Cameco Corporation · TSX:CCO

Cameco — Q4 2024 Earnings Presentation

34 slides from Cameco's earnings presentation, Feb 20, 2025

  1. Slide 1: Investor Presentation

  2. Slide 2: Forward-looking statements and IR contacts

    Please note that statements made in this handout, including statements regarding the outlook, company's objectives, projections, estimates, expectations or predictions, contain forward-looking information and statements within the meaning of applicable Canadian and U.S. securities laws. The company

  3. Slide 3: Values and Strategy

    Company Overview Q4 2024 Values and Strategy Committed to our values Our values are at the core of everything we do, defining who we are as a company and helping embed sustainable practices and principles as we define our strategy. Our values include: * Safety and the environment * People * Integrit

  4. Slide 4: Cameco Corporation

    Cameco Corporation Operating and invested across the nuclear fuel cycle © Cameco Tier One Uranium Operations McArthur River Key Laki 's t, High-Grade —_A Significant Low-Cost i Source of Uranium Licensed Capacity (100%): 18 M ibiyr Licensed Capacity (100%): Licensed Capacity (100%): 25 M Ibiyr 10.4

  5. Slide 5: Durable Demand Growth

    Durable Demand Growth © Global attention on a triple challenge Cameco Energy Poverty Thermal Replacement Electrifying Industry + Lift 1/3 of the global * Replace up to 80% of the * Global power grids must population out of energy current global grid running grow by electrifying key poverty by improv

  6. Slide 6: Global Focus on Secure Energy

    Global Focus on Secure Energy Nuclear is essential to achieve climate, energy and national security Benefits of nuclear include 4 Baseload electricity generation ci Nuclear for process heat (y) Critical mineral for the energy transition & Shifting to low- carbon economy with net-zero ‘Small modular

  7. Slide 7: Strong Nuclear Power Outlook

    Strong Nuclear Power Outlook © Cameco Price Increases Across the Fuel Cycle* Constructive term contracting, improving market prices fim) Uren Spat ae Uranium Term Growth from New Reactors Demand Increasing te | Uranium (Uss/. 000) 135%" Reversal of early 0: TT 2: . os Near-Term = a retirement / clos

  8. Slide 8: Geopolitical Uncertainty

    Geopolitical Uncertainty © Security of supply driving shift in growth plans Cameco Russia® ror 2024 Uranium RUSSIA Niger Production = 1% (estimate) j 20 M Ibs* Rest of World 1 53 12Mkgu 86% | wei \ 22.6 MSWU (estimate) Russia 2024 Conversion a Production Rest of World (estimate) 11% 53 M kgu 2024 En

  9. Slide 9: Uranium Market Fundamentals

    Uranium Market Fundamentals 1G Driving contracting interest, moving toward replacement rate Cameco msde Uncovered Uranium Requirements 2.1 billion Ib. through 2040 (~57% uncovered) Million 1b. UsOs 400 Supply Outlook is Uncertain Structural Primary & Secondary Supply Gap Million Ib. UsOx 400.0 Deman

  10. Slide 10: Operationally Flexible Supply

    Operationally Flexible Supply © Cameco Align production with market opportunities and contracts Spot is NOT the market Long-term value focus * Spotis thinly-traded, one-time and * Multi-year requirements layered in discretionary during periods of above + Productive capacity missing the replacement-r

  11. Slide 11: Future Uranium Supply

    Future Uranium Supply Production response challenges — proven Volume Risks * regulatory: licensing + stakeholder. sustainability * inflation & supply-chain Demonstrated project execution operational Timing Risks + demand cycle * geopolitical/realignment * macroeconomic Assets Declared ©@ producer ad

  12. Slide 12: Contracting Drives Supply

    Contracting Drives Supply © Tier-one supply to match commitments, new phase of supply discipline Cameco ves (M iced cai ences = McArthur River/Key 12.6 175 Lake 18 @ 100% 25 @ 100% 32 mibs (our share of tier-one Gagaake 9.8 9.8 licensed > ba 18 @ 100% 18 @ 100% capacity) F 5.0 Inkai (Vv inkai purcha

