways increases 9.3% y-o-y in 9M 2023 following pick-up in economic activity and improved weather conditions Revenues 152.7 166.0 • Launch of commercial operations of Peloponnese waste management project Adj. EBITDA 82.8 114.7 •

Slide 41: Appendix 2: Construction Segment Deep Dive
Appendix 2: Construction Segment Deep Dive

Slide 42: Construction – Overview
Construction – Overview Auxiliary business enhancing investment capability, while de-risking project execution Revenue (€Bn) and EBIT Margin (%) Evolution • Key competitive advantage, offering vertical integration (~65% of backlog refers to own projects and concession add- 7% 6% 7% ons) 1.4 1.0 • Cu

Slide 43: Construction – Backlog
Construction – Backlog ~90% of Backlog refers to projects in Greece Backlog Evolution (€Bn) Backlog (€Bn) 9M23 Value Project 5.5 (€Bn) 5.3 Motorways / Concessions add-ons (Central Greece-Nea 0.8 Odos-Olympia-North Crete) 4.9 Amfilochia Pump Storage 0.6 2.2 Kasteli Airport 0.5 2.4 PV Stations 0.2 2.4

Slide 44: Construction Financial Highlights
Construction Financial Highlights (€M) 9M 2022 9M 2023 • High execution pace (LTM Revenues ~€1.4Bn) – Activity levels boosted by the execution of new private Revenues 649.7 991.6 projects in Greece (inc. those that the group participates as investor) as well as public projects Adj. EBITDA 45.4 80.0

Slide 45: Appendix 3: Utility Infrastructure Deep Dive
Appendix 3: Utility Infrastructure Deep Dive

Slide 46: Greek Energy Market Update 9M 2023
Greek Energy Market Update 9M 2023 Greek Power Market Generation Mix Greek DAM (€/MWh) 39.6 39.2 37.8 458 447 41.6% 45.7% 48.2% 363 9.2% 5.9% 11.1% 307 Net Imports 298 269 264 264 260 31.6% 37.4% 251 230 242 40.8% RES 221 252 264 10.1% 8.4% 168 147 7.5% Hydro 210 133 129 115 100 112 137 128 38.5% 36

Slide 47: Greece: ~18 GW of RES to be Added by 2030
Greece: ~18 GW of RES to be Added by 2030 and ~28 GW by 2040 • The recently updated NECP indicating the significant growth potential of the GR RES market… • …driven by the EU wide push to reach Net Zero by 2050 Today NECP(1) 2030 Target Estimated(1) 2040 Target 3% 9% 7% 22% 9% 29% 14% 31% 34% ~15.0

Slide 48: Energy from RES – Portfolio Overview (I)
Energy from RES – Portfolio Overview (I) • Leading Renewable Energy Company in Greece, with Established Presence in Poland and Bulgaria • Large operating asset base located at the most favourable locations in the respective countries • Young fleet with substantial remaining contracted PPA lifetime K

Slide 49: Energy from RES – Portfolio Overview (II)
Energy from RES – Portfolio Overview (II) • High quality, diversified and complementary portfolio • Substantial long-term, secured and predictable cash-flow Largest Portfolio In The Greek Market Technologically Diversified + 11 GW (2) Projects ✓ ✓ ✓ ✓ ✓ ✓ 1.2 GW Wind Solar Hydroelectric Biomass Wast

Slide 50: TERNA ENERGY Growth Targets
TERNA ENERGY Growth Targets • Installed capacity to exceed 6.0 GW by 2029 • Mid-term milestone >80% covered with under construction and RTB capacity > 6.0 GW > 3.3 GW ~2.5 GW ~1.3 GW under construction and RTB 1.2 GW 2023 Mid-term 2029 Wind Solar Hydro/Hybrid Targets well underpinned by 12 GW portfo

Slide 51: RES Financial Highlights
RES Financial Highlights • Installed capacity at 1.2 GW post Kafireas completion (vs. 0.9 GW in (€M) 9M 2022 9M 2023 end-2022) • Normalised wind conditions for August and September along with Revenues 175.2 173.1 increased effective capacity drive generation higher, allowing to recover slow start of

Slide 52: Conventional Energy Generation, Supply and Trading – Overview
Conventional Energy Generation, Supply and Trading – Overview An Integrated and Balanced Business Model Offsetting Extreme Energy Scenarios Supply 9M 2023 Adj. EBITDA Per Activity • 2nd largest IPP in Greece ~5 TWh • 11% market share Generation Trading + RES PPAs • Unique Trading capabilities 53% Su

Slide 53: Conventional Energy Generation, Supply & Trading Financial Highlights
Conventional Energy Generation, Supply & Trading Financial Highlights (€M) 9M 2022 9M 2023 • Market backdrop becoming less volatile ‒ Power prices decline 57% y-o-y following nat. gas price trends Revenues 1,901.2 1,271.5 ‒ Demand down by 3.7% y-o-y in 9M23 on milder winter and reduced adj. EBITDA 1

Slide 54: Appendix 4: ESG Highlights
N i \ ) NY i i. . at ce “le : wt = > 77a

Slide 55: Our ESG Highlights
Our ESG Highlights ✓ Optimum balance between economic performance and responsible environmental and social practices ✓ Operations with direct and indirect economic, social and environmental impact ✓ ESG committee established ✓ Implementation of a sustainable development policy to address such challe

Slide 56: Recent Achievements
Recent Achievements GEK TERNA Participated In CDP Climate Change for the First Time In 2022, Scoring Above Construction Sector and Global Average Your CDP score Average performance B C B C Construction Europe Global Average Understanding Your Score Report A GEK TERNA SOCIETE ANONYME HOLDINGS REAL ES

Slide 57: ESG KPIs
ESG KPIs 2021 2022 People Total number of employees (Greece& Abroad) including JVs 5,470 6,730 Total number of employees (Greece& Abroad) 3,371 4,369 Percentage of female employees (Greece) 28.76% 25.72% Percentage of female employees (Abroad) 21.55% 16.00% Percentage of female employees at the top

Slide 58: Investors Contacts
Investors Contacts Argyris Gkonis - IR Officer agkonis@gekterna.com Upcoming IR Roadshows and Conferences +30 210 6968499 Date Event December 6-7/23 Winter Wonderland EMEA Conference - Prague (Wood&Co) Investor Relations Desk December 11/23 Capital Link – New York, US ir@gekterna.com J.P. Morgan & A
Source: Internet Archive copy of gekterna.com
More decks from Gek Terna S.A.
Investor Presentation (May 2026)59 slides · May 2026
Investor Presentation (April 2026)58 slides · April 2026
Investor Presentation (November 2025)59 slides · November 2025
Investor Presentation (October 2025)60 slides · October 2025
Investor Presentation (May 2025)52 slides · May 2025
Investor Presentation (October 2024)54 slides · October 2024