UK Oil & Gas PLC · LSE:UKOG

UK Oil & Gas — Investor Presentation (June 2021)

15 slides from UK Oil & Gas's investor presentation, June 2021

  1. Slide 1: Corporate Presentation June 2021

    Corporate Presentation June 2021

  2. Slide 2: Disclaimer

    Disclaimer The information contained in this confidential document (the “Presentation”) has been prepared by UK Oil & Gas Plc (the “Company” or “UKOG”)) solely for informational purposes. It has not been fully verified and is subject to material updating, completion, revision, verification and furth

  3. Slide 3: Disclaimer (cont.)

    Disclaimer (cont.) deal, or attempt to deal, in financial instruments (as defined in MAR) relating to that information, or encourage another person to deal or disclose the information before the inside information is made public; (ii) or cancel or amend an order which has already been placed concern

  4. Slide 4: UKOG: An Expanding International Energy Company

    UKOG: An Expanding International Energy Company Turkey: New appraisal & exploration portfolio in underexplored area. Contains same petroleum system as adjacent Iraqi KRI giant fields: • Resan M47 b1,b2 Licence (305 km2 50% interest) Basur-Resan Oil Appraisal Project Basur-3 appraisal well summer 202

  5. Slide 5: Horizons expanding beyond the UK into Turkey

    Horizons expanding beyond the UK into Turkey “We remain committed to growing our core UK business, but this was an irresistible opportunity to expand our horizons and to expose the company to potentially transformational recoverable oil reserves that can be rapidly monetised. The quality of the geol

  6. Slide 6: Why is 2021 operational focus squarely on Turkey Basur-Resan?

    Why is 2021 operational focus squarely on Turkey Basur-Resan? • Larger upside potential than UK onshore - equivalent probability of success • Rapid monetisation, months versus around 5 years in UK • Low-cost drilling and operating cost environment vs. UK • Further significant growth opportunities vi

  7. Slide 7: SE Turkey: A far more prolific oil province than UK Weald Basin

    SE Turkey : A far more prolific oil province than UK Weald Basin • SE Turkey has 18 times more produced & proven oil than the entire UK Weald Basin (572 mmbbl vs. 32 mmbbl) • The area between Resan and the giant Kurdistan Region of Iraq oil fields remains largely unexplored • SE Turkey has significa

  8. Slide 8: UKOG Turkey active in area overlooked for 50 years

    UKOG Turkey active in area overlooked for 50 years • 1950s-60s Basur discovery well, 2 wells in SE of Basur- Resan structure with good oil indications and oil to surface • 1960s-2013, 3 wells in remaining 600 km² in 50 years, no Resan licence useful seismic coverage over application area Basur-Resan

  9. Slide 9: Resan Licence: Basur-Resan oil discovery

    Resan Licence: Basur-Resan oil discovery • Basur-Resan is a significant asymmetric N anticline with surface expression East Sadak oil field confirmed by seismic. Maximum extent c. Basur-Resan 70 km². Updip from lookalike E. Sadak geological lookalike producing field • Basur-1 flowed 500 bbl in 6 hou

  10. Slide 10: Prize bigger than UKOG's UK appraisal projects

    Prize bigger than UKOG’s UK appraisal projects • Xodus’ Basur-Resan discovered gross mean recoverable volumes exceed all Weald’s historic production + reserves • Oil in ground demonstrated by Basur & Resan wells - need to establish commercial rates and volumes Gross mean case: Gross high case: • 1.2

  11. Slide 11: UKOG projects: net discovered recoverable volumes

    UKOG projects: net discovered recoverable volumes Basur-Resan UKOG net discovered mean case oil volumes are materially larger than UKOG’s Weald Basin projects: • Over 7 times larger than Arreton Portland • Over 3 times larger than Loxley Portland (oil equivalent) Basur-Resan Basur-Resan (high case 5

  12. Slide 12: Rapid monetisation in under 1 year possible

    Rapid monetisation in under 1 year possible • Rapid monetisation, months versus years in UK • UK 4-5 year wait to long term production erodes ~40% of project net present value • AME’s E. Sadak field in production within 1 month of well finish, official production consent in 7 months • Right to produ

  13. Slide 13: Lower cost operations

    Lower cost operations • Lower cost environment versus UK • Drilling cost based upon AME E. Sadak field costs is approx. ⅓ of the per metre cost of UKOG’s UK wells • Basur-3 appraisal well AME cost estimate $3 million drilled & tested • Lower export, manpower and service costs • Field operating cost

  14. Slide 14: Basur-3 Site Completed - Drilling planned end June 2021

    Basur-3 Site Completed- Drilling planned end June 2021 14

  15. Slide 15: Further growth potential in adjacent underexplored area

    Further growth potential in adjacent underexplored area • New Licence application contains SE extremity of Basur- Resan oil accumulation (light green) plus possible further Prospect A extension (yellow) to SE on geological trend. Basur-3 location • Recent Bukat-1 understood to have brought oil to su

UK Oil & Gas — Investor Presentation (June 2021) on 6ix