Origin Energy Limited · ASX:ORG

Origin Energy — Technical Presentation (May 2014)

68 slides from Origin Energy's technical presentation, May 29, 2014

  1. Slide 1: Investor Site Tour Presentation

    For personal use only To Company Announcements Office Facsimile 1300 135 638 Company ASX Limited Date 29 May 2014 From Helen Hardy Pages 68 Subject Investor Site Tour Presentation Please find attached a release on the above subject. Regards Helen Hardy Company Secretary 02 8345 5000 – helen.hardy@or

  2. Slide 2: Origin-APLNG Operational Review and Asset Visit

    For personal use only Origin-APLNG Operational Review and Asset Visit David Baldwin, Chief Executive Officer LNG 29 & 30 May 2014

  3. Slide 3: Important Notice

    Important Notice For personal use only Forward looking statements This presentation contains forward looking statements, including statements of current intention, statements of opinion and predictions as to possible future events. Such statements are not statements of fact and there can be no certa

  4. Slide 4: Safety is our first priority

    Safety is our first priority For personal use only LNG TRIFR LNG TRIFR 8 2,500 7.3 7 2,000 6 Recordable Injuries / TRIFR Man Hours (x1,000) 5 1,500 4.7 4 1,000 3 2 500 1 0 Total Man Hours LNG TRIFR (Rolling 12 Months) 3|

  5. Slide 5: Operational Review and Asset Visit

    Operational Review and Asset Visit CONDABRI - Day 1 For personal use only Site Tour: - Flyover of gas operations - Bus tour Condabri Central construction area - Wellhead - Water treatment - Gas facilities - Flyover of Curtis Island, Gladstone Presentations: Condabri Central - water and brine ponds,

  6. Slide 6: Australia Pacific LNG has world leading operators

    Australia Pacific LNG has world leading operators For personal use only UPSTREAM – 71% complete DOWNSTREAM – 70% complete • Operated by Origin • Operated by ConocoPhillips • Over 16 years’ CSG production experience in • Over 40 years’ LNG production experience Australia • Using ConocoPhillips’ Optim

  7. Slide 7: Upstream Project Delivery

    For personal use only Upstream Project Delivery

  8. Slide 8: APLNG is progressing in line with budget and on track for first LNG in mid-2015

    APLNG is progressing in line with budget and is on track for first LNG in mid-2015 … For personal use only 2,000 Demand demand 1,800 Production 1,600 • Demand includes domestic 1,400 contracts, committed ramp Gas Production Rate, TJ/d gas sales and LNG contracts 1,200 • Opportunity exists to use 1,0

  9. Slide 9: Upstream Project Goals

    Upstream Project Goals 1 • Health and Safety For personal use only • Zero Harm 2 • Environment and Land • Honour our Commitments 3 • Safe & Operable Production System • Automation from central control room 4 • Project within schedule and budget • On track to support LNG trains 5 • Team effectiveness

  10. Slide 10: Upstream Project progress - 71% complete and on track

    Upstream Project progress - 71% complete and on track at 30 April 2014 For personal use only Upstream Operated Goals FY2014 Plan Actual Progress to 30 April 2014 First gas and water production from Reedy Q3 Accomplished May 2014 Creek (western area) Main pipelines complete Q3 Accomplished Condabri C

  11. Slide 11: Upstream development land, environmental and stakeholder management is progressing

    Upstream development land, environmental and stakeholder management is progressing For personal use only 1200 1000 18 330 397 800 Lease acquisition 600 969 400 766 700 Drilling and completion 200 Gas and water gathering 0 Approvals Gathering Drilling (well equivalent) Fully approved Compensation Arr

  12. Slide 12: Upstream development implementation – Phase operated well progress

    Upstream development implementation – Phase 1 operated well progress – April 2014 For personal use only • Western Fields • Eastern Fields Spring Gully Combabula / Reedy Creek Condabri Talinga / Orana 11 |

  13. Slide 13: Upstream development implementation - Drilling and Completion

    Upstream development implementation - Drilling and Completion For personal use only Progress Update (30 April 2014): • 700 Phase 1 operated wells drilled • 587 Phase 1 wells completed • 11 drilling rigs • 7 completion rigs • 3 flush-by rigs Drilling Completions 12 |

  14. Slide 14: Well head technology

    Well head technology For personal use only Key features that enable a wellhead separator to operate under a wide range of operating conditions include the following: 1. Automated Control System – includes instrumentation, communication/Telemetry to a 3D Model of APLNG Phase 1 Wellhead Separator cent

