23 slides from St. George Mining's conference presentation, Apr 2, 2025
Slide 1: St George at the Tribeca Future Facing Commodities Conference, Singapore
ASX RELEASE. 2 April 2025 St George at the Tribeca Future Facing Commodities Conference, Singapore St George Mining Limited (ASX: SGQ) (“St George” or “the Company”) is participating in the 2025 Tribeca Future Facing Commodities Conference in Singapore as a Company Sponsor. Attached is a copy of St
Slide 2: Niobium. Rare earths. World class.
Tribeca Future Facing Commodities Conference 2025 Singapore Niobium. Rare earths. World class.
Slide 3: Disclaimer
Disclaimer Forward-Looking Statements: This Presentation may include forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning St George’s planned exploration program and other statements that are not historical facts. Although St George believes t
Slide 4: St George becomes a global player in niobium and rare earths
St George becomes a global player in niobium and rare earths with the 100% acquisition of the advanced niobium-REE Araxá Project in Brazil - acquisition completed on 26 February 2025 ASX: SGQ | St George Mining Limited 3
Slide 5: Araxá Project – Investment Highlights
Araxá Project – Investment Highlights Advanced and de-risked world-class niobium-REE opportunity • Araxá is located in world’s leading district for niobium production and adjacent to the flagship Tier 1 location for niobium- operation of CBMM, the world’s largest niobium producer with ~80% of global
Slide 6: JORC resource
JORC resource1 Globally significant niobium and rare earths deposits Niobium resource TREO resource 41.2 Mt at 0.68% Nb₂O₅ (6,800ppmnNb₂O₅) 40.6 Mt at 4.13% TREO (41,300ppm TREO) comprising (at a cut-off of 0.2% Nb₂O₅): comprising (at a cut-off of 2% TREO): Classification Million tonnes (Mt) Nb₂O₅ (
Slide 7: Mineralisation open in all directions
Mineralisation open in all directions Resource expansion potential • High-grade niobium and rare earth mineralisation remain open in all directions • • Grades up to 82,970ppm (8.29%) Nb₂O₅ and 329,800ppm (32.98%) TREO underscore high quality mineralisation1 • Outstanding potential for an order of ma
Slide 8: Araxá Project
Araxá Project Favourable location and project logistics MOSAIC St George’s TIER 1 NIOBIUM LOCATION Facilities ARAXÁ Project • Araxá Project is located within the Barreiro Carbonatite complex – a 5km wide carbonatite hosting hard-rock niobium, REE and phosphate mineralisation • Surrounded by world-cl
Slide 9: Niobium
Niobium Global supply concentration with only three producers Niobec Quebec, Canada CMOC 9% Goias, Brazil 11% CBMM Minas Gerais, Brazil 2024 Global supply of niobium by primary producers2 80% Refer to Appendix A for full list of references ASX: SGQ | St George Mining Limited 8
Slide 10: Niobium – Future Facing Commodity
Niobium – Future Facing Commodity Essential for modern high-tech applications Niobium is produced into Ferroniobium (88% of demand) and Niobium oxide (12%)1 Ferroniobium Niobium Oxide • Widely used in the steel • Niobium oxide is produced industry to deliver through further refinement performance im
Slide 11: Araxá Project Development
Araxá Project Development • Ready to Deliver Value for Shareholders ASX: SGQ | St George Mining Limited 10
Slide 12: Project Delivery Team
Project Delivery Team In-country experts Brazil Team Director, Corporate Development: Caue (Paul) Araujo Experienced natural resources executive, previous roles include Global Director, ESG and Technical Development: Thiago Amaral General Manager (Mine Finance) at Palaris; Partner / Regional Directo
Slide 13: Supportive State Government
Supportive State Government MoU signed to expedite project approvals • Expedited Licensing: St George on 30 October 2024 signed a non-binding Memorandum of Understanding with the State of Minas Gerais (Invest Minas) • The State will assist with progressing regulatory approvals in an accelerated mann
Slide 14: Development partnerships
Development partnerships Processing, engineering and construction EMBRAPII and SENAI – optimizing the processing flowsheet EPC+F partner – Xinhai Mining Technology St George and two of Brazil’s leading scientific agencies – EMBRAPII and St George and the Xinhai Group – a global service provider to t
Slide 15: Advancing the Araxá Project
Advancing the Araxá Project Initiatives underway with strong newsflow NEWSFLOW • Two mining concession applications and one exploration permit. Licencing progresses Permitting Process in 2025 • Engagement with Government and licensing authorities commenced. • Resource modelling commenced using exten
Slide 16: Company Overview
Company Overview Led by an experienced Board, the share price has responded favourably to the Araxá acquisition Company Snapshot A$20 million capital raising ASX Code SGQ A$20m raise completed on 21 February 2025: • New shares issued at $0.02 per share Share Price (1 April 25) A$0.02 • Free attachin
Slide 17: ST GEORGE MINING LIMITED
ST GEORGE MINING LIMITED Building a globally significant niobium-REE mining company ASX: SGQ | St George Mining Limited 16
Slide 18: Appendix A - References
Appendix A - References Slides 4 and 5: Slide 8 1. See our ASX Release dated 1 April 2025 entitled “High-Grade Niobim and REE 1. Mordor Intelligence, Global Niobium Market 2022-2029. JORC Resource for Araxa” for details on the JORC resource. 2. Mordor Intelligence, Global Niobium Market 2022-2029; C
Slide 19: Appendix B – Key Risks
Appendix B – Key Risks The future performance of the Company and the value of its shares may be influenced by a range of factors, many of which are largely beyond the control of the Company and its directors. Key risks associated with the Company’s business and the industry in which it operates as w
Slide 20: Appendix B – Key Risks (continued)
Appendix B – Key Risks (continued) The future performance of the Company and the value of its shares may be influenced by a range of factors, many of which are largely beyond the control of the Company and its directors. Key risks associated with the Company’s business and the industry in which it o
Slide 21: Appendix B – Key Risks (continued)
Appendix B – Key Risks (continued) The future performance of the Company and the value of its shares may be influenced by a range of factors, many of which are largely beyond the control of the Company and its directors. Key risks associated with the Company’s business and the industry in which it o
Slide 22: Appendix C – References to previous announcements
Appendix C – References to previous announcements This ASX announcement contains information extracted from the following reports which are available on the Company’s website at www.stgm.com.au: • 1 April 2025 High-Grade Niobium and REE JORC Resource for Araxa • 6 August 2024 Acquisition of High-Gra
Slide 23: Competent Person Statement
Competent Person Statement Competent Person Consent - MRE The information in this Presentation that relates to Mineral Resource Estimate and historical/foreign results is based upon, and fairly represents, information and supporting documentation reviewed and compiled by Mr. Beau Nicholls, a Compete