Stanmore Resources Ltd · ASX:SMR

Stanmore Resources — Stanmore Coal — Investor Presentation (December 2010)

30 slides from Stanmore Resources's investor presentation, Dec 6, 2010

  1. Slide 1: Investor Presentation December 2010

    For personal use only IInvestor t Presentation P t ti December 2010 October 2010

  2. Slide 2: Important notice

    Important notice For personal use only This document has been prepared by Stanmore Coal Limited (“Stanmore Coal”) for the purpose of providing a company and technical overview to interested analysts/investors. None of Stanmore Coal, nor any of its related bodies corporate, their respective directors

  3. Slide 3: Stanmore Coal Highlights

    Stanmore Coal Highlights For personal use only • Pure p playy coal company p y focused on world class coal regions g – Portfolio of coking, thermal and PCI coal targets within seven project areas (all 100% owned) totaling 1,080km2 in the Bowen and Surat Basins in Queensland, Australia – 318Mt of JOR

  4. Slide 4: Stanmore Coal Highlights: Key Metrics and Shareholders

    Stanmore Coal Highlights For personal use only • Key K Metrics M ti Shareholders – ASX Code: SMR – Shares on issue: 124m – Current share price1: A$1 28 A$1.28 St Lucia (Jorss, (Jorss Retail, Private Martin, – Market Capitalisation1: A$159m and Other Wishart) (a) – Cash Position2: >A$25m (no debt) 48

  5. Slide 5: Strong Board and Management Team

    Strong Board and Management Team For personal use only Neville ill Sneddon S dd SStephen h Bizzell i ll Chairman Director Mining engineer with 37 years Extensive experience in experience in coal, formerly CEO of commercialising resources Anglo Coal Australia, Chairman of companies; former executive

  6. Slide 6: Strong Board and Management Team

    Strong Board and Management Team For personal use only Andrew Martin Tim Jones Director Exploration Manager 15+ yyears in investment banking, g, SSenior i geologist l i t with ith 15 years infrastructure & resource financing experience in the Bowen Basin and M&A Vaughan Wishart Duncan Cornish Manage

  7. Slide 7: Exposed to high growth markets

    Exposed to high growth markets For personal use only • Strong outlook for our key markets – Metallurgical coal will see strong demand within Asia increasing its share of seaborne trade from 63% in 2008 to 72% in 2025. Global demand is expect to increase by > 8% from 2008 – 2012.1 – Thermal h l coall

  8. Slide 8: Strong performance – One year return

    Strong performance – One year return For personal use only 700% Capital raising 600% Initial Inferred Resource1 at MR Inferred 500% The Range Resource2 Emerald One year return desktop MLA 400% study for TR Concept study 300% for The Range Upgrade at 200% The Range Drilling Upgrade at recommences The

  9. Slide 9: Significant resource upgrades

    Significant resource upgrades For personal use only • More than 400% increase over original IPO target at The Range Inferred Resources (mt) 250 – 3 phases of drilling completed costing approximately $1.1m 200 150 • 99mt at Mackenzie River Thermal Coking 100 with a further exploration t target t off

  10. Slide 10: Prime locations

    Prime locations For personal use only • Prime Coal Areas – Six projects in the Bowen Basin – One project in the Surat Basin which hosts export quality thermal coal with applications under consideration for a Mining Lease and Environmental Authority – A number of other Bowen Basin EPCs under applicat

  11. Slide 11: Mackenzie River Project - Bowen Basin (100% owned)

    Mackenzie River Project ‐ Bowen Basin (100% owned) For personal use only • Open Pit Coking Coal – 99Mt JORC Inferred Resource – Exploration target1 of an additional 70 to 80Mt – Located on existing railway line to coal ports at Gladstone – 25km of strike (Burngrove Formation) – Adjacent to Aquila Re

  12. Slide 12: Mackenzie River - Coking Coal

    Mackenzie River ‐ Coking Coal For personal use only • Aquarius q Seam – Average coal thickness 2.2m (max Aquarius Washability (Fl 1.50 adb) 3.4m) Coking Properties – Coal depth: 19m – 100m (cut off) CSN ((ave)) 60 6.0 – Dips at 2°to west CSN (max) 8.0 – Good coking properties Energy – Exploring a tw

  13. Slide 13: Mackenzie River Project – Infrastructure

    Mackenzie River Project – Infrastructure For personal use only • Port Access – Participating in Wiggins Island Coal Terminal (WICET) Gladstone ‐ Stage II planned expansion p p ((2015)) – Approximately 310km distance to port • Raill Access – Queensland Rail upgrade of existing Blackwater line to Glad

  14. Slide 14: Mackenzie River – Path to Production

    Mackenzie River – Path to Production For personal use only MACKENZIE RIVER 2010 2011 2012 2013 2014 2015 INDICATIVE DEVELOPMENT PLAN* Y Year 1 Y Year 2 Y Year 3 Y Year 4 Y Year 5 Y Year 6 Item ACTIVITY Sep Dec Mar Jun Sep Dec Mar Jun Sep Dec Mar Jun Sep Dec Mar Jun Sep Dec Mar Jun 1 ML application X

  15. Slide 15: The Range Project – Surat Basin (100% owned)

    The Range Project – Surat Basin (100% owned) For personal use only • Export Quality Thermal Coal – Application submitted for Mining Lease and Environmental Approvals – 219Mt JORC Inferred Resource – Open pit mine planned producing 5Mtpa of high energy thermal from Q1 2015 – Conceptual Mining Study c

