Emerald Horizon Ag · VIE:SMRX
Emerald Horizon — Pitch Deck (January 2026)
17 slides from Emerald Horizon's pitch deck, January 2026
Slide 1: Energy Storage and Energy Production Equity Offer
ENERGY STORAGE EQUITY OFFER FOR EU €75 M USA $85 M LAST POST-MONEY VALUATION EUR 791.2M NO FURTHER EQUITY NEEDED ENERGY PRODUCTION TO TRL 9 CONFIDENTIAL
Slide 2: Solving Problems with High Impact Potential
SOLVING PROBLEMS WITH HIGH IMPACT POTENTIAL Problem-Risk-Need- Analysis No critical chain reaction Zero CO2 emission No risk of explosion Non-volatile energy No meltdown risk No large powerlines No plutonium or uranium 235 High power density Solution for: Non-weapons-grade material High profitabilit
Slide 3: Solution - 2 Groundbreaking Innovations
SOLUTION - 2 GROUNDBREAKING INNOVATIONS Dual Income modular & scalable ADES Accelerator Driven Energy Source ADVANCED NUCLEAR ENERGY TECH Energy Production 25 MW(th) - Thorium based - Accelerator Driven – Molten salt TRL 4.5 / 9 (NOT READY YET-> capital round) NON-Criticality No critical chain react
Slide 4: Dual Income – Client Pricing & Investor Returns
DUAL INCOME – CLIENT PRICING & INVESTOR RETURNS 20-YEAR Simplified economics: what the customer pays vs. what Emerald Horizon earns REVENUE (20-years contract terms) STREAM ENERGY AS A DUAL SERVICE ADES INCOME “moonshot” DUALstore Plus „stable income“ KEY ASSUMPTIONS (FOR PROFESSIONAL BACK-CALC) ADE
Slide 5: ADES - Accelerator Driven Energy Source
ADES - ACCELERATOR DRIVEN ENERGY SOURCE The scalable and risk-optimized solution for CO₂-free energy READY FOR ON/OFF switch ORDER Output: • ADES has a passive-safe ON/OFF control unit. EST. 2029 High temperature heat AI-powered optimization To generate: • ADES leverages AI to adjust its power outpu
Slide 6: ADES – Prototype Setup to Serial Product TRL 9
ADES – PROTOTYPE SETUP –> SERIAL PRODUCT TRL 9 PUMP TIER-1 execution CONTAINMENT: partner isolation, shielding HTHX Co-Development to achieve TRL 9 THORIUM-LOOP Manufacturing INJECTOR Supply Chain (Accelerator) TRANSFER HTHX Reality check: All prototype components already exist Censored for security
Slide 7: DUALstore PLUS - Modular 5 to 100 MWh - First Bankable Product
DUALstore PLUS - MODULAR 5 TO 100 MWh - FIRST BANKABLE PRODUCT Hybrid storage system combining high-temperature heat (TESS) and electricity storage (BESS). READY FOR • CALstore: 5 MWh(th) molten-salt thermal storage; efficiency >98%; unlimited cycling (as stated) ORDER EST. Q3 2026 • Estore: ~5 MWh(
Slide 8: CALstore (TESS) – Heat Storage System - Prototype Setup
CALstore (TESS) – HEAT STORAGE SYSTEM - PROTOTYPE SETUP CALstore is a 5 MWh molten salt heat storage system that balances energy oversupply with demand. It supports Government-funded, ADES, is part of DUALstore PLUS, and can also operate as a stand-alone system. with ongoing oversight & periodic • T
Slide 9: Brains Behind the Innovation & Tier-1 Partners Worldwide
51 BRAINS BEHIND THE INNOVATION & TIER-1 PARTNERS WORLDWIDE EXECUTIVE TEAM – Leaders with experience at the World Bank (former Director), the IMF, the Austrian National Bank Team (former Governor), PwC, and including a former Minister for & Infrastructure, Technology and Innovation Supervisory Board
Slide 10: Offer for Investors €75m $85m
OFFER FOR INVESTORS 3-track structure: EU equity + US equity + Slovakia cash relief (non-dilutive) • Real paid-in valuation reference (€791.2m post-money) Equity offers (2 tranches) with a peer set that supports billion-scale outcomes Parallel subscriptions in Europe and the U.S.; designed for insti
Slide 11: Readiness - Valuation Triggers
READINESS - VALUATION TRIGGERS Readiness scorecards (current) Timeline and near-term milestone triggers Company readiness (non-technical) Now 2026 2027 2028+ 1935 / 2700 72% What investors underwrite • Execution confidence + governance package Estore deliveries CALstore deliveries TRL closure / orde
Slide 12: Appendix – Metrics – Credibility
APPENDIX – METRICS – CREDIBILITY
Slide 13: Company Readiness — Non-Technical Scorecard
COMPANY READINESS — NON-TECHNICAL SCORECARD 27 underwriting checks to rate execution confidence, regulatory clarity, and commercial bankability (score 0–100). 1-9 Concept & Differentiation 10-18 Execution & Profitability 19-27 Regulatory, Sales & Bankability 1 Climate-tech thesis (CO2-free) 3 COMPAN
Slide 14: DUALstore PLUS Technical Readiness
DUALstore PLUS Technical Readiness – Milestones achieved - DELTA remaining part to TRL 9 1-9 Estore (BESS) - stand-alone or DUALstore 10-18 CALstore (TES) - stand-alone or DUALstore 19-27 MCU (Master Control Unit) DUALstore 1 Basic validated foundation DUALSTORE PLUS - READYNESS DETAILS - 2700 TARGE
Slide 15: ADES Technical Readiness
ADES Technical Readiness – Milestones achieved – DELTA remaining part to TRL 9 1-9 Structures (non-NUC) & Heat Transfer Loop 10-18 Accelerator (ACC) + Plasma + Targets 19-27 Nuclear Energy Release & Energy Transfer-Salt Loop 1 Basic validated foundation ADES - READYNESS DETAILS - 2700 TARGET 2 Conce
Slide 16: ADES Energy Equation - Transmuting & Harvesting
ADES ENERGY EQUATION - TRANSMUTING & HARVESTING Physics-Based Validation Stable flux realization will be achieved using accelerator-based neutron sources (two complementary solutions will ultimately be available - risk reduction). capture Th-232 For further details see fission U-233 Investment Propo
Slide 17: Accelerator Energy — Building the Future of Clean Power
Emerald LaboraTHorium Karl-Huber-Gasse 15 A-8041 Graz www.emerald-horizon.com ACCELERATOR ENERGY — BUILDING THE FUTURE OF CLEAN POWER Disclaimer: This material is provided for information purposes only and does not constitute an offer or solicitation to buy or sell securities in the United States or