Tribeca Resources Corporation · TSXV:TRBC

Tribeca Resources — Investor Presentation (March 2023)

34 slides from Tribeca Resources's investor presentation, March 2023

  1. Slide 1: Delivering the next generation of copper mines in Chile

    Delivering the next generation of copper mines in Chile CORPORATE PRESENTATION MARCH 2023 TSXV: TRBC

  2. Slide 2: Disclaimer

    Disclaimer This document has been prepared by Tribeca Resources Corporation. (the “Company”) to introduce the Company’s mineral exploration projects. Because it is a high-level summary presentation, the information contained herein cannot contain all the information that should be reviewed before ma

  3. Slide 3: The need for copper

    The need for copper

  4. Slide 4: Copper is essential for the modern world

    THE NEED FOR COPPER Copper is essential for the modern world An average advanced-country human consumes 10-15 kg of copper per year1 Household Consumer Construction: Electrical Transportation: electronics: electronics: infrastructure: A/C, refrigerator, smartphones residential and power grid, cars,

  5. Slide 5: Copper plays pivotal role in green energy transition

    THE NEED FOR COPPER Copper plays pivotal role in green energy transition Near doubling of annual consumption expected by 2040 “ Demand for copper — already on a rising trend — is arguably set to explode as the energy transition takes hold. − Wood Mackenzie, Julian Kettle Sr. V.P. Metals and Mining A

  6. Slide 6: Introduction to Tribeca Resources

    Introduction to Tribeca Resources

  7. Slide 7: We are a copper exploration company focused on discovering and developing assets in the Chilean Coastal IOCG belt

    INTRO TO TRIBECA Experienced Science- team with driven leading IOCG We are a copper exploration expertise company focused on discovering and developing assets in the Prolific Chilean Drill-ready Chilean Coastal IOCG belt Coastal IOCG Belt targets People and Growing planet portfolio via conscious con

  8. Slide 8: Management Team

    INTRO TO TRIBECA Management Team Exceptional track-record in Latin American copper, exploration, finance and M&A Team Member Background Notable Experience Dr. Paul Gow Geologist Former Glencore GM Projects/Exploration CEO, Director 25+ years experience Geologist with extensive experience in mineral

  9. Slide 9: Experienced Board

    INTRO TO TRIBECA Experienced Board Diverse capabilities, with deep mining, investing and company-building experience Team Member Background Notable Experience Lisa Riley Equity Research Advisor and former Equity Research at RBC, TD, Lehman and Santander Director, 25+ years experience Independent con

  10. Slide 10: Recent accomplishments and next steps

    INTRO TO TRIBECA Recent accomplishments and next steps Key accomplishments 2017 - 2022 Completed 4 property acquisitions in the “La Higuera” mining district in Chile (privately funded) Feb ‘22 Completed a C$2.6 million private placement financing Nov ‘22 Listed on TSX-V via RTO with cash shell (~C$6

  11. Slide 11: Capital structure and ownership

    INTRO TO TRIBECA Capital structure and ownership Listed on TSX-V trading under “TRBC” ticker Corporate Information Shareholder breakdown (non-diluted) Share Price (3-Mar-2023) C$0.32 Shares Outstanding (# shares) 51.887M Warrants (# warrants) 1.250M Options (# options) 1.755M Fully Diluted (# shares

  12. Slide 12: Our approach

    Our approach

  13. Slide 13: New approaches are unlocking IOCG opportunities

    APPROACH New approaches are unlocking IOCG opportunities Why hunt for new IOCG deposits? Low exploration maturity New concepts/ technologies Variety of deposit types with can be applied by-product credits Major Global IOCG Belts Giant Deposits Resource* Company 1. Gawler Craton (Australia) Olympic D

  14. Slide 14: Chilean Coastal IOCG Belt is ripe for discovery

    APPROACH Chilean Coastal IOCG Belt is ripe for discovery Key regional advantages 1) infrastructure-rich 2) low altitude 3) access to sea water 4) under-explored with historic focus on outcropping areas 7 major Chilean Coastal IOCG Belt deposits (within the ~1,000 km N-S area Tribeca is focussed on)

  15. Slide 15: Our strategy: science-led, portfolio driven exploration

    APPROACH Our strategy: science-led, portfolio driven exploration Differentiated from the all-or-nothing, single asset, high G&A junior template Seeking superior risk-adjusted returns by bringing a science-led approach to exploration & discovery in the Chilean Coastal IOCG belt Portfolio Approach Dis

  16. Slide 16: La Higuera IOCG Project

    La Higuera IOCG Project

  17. Slide 17: La Higuera IOCG Project: Overview

    PROJECT La Higuera IOCG Project: Overview Gaby Cu-Au-Fe-Co System La Higuera NW Extension - 285m @ 0.40% Cu, 0.08 g/t Au, 23.5% Fe, 260ppm Co from Geophysical targets on • Located 500km north of Santiago extensions to historic high 100m. - 36m @ 0.66% Cu, 0.14 g/t Au, grade mining operation • Estima