  13. Slide 13: Financial Strength

    Financial Strength Risk managed financial discipline Liquidity’ $GQQ mition Cash $4 Billion Undrawn credit facility Total debt" ~$4 ro Billion Credit ratings S&P: BBB- DBRS: BBB * As at December 34, 2024 ©@ Cameco Maintain strong balance sheet ¢ With improving prices, a return to a tier-one cost str

  14. Slide 14: Commitment to Sustainability

    Commitment to Sustainability Sustainability integrated into all aspects of our business @ Cameco 100% of our product goes to producing carbon-free, base-load nuclear energy Learn more > www.cameco.com/sustainabilitiy Fourth Quarter 2024 23 Our locations Global presence across the fuel cycle eecoeeeo

  15. Slide 15: Focus on Value

    Focus on Value © Well positioned for future demand with world-class, tier-one assets Cameco Cameco’s Share 457 mvs. Proven & Probablé Reserves | 408 M Ibs Measured & Indicated Resources v Extensive reserves and resources v Diversified supply v Decisions driven by contracting success 1 53m Ibs Inferr

  16. Slide 16: Cigar Lake

    . (CQ) Cigar Lake x World-class, high-grade uranium mine Cameco Proven and Probable Reserves! Average grade U,0, 105.2 M Ib 15.87% Cameco’s Share Production 2024 production: 16.9 M Ib (100% basis) 2025 outlook: S 18 M I (100% basis) 54.5% sits I COS : (@ JV Inkai iG A significant source of low-cost

  17. Slide 17: Fuel Services Division

    Fuel Services Division © Cameco Refining, conversion and fuel manufacturing Blind River Refinery Port Hope Conversion Facility Cameco Fuel Manufacturing Inc. Cameco’s Share Production v7, 2024 production: 13.5 M KgU 2025 outlook: 13 - 14 M KgU Westinghouse” © Full suite portfolio of nuclear technolo

  18. Slide 18: Westinghouse Acquisition

    Brookfield EPwestinghouse ch ow” 6S FC @B Westinghouse Acquisition © Strategic rationale Cameco tg oro “r ies Strategic Growth F pplies Key Metrics Nuclear Fuel Cycle Financial Strength Strategic Partnership: Complements Expected to be Expected to enhance Provides Platform 49% Cameco Cameco’s Partic

  19. Slide 19: Exploration

    Exploration © Focused on the most prospective trends in the Athabasca Basin Cameco Significant land position + 754,000 hectares of Cameco and JV-operated properties History of exploration success ATHABASCA BASIN ] + Uranium prospects and undeveloped deposits on dozens of projects 2 ee ‘camecojJoiet

  20. Slide 20: Additional Mine Information and Reference Figures

    Additional Mine Information and Reference Figures 20

  21. Slide 21: Uranium Mining Methods

    oooures) *) ssieu6 .eyues6, ueayqy } wintuua|q\ uogezyeseurw wniues japoyy isodeq wniuesq eoseqeuy 21

  22. Slide 22: McArthur River - Raise Bore Mining System

    McArthur River - Raise Bore Mining System -——_¥reezing _— Pilot hole 5 Reaming head Staggered raises iG \ ! y Bie cement 22

  23. Slide 23: McArthur River - Ground Freezing

    McArthur River - Ground Freezing Surface freeze plant Pump Warm brine from [—* Freezewall A’ - C Warm brine from Freezewall B Heat exchanger A McArthur River To ore loadout on surface — Ore slurry Ore slurry hoisting pump oS hoisting pump Grinding mill A; rr _] Thickener Grinding mill ) ke .. ot Thi