  15. Slide 15: Upstream development implementation - Gathering

    Upstream development implementation - Gathering For personal use only Progress Update (30 April 2014) • 791 drilling lease preps • 452 diameter-kilometres of flow lines installed (766 equivalent wells) • Installation of cable, gas and water High Density Polyethylene (HDPE) pipe to wells through tren

  16. Slide 16: Upstream development implementation – Gas and Water Facilities

    Upstream development implementation – Gas and Water Facilities For personal use only • All 15 compressor trains and modules in Queensland • Construction under way on all gas processing and water treatment facilities • First production wells in Condabri Central commissioned in August 2013, with gas f

  17. Slide 17: Upstream development implementation - Pipeline

    Upstream development implementation - Pipeline • Pipeline design features: 360 km 42-inch main trunk line For personal use only and 160 km lateral pipelines to gas fields with 50 year design life • The main pipeline construction is complete including hydrotest • First gas (for commissioning) to Curt

  18. Slide 18: Upstream development implementation - Electrification

    Upstream development implementation - Electrification • Power available in the East • Western region progressing supported by temporary power stations For personal use only 275kV/132 kV Network Power Stations: “Wandoan South to Eurombah Transmission Project” EC 1 (27 MW) – equipment deliveries Forec

  19. Slide 19: Upstream development implementation - Water

    Upstream development implementation - Water • Eastern water management systems are For personal use only in place and operating, – Produced water connections between Condabri, Talinga, Orana and QGC Kenya facility completed – Treated water connection between Talinga and Condabri completed with Monre

  20. Slide 20: Commissioning and Operational Readiness

    For personal use only Commissioning and Operational Readiness

  21. Slide 21: Well Commissioning Overview

    Well Commissioning Overview For personal use only 1. Well Commissioning Team resourced to meet 2 well/day capability • East/West development split now established with resources in place across both fields. Technical Lead and Delivery Manager roles now appointed and operational. 2. Well Delivery sta

  22. Slide 22: Gas Facilities Commissioning Overview

    Gas Facilities Commissioning Overview For personal use only Eastern Region 1. Condabri a) Full commissioning team in place for Train 1 Condabri Central b) 100% of process systems achieved mechanical completion; instrumentation loop testing >97% complete c) Utilities fully commissioned 2. Orana a) Pa

  23. Slide 23: Pipelines Commissioning Overview

    Pipelines Commissioning Overview For personal use only 1. Pipelines a) Wet commissioning completed on Condabri Talinga water pipeline b) Orana Talinga water pipeline pre-commissioned c) Condabri Talinga high pressure gas pipeline hydrocarbon packed d) Condabri Lateral North pipeline pre-commissioned

  24. Slide 24: Operations Readiness Key Focus Areas

    Operations Readiness Key Focus Areas For personal use only Current Focus Areas • Safe Start Up of Condabri Central with Pre-Start Up Safety Review scheduled end of May • Brisbane Control Room ready to commission increasing number of wells and facilities • Safety Management Plan implementation across

  25. Slide 25: Field Performance / Key Exploration & Appraisal Areas of Focus

    For personal use only Field Performance / Key Exploration & Appraisal Areas of Focus

  26. Slide 26: Origin has over 16 years of CSG production experience

    Origin has over 16 years of CSG production experience For personal use only APLNG tenure in the Surat and Bowen basins at 30 April 2014 APLNG has prime acreage in both “sweet spots” in Queensland, with 2P reserves more than sufficient to cover gas requirements for all domestic contracts, as well as

  27. Slide 27: APLNG has significant remaining development in high confidence areas

    Looking ahead, APLNG has significant remaining development in high confidence areas with proven success … For personal use only Gilbert Gully … followed by development expanding into greenfield areas ( ) 26 |

  28. Slide 28: Maximum well deliverability considerably higher than current production levels

    Maximum well deliverability considerably higher than current production levels indicate … For personal use only • The operated wells to be drilled for Phase 1 are expected to produce around 1,200 TJ/d1, with an additional 200 TJ/d1 from non-operated assets • The observed maximum average well deliver

  29. Slide 29: Typical Phase Well Forecast

    Typical Phase 1 Well Forecast Dewatering For personal use only Stable Production Stage Stage Decline Stage • Typical phase 1 well forecast to have: Production Rate – peak gas rate 1-2 TJ/d Gas – peak water rate 500-1000 bbl/d – approx 50-70% of well’s Water reserves produced within first 5 years Tim

