Ramelius Resources Limited · ASX:RMS

Ramelius Resources — Investor Presentation (October 2011)

23 slides from Ramelius Resources's investor presentation, Oct 19, 2011

  1. Slide 1: Ramelius Resources Limited Investor Presentation October 2011

    For personal use only Ramelius Resources Limited Investor Presentation October 2011 ASX:RMS

  2. Slide 2: Disclaimer and Forward Looking Statements

    For personal use only DISCLAIMER AND FORWARD LOOKING STATEMENTS This presentation contains certain forward looking statements with respect to Ramelius’ financial condition, results of operations and other matters that are subject to various risks and uncertainties. Actual results, performance or ach

  3. Slide 3: Ramelius Corporate Information

    Ramelius Corporate Information For personal use only Corporate Details Directors & Shareholders ASX Code: RMS Chairman: Robert Kennedy Ordinary Shares on Issue: 291M Managing Director: Ian Gordon Market Capitalisation: A$375M Non Executive Director: Reg Nelson 12 month share price range: $0.66-1.73

  4. Slide 4: Company Overview

    Company Overview For personal use only Wattle Dam (WA) ƒ High Hi h Grade G d Gold G ld P Production d ti [Gold - Production] ƒ Ave total costs less than A$500 oz ƒ Mine Life extended through to 2013 ƒ Open p at depth p – new drillingg commenced Mt Magnet (WA) ƒ Mining / final plant re- commissioning

  5. Slide 5: Project Locations

    Project Locations For personal use only Ramelius Resources Limited: Investor Presentation October 2011 Page 5

  6. Slide 6: Achievements in 2011

    Achievements in 2011 For personal use only ƒ Record production of 100,000 oz of gold (FY ending 30 June 11) ƒ Record operating cash flow of A$99m (FY ending 30 June 11) ƒ Increased Wattle Dam mine life to 2013 ƒ Commenced mining at Mt Magnet in September 2011 ƒ Record R d nett profit fit off A$62 A$

  7. Slide 7: Targeting 200,000oz per annum

    Targeting 200,000oz per annum For personal use only ƒ Gold Production target of 200,000 oz by 2013-14* Production Targets Oz p.a. 200,000 180,000 160,000 140 000 140,000 120,000 100,000 80,000 60 000 60,000 40,000 20,000 ‐ 2011 12 2011‐12 2012 13 2012‐13 2013 14 2013‐14 *Includes potential Mt Magnet

  8. Slide 8: Projects – Wattle Dam

    Projects – Wattle Dam For personal use only ƒ Highest grade gold mine in Australia ƒ Underground mine located 25km SW of Kambalda ƒ Structurally controlled gold deposit p within ultramafic belt ƒ Extremely high nugget effect historically results in significant grade overcall ƒ Production has average

  9. Slide 9: Wattle Dam - Mining

    Wattle Dam - Mining For personal use only Pit ƒ Production of 100,000 ounces in FY 2010-11 2010 11 Blocks A & B Completed with ƒ Total 1300 ounces/vertical metre ~180,000 oz production over (incl open pit) 100m vertically ƒ Future mining will be from the base of Block D up to base of Blocks C & D De

  10. Slide 10: Wattle Dam - Production

    Wattle Dam - Production For personal use only ƒ Wattle Dam has produced over 225,000 oz of gold since 2006 ƒ P Production d ti off 100,000 100 000 oz in i 2010-11 ƒ Mill maintenance and access issues to block D reduced recent quarterly production ƒ Treatment of stoping ore from Block D in January 12

  11. Slide 11: Wattle Dam - Diamond Drilling Results

    Wattle Dam - Diamond Drilling Results For personal use only ƒ Recent infill drilling in Block C (both outer sides of cut core shown) Ramelius Resources Limited: Investor Presentation October 2011 Page 11

  12. Slide 12: Wattle Dam - Diamond Drilling Results

    Wattle Dam - Diamond Drilling Results For personal use only ƒ Drilling is designed to test the limits of alteration zone and define High Grade mine design. Seeing visible gold Mineralisation A adds to confidence ƒ Block A and B had one +500 gram B metre hole and ten +100 gram metre holes (Grade = 21