  18. Slide 18: La Higuera IOCG project: Phase 1 program

    PROJECT La Higuera IOCG project: Phase 1 program Phase 1 exploration: Drill test extensions under cover Objective at La Higuera: test under thin gravel cover to determine size of two key mineralized systems “Gaby” and “Chirsposo” GABY 2. Drill geophysical anomalies and increasing grade under thin gr

  19. Slide 19: La Higuera IOCG Project: Two advanced drill targets

    PROJECT La Higuera IOCG Project: Two advanced drill targets Step out from best historical intersections to drill under cover 1. Gaby 2. Chirsposo GBY006 GBY007 GBY001 CAB0006: 82m @ 0.35% Cu, 540ppm Co to EOH +500ppm Cu in soils Gravel cover (20m?) UNTESTED GABY: IP geophysical anomaly continues und

  20. Slide 20: Gaby target - 2023 drill results

    PROJECT Gaby target - 2023 drill results GBY001-GBY003 results received GBY001 intersection: 268m at 0.66% copper and 0.14 g/t gold incl. 90m at 1.02% copper and 0.23 g/t gold A C B D 20

  21. Slide 21: Gaby target - 2023 drill results

    PROJECT Gaby target - 2023 drill results GBY004-GBY005 results received GBY004 94m at 0.34% copper, 0.07 g/t gold from 38m at base of gravel cover GBY005 90m @ 0.20% Cu, 0.04 g/t gold from 244m including 20m @ 0.42% copper, 0.09 g/t gold from 270m within a 200m downhole interval of copper sulphide m

  22. Slide 22: Pending drill results

    PROJECT Pending drill results 3 holes step-out up to 650m north of historic drilling Gaby drilling (GBY001, 006, 007) • GBY006: 250m step-out from GBY001 • GBY007: further 250m step-out 2 holes to east of main trend Chirsposo drilling (GBY002,003) • 2 holes at Chirsposo 3km to south are in progress

  23. Slide 23: La Higuera Project Targets

    PROJECT La Higuera Project Targets Gaby Five targets IOCG Benja Gaby: • Mineralized system open to the north and with depth, additional geophysical targets Benja: – Magnetic complex with coincident variable intensity chargeability anomalism. Mapping Chirsposo and surface geochemistry planned. Chirsp

  24. Slide 24: Investment case

    Investment case paul.gow@tribecaresources.com www.tribecaresources.com thomas.schmidt@tribecaresources.com 24

  25. Slide 25: Peer comparison: significant re-rating potential

    INVESTMENT CASE Peer comparison: significant re-rating potential Selected peers with copper and/or IOCG projects in South America Mkt Cap. Company Main Project Country Project stage Deposit Type Metals Exchange (US$ MM)* Filo Filo del Sol PFS Porphyry Cu-Au-Ag TSX 2,013 Far Western Santo Domingo PEA

  26. Slide 26: Delivering next generation of IOCG mines in Chile

    INVESTMENT CASE Delivering next generation of IOCG mines in Chile Copper dominant with gold and possible cobalt credits Tribeca Investment proposition Copper is Differentiated Upside critical strategy potential The world needs more Science-led team Large drill-ready mineralized copper system at La H

  27. Slide 27: Appendices

    Appendices www.tribecaresources.co paul.gow@tribecaresources.com m thomas.schmidt@tribecaresources.com

  28. Slide 28: La Higuera IOGC Project

    APPENDICES La Higuera IOGC Project Mining concessions & underlying ownership (100% purchase (100% direct option)1 ownership) (100% direct ownership) (100% direct ownership) 1 US$2million one-time payment due in March 2024. 5% Exploration Levy due on exploration work carried out during option period.

  29. Slide 29: The broader La Higuera district

    APPENDICES The broader La Higuera district Current and proposed infrastructure (100% direct ownership) 29

  30. Slide 30: Early-stage targets at Caballo Blanco

    APPENDICES Early-stage targets at Caballo Blanco EARLY STAGE Additional TARGETS: based on geophysical targets geophysical data Chirsposo Location of Zone historical geophysical datasets shown DON BAUCHA: Intense magnetic and LEGEND Magnetic chargeability target – Susceptibility (SI) 1 hole to date D

  31. Slide 31: Chirsposo IOCG system: historic core hole CB-01

    APPENDICES Chirsposo IOCG system: historic core hole CB-01 Thick cm-scale veins of c.g. py+qtz+mt±cal overprinting a massively mt±silica replaced f.g. rock. (CB-01 159m) Later qtz-cpy-epi±mt alteration Strong texturally-destructive qtz-cpy- epi±mt alteration, overprinting wispy mt- act±chl banded ro

  32. Slide 32: Historical work summary

    APPENDICES Historical work summary 6,800 meters of drilling and met test work suggesting Cu recoveries of 85-90% Drilling Gaby metallurgical test-work Gaby: 4,058m drilled in 12 holes targeting IP & ground • 2006 metallurgical test work (G&T Metallurgical magnetic anomalous zones Services Ltd) on tw

  33. Slide 33: Photo Gallery

    Photo Gallery INCREASING IN SIZE WITH DRILLING ON PROPERTY

  34. Slide 34: TSXV: TRBC

    TSXV: TRBC www.tribecaresources.com | admin@tribecaresources.com

Tribeca Resources — Investor Presentation (March 2023) on 6ix