  30. Slide 30: Spring Gully Production Performance

    Spring Gully Production Performance ... gas performance of new Phase 1 wells tracking well For personal use only Spring Spring Gully Gully Phase Phase 1 – 1Average Gas RateWell Comparison Performance 1400 • Chart shows average performance Actual Gas Average (GJ/d) per well for the online duration of

  31. Slide 31: Condabri Production Performance

    Condabri Production Performance ... gas performance ramping up towards targeted rates For personal use only Condabri –Condabri AverageGas Rate Well Performance • Chart shows average performance 900 per well for the online duration of Actual Gas Average (GJ/d) each well 800 • Actual production has be

  32. Slide 32: Condabri Outlook

    Condabri Outlook ... water performance lower than Talinga (as expected) but still very productive, expect gas performance to grow with time For personal use only Condabri field ~6 months production Talinga field~5 years production Condabri Gas and Water Production Talinga Gas and Water Production 50

  33. Slide 33: Combabula/Reedy Creek

    Combabula/Reedy Creek ...early water rates are in line with expectations For personal use only Chart shows water Flow Test Results production rate More Productive observed during Water Rate (bbl/d) tested by completion rig completion operation This provides an indication of ultimate well performance

  34. Slide 34: CSG Water – Update on Brine Solutions

    CSG Water – Update on Brine Solutions  Base case strategy for brine management  Going forward, the focus is on the base For personal use only (outlined in the EIS) is holding brine in case and Brine Injection ponds prior to storage in a mixed salt  Optimization studies show that storage facility

  35. Slide 35: Bowen E&A

    Bowen E&A Northern Bowen – programme CY14/15 Multi-well vertical pilots underway. Frac Pilots and For personal use only Horizontal well pilots planned. • Looking forward, Exploration & Appraisal is focused on areas outside the core high confidence development areas • Objectives are to Spring Gully F

  36. Slide 36: Surat E&A

    Surat E&A Exploration programme CY14/15 For personal use only Upside – Deep Conventional Test Walloons Low Perm – encouraging pilot results. Frac Condabri South – Pilots underway. Prove up reserves & secure tenure as PL 35 |

  37. Slide 37: Sustain Phase

    For personal use only Sustain Phase

  38. Slide 38: Drilling continues in the Walloons and Spring Gully areas through to 2020

    Drilling continues in the Walloons and Spring Gully areas through to 2020 … For personal use only Development focused on Walloons and Spring Gully in period to 2020: • Moving out from, and infill drilling in, initial development areas • ~75% of wells in the Walloons • Low percentage of fracced wells

  39. Slide 39: Optimisation of Drill Complete Connect costs

    A key focus of the sustain phase is optimisation of current Drill Complete Connect costs of approximately $3 million per well For personal use only Opportunities for reducing Drill Complete Connect costs: • Process improvement • Contracting strategy • Technology and Innovations: • Horizontal drillin

  40. Slide 40: Extracting scale benefits and driving operating cost reductions

    Extracting scale benefits, utilising new technologies and maximising productivity to drive operating cost reductions For personal use only As more wells come online expect to realise scale benefits, driving down operating costs, with specific areas of focus to optimise activities: • Labour and assoc

  41. Slide 41: Metrics

    For personal use only Metrics

  42. Slide 42: First full year of earnings and cash flows from both APLNG trains expected FY2017

    The first full year of earnings and cash flows from both APLNG trains is expected to be FY2017… For personal use only • With the phased start up of Train 1 and Train 2, APLNG’s FY2016 financial results will be subject to the following factors: • The rate at which LNG production ramps up from ready f

  43. Slide 43: APLNG Reference Information - Sales

    APLNG Reference Information Reference information in respect of the APLNG project and operations For personal use only Sales Reference Metric Source LNG Train Capacity 9.0 mtpa FID2 Presentation 4 July 2012 Contract LNG Export Volumes 8.6 mtpa FID2 Presentation 4 July 2012 LNG Export Contracts Terms

  44. Slide 44: APLNG Reference Information - Operating Expenditure and Project Finance

    APLNG Reference Information Operating Expenditure For personal use only Reference Metric Source Operating expenditure Key components comprise This presentation • Downstream liquefaction costs • Upstream operating expenditure includes: • Upstream well & facilities maintenance and reliability • Upstre

  45. Slide 45: APLNG Reference Information - Upstream Sustaining Capital Expenditure

    APLNG Reference Information Upstream Sustaining Capital Expenditure For personal use only Reference Metric Source Upstream sustaining capital • Expect around 300 operated wells drilled This presentation expenditure per year in near term • Drill, complete, connect cost approximately $3m per operated

