Slide 1: Fort Hills Project
Fort Hills Project September 2015
Slide 2: Mining and Bitumen Extraction Process
Mining and Bitumen Extraction Process 1
Slide 3: Process Technology
Process Technology High temperature paraffinic froth treatment provides about 20% partial upgrading advantage over other more convention bitumen production processes via reduced product carbon residue, sulphur, and other elements 2
Slide 4: Project Status and Progress
Project Status and Progress Safety and Environment 13 million construction hours without a reportable environmental or continued positive performance regulatory non-compliance 0.35-0.45 recordable injury frequency per 200,000 exposure hours Project Progress continues to track positively within 90% e
Slide 5: Construction Productivity
Construction Productivity Fort Hills construction productivity has improved over previous regionally executed projects since the launch of a formal productivity improvement program Improved productivity level has been reflected in the sanction estimate and schedule Improved construction productivity
Slide 6: Site Workforce Profile
Site Workforce Profile Site resourcing continues to meet plan with increasing access to Western Canada based resources due to current market conditions 6000 4000 2000 0 Sep-14 Sep-15 Sep-16 Sep-17 Mar-14 Jul-14 Mar-15 Jul-15 Mar-16 Jul-16 Mar-17 Jul-17 Nov-14 Nov-15 Nov-16 Nov-17 Jan-14 May-14 Jan-1
Slide 7: Pipe and Module Fabrication, Korea
Pipe and Module Fabrication, Korea 6
Slide 8: Structural Steel Fabrication, China
Structural Steel Fabrication, China 7
Slide 9: Piping Fabrication, India
Piping Fabrication, India it HE —
Slide 10: Mining Development, Looking NE
Mining Development, Looking NE 9
Slide 11: Main Plant Site Looking NW
Main Plant Site Looking NW my FORTHILLS Operated by Suncor Energy
Slide 12: Ore Preparation, Looking NE
Ore Preparation, Looking NE 11
Slide 13: Ore Preparation, Crusher Plant
Ore Preparation, Crusher Plant 12
Slide 14: Ore Preparation, Surge Bin
Ore Preparation, Surge Bin 13
Slide 15: Ore Preparation, Rotary Breakers
Ore Preparation, Rotary Breakers 14
Slide 16: Ore Preparation
.. Bid Phi ia ee EAN BMPs hor _ Ore Preparation ale P FORTHILLS
Slide 17: Hydro Transport Corridor
Hydro Transport Corridor al FORTHILLS
Slide 18: Extraction and Tailings, Looking NE
Extraction and Tailings, Looking NE 17
Slide 19: Extraction and Tailings
Extraction and Tailings 18
Slide 20: Extraction and Tailings, Thickener
Extraction and Tailings, Thickener 19
Slide 21: Secondary Extraction, Looking West
Secondary Extraction, Looking West 20
Slide 22: Secondary Extraction
Secondary Extraction ay FORTHILLS WEN a 21 Operated by Suncor Energy
Slide 23: Secondary Extraction
Secondary Extraction a FORTHILLS Operated by Suncor Energy
Slide 24: Secondary Extraction
Secondary Extraction my FORTHILLS 23 Operated by Suncor Energy
Slide 25: Utilities, Looking NW
Utilities, Looking NW al FORTHILLS Operated by Suncor Energy
Slide 26: Utilities, Process Water Tanks
Utilities, Process Water Tanks 25
Slide 27: Utilities, Cogen-GTG Building
Utilities, Cogen-GTG Building 26
Slide 28: Utilities Recycle Water Pond, Looking SE
Utilities Recycle Water Pond, Looking SE 27
Slide 29: River Water Intake, Looking NE
River Water Intake, Looking NE 28
Slide 30: Raw Water Pond, Looking NE
Raw Water Pond, Looking NE al FORTHILLS
Slide 31: Operations Lodge
Operations Lodge al FORTHILLS Operated by Suncor Energy
Slide 32: Maintenance Shops
Maintenance Shops al FORTHILLS Operated by Suncor Energy
Slide 33: Main Substation
Main Substation ay FORTHILLS Operated by Suncor Energy
Slide 34: Tank Farm
Tank Farm 33
Slide 35: Gate 9, Looking East
Gate 9, Looking East al FORTHILLS Operated by Suncor Energy
Slide 36: Fort Hills
Ve FORTHILLS