    For personal use only OBM AGM Presentation Luke Creagh Managing Director 23 November 2022

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements For personal use only IMPORTANT NOTICE AND DISCLAIMER This Presentation contains summary information about the Company and its activities which is current as at the date of this Presentation. The information in this Presentation is of a general nature and does not purport

  3. Slide 3: Competent Persons Statements

    Competent Persons Statements For personal use only COMPETENT PERSONS STATEMENT The information in this report that relates to Exploration Results is based on information compiled under the supervision of Mr Andrew Czerw, an employee of Ora Banda Mining Limited, who is Member of the Australian Instit

  4. Slide 4: Corporate Overview

    Corporate Overview For personal use only Capital Structure Board of Directors Share Price1 A$/share 0.083 Peter Mansell Non-executive Chairman (Corporate Lawyer) Shares on issue2 M 1,374 Luke Creagh3 Managing Director (Mining Engineer) 2 Options & performance rights on issue M 54.2 Alan Rule4 Non-ex

  5. Slide 5: Project Overview

    Project Overview For personal use only OBM Davyhurst tenements are located ~100km north-west of Kalgoorlie and are centred on the following key project hubs: • Siberia & Davyhurst • Riverina & Mulline • Callion & Lady Ida In total these projects hubs include: • ~1,200 square kilometre land holding o

  6. Slide 6: Value Creation – OBM's Three Year Strategy

    Value Creation – OBM’s Three Year Strategy For personal use only Short Term Medium Term Longer Term Focus on the fundamentals Leverage organic opportunities Performance drives growth • Improve mining operating capability to deliver • Continuous improvement in operations to • Bring higher-margin mine

  7. Slide 7: Values – How We Operate

    Values – How We Operate For personal use only New Values We target Zero Harm • Safety imbedded in all that we do • Risks assessed and actively managed • Sustainable environmental performance We are a Team with a Winning Mindset • Plan to win - targets are known and achieved • Every Person important

  8. Slide 8: FY23 Guidance & Actions to Improve

    FY23 Guidance & Actions to Improve Focus on the fundamentals For personal use only FY23 Guidance Overview Opportunities currently underway to improve on FY23 guidance • Production of 56-61koz Mining • AISC of A$2,175/oz - A$2,275/oz • Increase digger productivity rates  increases production profile

  9. Slide 9: Geology First – Our New Approach

    Geology First – Our New Approach For personal use only Geology First Lessons from the past • Tenement package was consolidated between 2006 to 2008; OBM considers the true value of this consolidation is yet to be realised • Since the 1980s the focus has been on open pit production, with limited focu

  10. Slide 10: Riverina – First Exploration Priority

    Riverina – First Exploration Priority For personal use only • A key pillar of OBM’s 3-Year Strategy to create value is committing to exploration drilling, targeting high-grade underground ore for the potential to increase production above 100kozpa • OBM’s boots-on-the-ground and first principles app

  11. Slide 11: Riverina Underground – Main Lode East

    Riverina Underground – Main Lode East For personal use only • Main Lodes are made up of two parallel structures (East and West) that are sub-vertical and ~10m apart; the Main Lode East is the prominent structure • Extensional drilling under the Riverina open pit has extended the Main Lode an additio

  12. Slide 12: Riverina Underground – Murchison Lode

    Riverina Underground – Murchison Lode For personal use only • Narrow vein & high-grade extension of the Murchison Lode has been identified in deeper drilling that runs parallel to the existing Main Lode • Murchison Lode is located ~80m east of Main Lode and is presenting as an attractive, high-grade

  13. Slide 13: Riverina – Ideal geometry for low capital and selective mining

    Riverina – Ideal geometry for low capital and selective mining For personal use only Benefits of central decline and parallel lodes Decline • Identifying high-grade extensions of the Murchison Lodes could Main Lodes have substantial benefit to the economics of the Riverina Underground • Single decli

  14. Slide 14: Riverina – Exciting times ahead

    Riverina – Exciting times ahead For personal use only Just starting to unlock the deposit • Whilst it is still early days, this mineralised system is considered bigger than first thought and in parts it will host very high grade gold • Continuing width and tenor of the Main Lode at depth and the dis

  15. Slide 15: Exploration Opportunities

    Exploration Opportunities For personal use only Exploration potential is outstanding • The tenement package is highly prospective; the central Davyhurst area covers the convergence of two regional significant deep-seated structures, the Zuleika Shear and Mt Ida Fault • Very little exploration spend

  16. Slide 16: Infrastructure Well Established

    Infrastructure Well Established For personal use only Infrastructure replacement cost of ~$180M1 1.2Mtpa Davyhurst Processing Plant • 1.2Mtpa processing plant (~$120M replacement) • 3 stage crushing circuit • Twin 1.3MW ball mills • Gravity + CIL circuit • Thickener & tailings facility • Onsite assa

  17. Slide 17: Performance Will Deliver Substantial Value

    Performance Will Deliver Substantial Value For personal use only OBM’s underlying value has been overshadowed by operational underperformance; actions in place to rectify FY23 Guidance • Production of 56-61koz; improving in H2 as Missouri drops from 13:1 strip ratio to 6:1 strip ratio • AISC of $2,1

  18. Slide 18: Thank you

    For personal use only Thank you

  19. Slide 19: Appendix – Mineral Resource and Ore Reserves Tables

    Appendix 1 Mineral Resource Table Ore Reserves Table MEASURED INDICATED INFERRED TOTAL MATERIAL PROVED PROBABLE TOTAL MATERIAL PROJECT Cut Off PROJECT AREA DEPOSIT ('000t) (g/t Au) ('000t) (g/t Au) ('000t) (g/t Au) ('000t) (g/t Au) ('000oz.) ('000t) (g/t Au) ('000t) (g/t Au) ('000t) (g/t Au) ('000oz