  1. Slide 1: Committed to building long-term stakeholder value at Ilovica-Shtuka

    www.euromaxresources.com Committed to building long-term stakeholder value at the Ilovica-Shtuka Project in North Macedonia through development and responsible mining Euromax Resources Ltd. | TSX: EOX

  2. Slide 2: Disclaimer

    Euromax Resources Ltd. | TSX: EOX | www.euromaxresources.com Disclaimer This presentation contains statements that are forward-looking, such as those relating to results of operations and financial condition, capital spending, financing sources, commodity prices, mineral resources and property evalu

  3. Slide 3: The Ilovica-Shtuka Project

    Euromax Resources Ltd. | TSX: EOX | www.euromaxresources.com The Ilovica-Shtuka Project • In the heart of Europe, South-Eastern Macedonia • Porphyry copper-gold deposit • Low strip open pit • Homogenous orebody with metallurgy receptive to basic, traditional, low-cost processing • Bulk tonnage • Sim

  4. Slide 4: Project Timeline

    Euromax Resources Ltd. | TSX: EOX | www.euromaxresources.com Project Timeline 2012 2013 2014 2015 2016 2017 Funding Current Management Group Appointed Investec Plc EBRD RG Advance Payment Convertible Loans Private Placements and Invests $6 million $5 million $5 million $11.3 million $8.9 million $4.

  5. Slide 5: Feasibility Study Results

    Euromax Resources Ltd. | TSX: EOX | www.euromaxresources.com Feasibility Study Results Mineral Reserve Pre-tax NPV(5%/8%) US$ 513m / US$ 347m IRR: 19.8% o 2 Million oz Gold Post-tax NPV(5%/8%) US$ 440m / US$ 285m o 900 Million lbs Copper IRR: 17.8% Initial capex (Inc. Contingency) US$ 474.3 million

  6. Slide 6: Geology

    Euromax Resources Ltd. | TSX: EOX | www.euromaxresources.com Geology • 1.5 km in diameter porphyry system, associated with a poorly exposed dacite-granodiorite plug • Resource drilling completed to nominal 50m spacing • A total of 42,032m have been drilled for 130 drillholes • Consistent mineralisat

  7. Slide 7: Mining

    Euromax Resources Ltd. | TSX: EOX | www.euromaxresources.com Mining • Strip Ratio 1:1 – open pit • Conventional drilling and blasting together with shovel and trucks supported by a fleet of ancillary equipment • Two hydraulic shovels with a fleet of up to 19 rigid dump trucks • Based on 0.17% Cu cut

  8. Slide 8: Processing

    Euromax Resources Ltd. | TSX: EOX | www.euromaxresources.com Processing • 10Mt pa throughput • Flotation to a clean copper concentrate • Primary gyratory in pit crusher with conveyor • Cleaner scavenger tails feeds into CIL circuit for further gold from pit to plant production as doré • SAG mill wit

  9. Slide 9: Tailings Management Facility

    Euromax Resources Ltd. | TSX: EOX | www.euromaxresources.com Tailings Management Facility Starter Wall (625 masl) Tailings Sterile Rockfill – Downstream Construction • Downstream method of construction and wall raising Conservative slopes to safeguard the long term integrity Final Embankment (776 ma

  10. Slide 10: Logistics

    Euromax Resources Ltd. | TSX: EOX | www.euromaxresources.com Logistics • Bulk flotation - produces clean concentrate of 24% Cu & 24g/t Au • 60,000 – 100,000 tpa concentrate production using 30t trucks • Road Transportation (A3 Motorway) directly to the Pirdop smelter at costs of US$26.4 per tonne of

  11. Slide 11: Regional Infrastructure

    Euromax Resources Ltd. | TSX: EOX | www.euromaxresources.com Regional Infrastructure Power Distribution Power infrastructure based on new 110 kV overhead transmission lines from existing substations at Berovo and Sushica Water Supply Water pumping scheme maximises water retention from tailings and e

  12. Slide 12: Capex & Opex

    Euromax Resources Ltd. | TSX: EOX | www.euromaxresources.com Capex & Opex Initial Capex Breakdown (US$m) Operating Costs (US$/t ore) • Strip Ratio 1:1 Mining & Fleet $75.2 Mining (average – inc. labour) $3.54 • US$ 1.8/t of material moved Processing $6.73 Processing Plant $199.6 Labour $0.88 Owner’s

  13. Slide 13: Capex Breakdown: Capital Intensity

    Euromax Resources Ltd. | TSX: EOX | www.euromaxresources.com Capex Breakdown Capital Intensity (US$/tpa Av. CuEq) & C1 (USc/lb) 30,000 240 25,000 190 Capital Intensity (US$/tpa Av. CuEq) 20,000 140 C1 (c/lb) 15,000 90 10,000 40 5,000 -10 0 -60 Halilaga Karchiga Harper Creek Ilovica-Shtuka La Arena A

  14. Slide 14: Post Feasibility Study Activities

    Euromax Resources Ltd. | TSX: EOX | www.euromaxresources.com Post Feasibility Study Activities Optimisation, including new fleet size and detailed production schedule, • Mine plan SRK (UK) detailed equipment specs and pricing available • Geotechnical drilling SRK Additional holes in the open pit to

  15. Slide 15: Optimisation & Execution

    Euromax Resources Ltd. | TSX: EOX | www.euromaxresources.com Optimisation & Execution Contract Mining Accuracy/ Escalation Guaranteed • Received 3 bids through a tender process Maximum Price Accuracy/ Escalation (GMP) Fixed Price • First 7 years of mine life (prestrip & 5 year ops) EPC • US$ 1.79/t