  46. Slide 46: Downstream Project Delivery

    For personal use only Downstream Project Delivery

  47. Slide 47: Curtis Island designated as an LNG precinct

    Curtis Island has been designated as an LNG precinct by the State and Federal governments For personal use only 46 |

  48. Slide 48: APLNG Downstream Facilities

    APLNG Downstream Facilities Liquefaction of natural gas is an established technology. The project utilises the Optimised Cascade Technology similar to the Darwin LNG project which has operated since 2006 For personal use only • Two trains of 4.5 mtpa capacity, consisting of: – 6 General Electric (GE

  49. Slide 49: Optimized Cascade Process

    Optimized Cascade Process For personal use only 48 |

  50. Slide 50: Downstream Project progress - 70% complete and on track

    Downstream Project progress - 70% complete and on track at 30 April 2014 For personal use only FY2014 Downstream Operated Goals Actual Progress to 30 April 2014 Plan First cryo modules set Q3 Accomplished: Feb 2014 Last Train 2 refrigeration compressor set Q3 Accomplished: Mar 2014 Complete loading

  51. Slide 51: Project Highlights

    Project Highlights For personal use only • Downstream project is on schedule – Engineering is effectively complete with no holds for construction remaining – Procurement is in line with plan. All major equipment has now been delivered and set. Minor critical items are expedited as necessary – All dr

  52. Slide 52: Downstream project current status - Construction

    Downstream project current status - Construction For personal use only LNG TRAINS MARINE FACILITIES • Train 1 construction approaching 60% • Piling has been completed. The loading arms complete. All equipment has been set. One have been installed module remaining (due to be set early June). • The je

  53. Slide 53: Downstream project current status - Construction

    Downstream project current status - Construction For personal use only Train 2 Cold Boxes loaded out for shipment Module 101DA delivered to site 52 |

  54. Slide 54: Full operations

    Full operations For personal use only • Key data • 4.5mmtpa per train • ~730TJ/day gas rate per train • ~30,000m3/day of LNG per train • ~6 days to fill a Tank when one train running ~3 days to fill a tank when two trains running • Ship every 6 days with one train & 3 days with two trains • <12-14hr

  55. Slide 55: Fishermans Landing Northern Expansion (FLNE)

    Fishermans Landing Northern Expansion (FLNE) Bund Wall For personal use only 54 |

  56. Slide 56: Port of Gladstone Overview

    Port of Gladstone Overview For personal use only 55 |

  57. Slide 57: Curtis Island Site – May 2014

    Curtis Island Site – May 2014 For personal use only Construction Facilities Accommodation Village RO/RO Control & Ramp Utilities Maintenance Ferry & Rock Causeway Train 2 Train 1 MOF Tank B Tank A LNG Jetty 56 |

  58. Slide 58: Trains & Outside Battery Limits (OSBL) – May 2014

    Trains 1 & 2 Outside Battery Limits (OSBL) – May 2014 For personal use only 57 |

  59. Slide 59: Trains & Inside Battery Limits (ISBL) – May 2014

    Trains 1 & 2 Inside Battery Limits (ISBL) – May 2014 For personal use only 58 |

  60. Slide 60: Train – May 2014

    Train 1 – May 2014 For personal use only Hot Oil Heater/Incinerator Area – Piping Installation Propane Refrigeration Area – Setting “Candy Cane” on Propane Suction Drum 59 |

  61. Slide 61: Train Area – May 2014

    Train 2 Area – May 2014 For personal use only 60 |

  62. Slide 62: Train – May 2014

    Train 2 – May 2014 For personal use only Propane Suction Drums Set Compressor Substation being moved into position 61 |

  63. Slide 63: LNG Tanks – May 2014

    LNG Tanks – May 2014 For personal use only 62 |

  64. Slide 64: Permanent Buildings – May 2014

    Permanent Buildings – May 2014 For personal use only 63 |

  65. Slide 65: LNG Jetty – May 2014

    LNG Jetty – May 2014 For personal use only Loading Platform & Trestle Loading Arms installed on Platform 64 |

  66. Slide 66: Module Yard – April / May 2014

    Module Yard – April / May 2014 For personal use only Final Train 1 Module (Propane Chiller 101JA) & First Train 2 Module (Sub-Cooler 202 NE) shipped on 22 April Propane Condenser 202ND shipped 13 May 65

  67. Slide 67: Curtis Island - May 2014

    Curtis Island - May 2014 For personal use only 66

  68. Slide 68: Thank you

    For personal use only Thank you

Origin Energy — Technical Presentation (May 2014) on 6ix