  24. Slide 24: Cigar Lake - Jet Bore Mining System

    Cigar Lake - Jet Bore Mining System (JBS) + Orebody frozen prior to mining Water jet + Ore removed using high-pressure water jet + Cavity monitored using survey equipment + Cavity backfilled with concrete + Ore slurry contained to control radiation, eliminate dust Blade screen Slurry mining cavity _

  25. Slide 25: Ore Processing

    nd Ore Processing To ore loadout on surface Ore slurry hoisting pump Ore slurry hoisting pump Xx Ball mill G r~—ti‘;é‘~*@*d Clarifier Invert Internal Support Advantages mparison + Adaptive ground support, varies with rock strength + Overall time to develop a cross cut similar to tunnel boring + Smal

  26. Slide 26: Freeze hole specifications and timeline

    et Chilled brine ———» Freeze plant [Warm brine <——— Freeze hole specifications +462 m long, overburden to ~40 m +~8- 10 days / drill hole + required accuracy of ~1.5 m + 100 - 120 holes / production panel Timeline + ~1.5 - 2 years to drill, outfit and activate a production panel | + freezing takes 2

  27. Slide 27: In-Situ Recovery

    OosUe|D > B eater dayinbe 49M07 = }]2M UoHINpold © [| []2M_uoNdafu| & sake} Suiulyuod 4aM0} = P auo}spues iqissougns =2h ‘om —Ss Ae SS pis ue suaaing BS = ge . : 3 dake} cE c suruijuod ah 3 jaddp g 2. 8 2 a A z & & t 3 ® sjanes3 pue g 5 she]> ‘spues Z 3 ajqeauad ie g g 5 SS8D01g AJBAODOY N'US-U| 27

  28. Slide 28: Mineral reserves

    Mineral reserves As of December 31, 2024 (100% – only the shaded column shows our share) PROVEN AND PROBABLE (tonnes in thousands; pounds in millions) OUR SHARE PROVEN PROBABLE TOTAL MINERAL RESERVES RESERVES MINING GRADE CONTENT GRADE CONTENT GRADE CONTENT CONTENT METALLURGICAL PROPERTY METHOD TONN

  29. Slide 29: Mineral resources

    Mineral resources As of December 31, 2024 (100% – only the shaded columns show our share) MEASURED, INDICATED AND INFERRED (tonnes in thousands; pounds in millions) OUR OUR MEASURED RESOURCES (M) INDICATED RESOURCES (I) SHARE INFERRED RESOURCES SHARE TOTAL M+I TOTAL M+I INFERRED GRADE CONTENT GRADE

  30. Slide 30: Caution About Forward-Looking Information

    Caution About Forward-Looking Information Statements contained in this presentation include statements and information about our expectations for the future. When we discuss our strategy, plans and future financial and operating performance, or other things that have not yet taken place, we are maki

  31. Slide 31: Forward-looking information assumptions and risks

    public perception of the safety of nuclear energy; our ability to continue to supply our products and services in the expected quantities and at the expected times; production levels; costs, including production and purchase costs; the success of our plans and strategies; market conditions and other

  32. Slide 32: Qualified persons

    Qualified persons The technical and scientific information discussed in this presentation for our material properties (McArthur River/Key Lake, Cigar Lake and Inkai) was approved by the following individuals who are qualified persons for the purposes of NI 43-101: MCARTHUR RIVER/KEY LAKE • Greg Murd

  33. Slide 33: Nuclear Fuel Cycle

    Nuclear Fuel Cycle @ OPERATED CAMECO ASSETS @ NON-OPERATED CAMECO ASSETS @ NON-CAMECO AcTiviTIES ° > o . ° > + Light water reactors ENRICHMENT CONVERSION FUEL LIGHT WATER SPENT FUEL oF uF, OF ENRICHED FABRICATION REACTORS STORAGE 5 INTO UO, | iro, esr, hoe eeiceens (ec) ‘s Laser 49% interest in West

  34. Slide 34: Cameco

    rc Cameco

Cameco — Q4 2024 Earnings Presentation on 6ix