  16. Slide 16: Environmental and Social Aspects

    Euromax Resources Ltd. | TSX: EOX | www.euromaxresources.com Environmental and Social Aspects Macedonian Regulative & International best practice standards governing the mining sector EBRD Performance Standards| Equator Principles III Environmental Baseline Social Baseline • Water monitoring • Socio

  17. Slide 17: Macedonia

    Euromax Resources Ltd. | TSX: EOX | www.euromaxresources.com Macedonia • Former Yugoslav Republic • Independent since 1991 Parliamentary democracy • EU & Nato Candidate Country • Leading Parties: SDSM (Current Prime Minister) VMRO DPMNE (Past 10 yrs) • Population – 2.1 million (41.5% under the age o

  18. Slide 18: Mining in Macedonia

    Euromax Resources Ltd. | TSX: EOX | www.euromaxresources.com Mining in Macedonia Serbia MINSTROY HOLDING TORANICA – Kriva Palanka GENESIS RESOURCES Lead, Zinc and Silver PLAVICA – Kratovo Gold, Copper and Zinc CAML SASA - MK Kamenica Lead, Zinc and Silver MINSTROY HOLDING ZLETOVO – Probishtip Lead,

  19. Slide 19: Wealth of Experience

    Euromax Resources Ltd. | TSX: EOX | www.euromaxresources.com Wealth of Experience Varshan Gokool, President & CEO o e • Extensive project finance experience. • roup Accountant of t e ompany, uly 201 ovem er 201 . ookkeeping • Corporate and banking background, including European Goldfields, practice

  20. Slide 20: Corporate Information

    Euromax Resources Ltd. | TSX: EOX | www.euromaxresources.com Corporate Information Share price against Market Vector Junior Gold Capitalisation Overview Miners Index and Copper price Market cap C$ 18. M Closing price (12 Dec 18) C$ 0.11 140.00 52 Week High C$ 0.50 52 Week Low C$ 0.08 120.00 Shares B

  21. Slide 21: Next Steps & Conclusion

    Euromax Resources Ltd. | TSX: EOX | www.euromaxresources.com Next Steps & Conclusion Development Ilovica-Shtuka, a Company Builder • Technical • Low Strip and good effective grade • Incorporate Ag into Resource • Low operating cost, with good infrastructure to support this • Complete stage 1 of EPC

  22. Slide 22: Early Copper Production

    Euromax Resources Ltd. | TSX: EOX | www.euromaxresources.com Early Copper Production Pre-Feasibility Study Feasibility Study Total Resources Tonnage vs. Initial Capex Production Start Year 2018 2019 2020 2021 2022 2023 0 200 Ilovica-Shtuka Halilaga Initial CAPEX US$ M 400 Rovina Valley 600 La Arena

  23. Slide 23: Low Cost Production

    Euromax Resources Ltd. | TSX: EOX | www.euromaxresources.com Low Cost Production CuEq Avg Annual Production (Mlb) & C1 (USc/lb) 270.0 190.0 250.0 170.0 230.0 150.0 210.0 190.0 CuEq Avg Annual Production (Mlb) 130.0 170.0 110.0 150.0 90.0 130.0 C1 (USc/lb) 110.0 70.0 90.0 50.0 70.0 30.0 50.0 10.0 30.

  24. Slide 24: Revenue Distribution

    Euromax Resources Ltd. | TSX: EOX | www.euromaxresources.com Revenue Distribution Total Revenue Distribution, LOM, US$ Billion Smelting, Refining, Transport $0.25 B • 6% 33% • Processing US$ 1.3 B EBITDA US$1.3 B • Total Revenue US$4.08 B 32% Au Revenue US$1.5 B Cu Revenue US$2.0 B Ag Revenue US$0.0

  25. Slide 25: Cash Flow Profile

    Euromax Resources Ltd. | TSX: EOX | www.euromaxresources.com Cash Flow Profile Cash Flows by Period (Au US$ 1220 /oz, Cu US$ 2.90 /lb) Yr 1-5 Yr 6-10 Yr 11-23 Average Annual $112 million $84 million $24 million Operating Cashflow Post Tax Total Operating Cashflow Post Tax $560 million $420 million $

  26. Slide 26: Varshan Gokool, Patrick Forward, Nikola Gulev

    www.euromaxresources.com Varshan Gokool Patrick Forward Nikola Gulev President & CEO Chief Operating Officer Chief Financial Officer vgokool@euromaxresources.co.uk pforward@euromaxresources.co.uk ngulev@euromaxresources.mk Euromax Resources Ltd. | TSX: EOX | ww.euromaxresources.com

  27. Slide 27: Sensitivities

    Sensitivities

  28. Slide 28: Sensitivities: NPV

    Euromax Resources Ltd. | TSX: EOX | www.euromaxresources.com Sensitivities NPV Sensitivity US$ M NPV Sensitivity US$ M Gold Price (US$/Oz), Cu 2.90/lb Copper price (US$/lb), Au 1,220/oz 1,020 1,120 1,220 1,320 1,420 2.30 2.50 2.70 2.90 3.10 3.30 3.50 11.0% 96 159 222 286 349 11.0% 57 112 167 223 278

  29. Slide 29: Sensitivities: IRR and OPEX

    Euromax Resources Ltd. | TSX: EOX | www.euromaxresources.com Sensitivities IRR (%) – Pre Tax OPEX +/-% (LOM) Gold price (US$/Oz) US$/t Change IRR 1,020 1,070 1,120 1,170 1,220 1,270 1,320 1,370 1,420 8.6 -15% 23.2% Copper price (US$/lb) 2.30 7.3% 9.1% 10.7% 12.2% 13.5% 14.8% 16.1% 17.2% 18.4% 9.1 -1