  16. Slide 16: The Range Project – Export Thermal Coal

    The Range Project – Export Thermal Coal For personal use only • Key Coal Parameters Product 10% ash 12% ash – Average total coal thickness Quality option option 6.1m ((max 9.0m)) (adb) – Coal depth: 9m – 100m; and Energy continues at depth kcal/kg 6,470 6,280 – Dips at 1° 1 to west Btu/lb 11,650 11,

  17. Slide 17: The Range Project – Mining Study Results

    The Range Project – Mining Study Results For personal use only • Cost Estimates Owner/ Operator Low Capex Contract 12% Product Ash Case Option Mining Option Development Capital Cost A$502m A$299m Operating Costs Free on Rail (FOR) per product tonne A$46 Free on Board (FOB1.) per shipped tonne A$85 •

  18. Slide 18: The Range Project – Mining Plans

    The Range Project – Mining Plans For personal use only – Three options for Coal Handling and Prep Plant (CHPP) location – 27km haul road to Surat Basin rail link – Twin pits mined in parallel – 18 year mine life 18

  19. Slide 19: The Range Project – Proposed Flowsheet

    The Range Project – Proposed Flowsheet For personal use only 19

  20. Slide 20: The Range Project – Infrastructure

    The Range Project – Infrastructure For personal use only • Port Access – Participating in Wiggins Island Coal Terminal (WICET) Gladstone ‐ Stage II planned expansion p p ((2015)) – Approximately 360km distance to port • Raill Access – Queensland Rail upgrade of existing Moura line to Gladstone sched

  21. Slide 21: The Range Project – Path to Production

    The Range Project – Path to Production For personal use only THE RANGE 2010 2011 2012 2013 2014 2015 DEVELOPMENT PLAN* ‐ OVERVIEW Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Item ACTIVITY Sep Dec Mar Jun Sep Dec Mar Jun Sep Dec Mar Jun Sep Dec Mar Jun Sep Dec Mar Jun 1 ML application X 2 Environmental

  22. Slide 22: Funding options

    Funding options For personal use only Project j Funding di Required i d Funding di Options O i The Range $300 ‐ $500m with major • Sale of minority funding required from interest 2013 • Farm out • Cash on hand • Contract mining • Project finance • Equity raising • Pre‐payment of customer contracts M

  23. Slide 23: Emerald Project – Bowen Basin (100% owned)

    Emerald Project – Bowen Basin (100% owned) For personal use only • Targeting Metallurgical and Export Thermal Coal – Rangal Coal Measures projected to sub‐crop through project area from 150m in depth – Exploration Target1.1 of 220 – 290 Mt of low to moderate ash (8 – 12% raw) export quality thermal

  24. Slide 24: New Cambria Project - Bowen Basin (100% owned)

    New Cambria Project ‐ Bowen Basin (100% owned) For personal use only • Targeting low‐volatile low volatile PCI Coal – Targeting low‐volatile, low to medium ash PCI coal along structural trend from Yarabee mine (Felix Resources) – High energy (7,200+ kcal/kg) coal mined historically at adjoining Exce

  25. Slide 25: Belview Project - Bowen Basin (100% owned)

    Belview Project ‐ Bowen Basin (100% owned) For personal use only • Targeting Hard Coking Coal – Potential for significant deposit of underground g p prime cokingg coal – Target seams mined in nearby Cook Colliery and Leichhardt Colliery – Regional seam thickness of: • 6m+ (Gemini Seam = Castor & Pol

  26. Slide 26: Kerlong Project - Bowen Basin (100% owned)

    Kerlong Project ‐ Bowen Basin (100% owned) For personal use only • Targeting Coking/PCI / Coal – Targeting high quality, underground cokingg and PCI coal – Target seams mined nearby including: • Burton (Peabody) • South S th Walker W lk Creek C k (BHP Mitsubishi) • Carborough Downs (Vale) • Coppabel

  27. Slide 27: Key Project Summary (all 100% owned)

    Key Project Summary (all 100% owned) For personal use only P j t Project B i Basin Mi i M Mining Method th d T Target tCCoall Si Size Railil Li R Linkk to Coal Port Mackenzie Bowen Open p Pit Cokingg 99Mt JORC Inferred 9 River Resource2 plus 70 –80Mt Initial Exploration Target1. The Range Surat Open

  28. Slide 28: Key milestones – next months

    Key milestones – next 12 months For personal use only Q1 2011 Q2 2011 Q3 2011 Q4 2011 2015 • Resource • Conceptual • Scout drilling • Pre-feasibility • First coal upgrade mining study Belview study at The production M k Mackenzie i M k Mackenziei • Scout drilling R Range f from both b th Th The Rive

  29. Slide 29: ASX Listed Comparables – Coal Sector

    ASX Listed Comparables – Coal Sector For personal use only Market Capitalisation (A$m) 4,500 4,000 Producers Explorer / Developers The path for value 3 500 3,500 creation as Stanmore Coal moves through 3,000 project development 2,500 t towards d production d ti iis 2,000 well established 1,500 1,000

  30. Slide 30: Summary

    Summary For personal use only • Pure play coal company focused on world class coal regions • Current JORC Inferred Resource of 318Mt of coking and export thermal coal with an additional 290 – 370Mt of exploration target1 upside defined to date • Strongg Board and management g team experienced p in c