  13. Slide 13: Projects – Mt Magnet

    Projects – Mt Magnet For personal use only ƒ Mt Magnet is a significant past gold producer - in excess of 5m ounces ƒ Multiple deposits with majority of gold mined in banded iron ƒ Existing infrastructure includes 1.7mtpa plant (replacement value A$100m) ƒ Mining commenced in September and first gol

  14. Slide 14: Mt Magnet – Project Potential

    Mt Magnet – Project Potential For personal use only ƒ Highlights ƒ Strategic St t i Positioning P iti i - Will be b only l regional i l mill ill for f 200km 200k (strategic ( t t i asset)t) ƒ Mineable Deposits - Ore deposits are robust and geology well understood ƒ Scale - Large gold system, with si

  15. Slide 15: Mt Magnet – Progress October 2011

    Mt Magnet – Progress October 2011 For personal use only ƒ 25,000m of infill drilling, resource estimate and new mining study completed ƒ New 160 man camp completed and now fully operational ƒ Site management and mining team recruited and mining approval secured ƒ Mining commenced and first gold pour

  16. Slide 16: Mt Magnet – Processing Plant

    Mt Magnet – Processing Plant For personal use only ƒ Existing 1.7mtpa processing plant located next to main operating open pits ƒ Currently being refurbished by GR Engineering (completion Nov 11) ƒ Can be expanded to 2.4mtpa by expenditure of a further ~A$5-10m ƒ Expansion p could increase ggold ppr

  17. Slide 17: Mt Magnet – Mining Commenced

    Mt Magnet – Mining Commenced For personal use only ƒ First ~2.35 years production Hill 50 from Mars & Saturn open pits has commenced Mars ƒ Mars ore is pprimarilyy banded iron and Saturn ore is banded iron and breccia zone ƒ Mars pit ore is 1.33mt @ 2.01 g/t Au* ƒ Saturn pit ore is 2.65mt @ 1.53 g/t

  18. Slide 18: Mt Magnet – Expansion Plans

    Mt Magnet – Expansion Plans For personal use only ƒ Ramelius has completed an optimisation of the Galaxy area at a gold price of A$1500 (does (d nott include i l d satellite t llit pits) it ) ƒ Gold in optimised pit shells contain 14.9mt @ 2.07 g/t for 916,000 oz ƒ Total operating cost of ~A$1000 pe

  19. Slide 19: Mt Magnet – Project Upside

    Mt Magnet – Project Upside For personal use only ƒ Numerous underground targets (not included in current mine plan) Ramelius Resources Limited: Investor Presentation October 2011 Page 19

  20. Slide 20: Exploration North QLD (earning 60%)

    Exploration North QLD (earning 60%) For personal use only ƒ Mt Windsor JV – World Class Gold District: 2011 field season drill targets Ramelius Resources Limited: Investor Presentation October 2011 Page 20

  21. Slide 21: Exploration North QLD (earning 60%)

    Exploration North QLD (earning 60%) For personal use only ƒ Joint Venture with Liontown Resources Limited ƒ Exploring for Kidston style breccia hosted gold deposits ƒ Drilling planned for Mt Redan and Cardigan Dam Oct/Nov 2011 Mt Redan Target Cardigan Dam Target Ramelius Resources Limited: Investor

  22. Slide 22: Exploration Nevada USA (earning 70%)

    Exploration Nevada USA (earning 70%)* For personal use only ƒ Nevada is a world class gold district ƒ Two JV’s with Miranda Gold Corp ƒ Angel Wing targeting bonanza gold grade epithermal veins: DaVinci veins – 2km strike potential ƒ Bigg Blue targeting g g Carlin style y sediment hosted disseminated

  23. Slide 23: Why Invest in Ramelius

    Why Invest in Ramelius For personal use only ƒ Operations ¾ Wattle Dam –high grade, low cost and open at depth ¾ Mt Magnet – low risk and potential for significant expansion ƒ Capital Position ¾ Strong cash balance with no corporate debt ¾ Able to fund current Mt Magnet project from existing cash ¾

Ramelius Resources — Investor Presentation (October 2011) on 6ix