Robyg S.A. · GPW:ROB
Robyg — Q1 2024 Earnings Presentation
60 slides from Robyg's earnings presentation, June 2024

Slide 1: Financial Results 1Q 2024
FINANCIAL RESULTS 1Q 2024 Warsaw, June 2024 1

Slide 2: Agenda
AGENDA PART 01 Summary PART 02 Presales and revenue’s perspective PART 03 Financial results PART 04 Plans of ROBYG Group PART 05 ESG PART 06 Appendices 2

Slide 3: Part 01 Summary 1Q 2024
ROBYG PART 0! Summary 1Q 2024

Slide 4: Summary 1Q 2024
01. Summary 1Q 2024 Summary Operating cash flow: Revenues: Strong cash position*: PLN 244 million PLN 402 million PLN 649 million (excl. purchase of new plots) 4 * Including amounts kept on individual escrow accounts.

Slide 5: Summary – ROBYG Group
01. Summary 1Q 2024 Summary – ROBYG Group Developer agreements signed: Units presold: 436 Total land bank units: 14 124 665 (net after cancellations) (net after cancellations) Units on offer: 1 843 Number of units recognized in Number of units under (out of which 5% finished goods)* revenues: 687 co

Slide 6: Material acquisitions and financial activities
01. Summary 1Q 2024 ROBYG Group – material acquisitions and financial activities Total new financing: PLN 60 million New plots NEW PLOTS FINANCING Gdynia CREDIT FACILITIES Area of plots [ha] Type of contracts Locations • revolving loan with the limit of PLN 60 milion 0.1 Final Gdynia, Śródmieście**

Slide 7: Part 02 Presale & revenue perspective
PART 02 Presale & revenue perspective 7

Slide 8: Presale structure – quarterly net units presold
02. Presales & revenue’s perspective ROBYG Group – presale structure Presale in 1Q 2024: 436** units (-45% 1Q’24/ 1Q’17-23*), PLN 377 million (11% 1Q’24/ 1Q’17-23*) Net number of presold units (quarterly) 1196 1032 938 894 892 776 638 650 509 445 436 381 Q2 2021 Q3 2021 Q4 2021 Q1 2022 Q2 2022 Q3 20

Slide 9: Presale structure – annual net units presold
02. Presales & revenue’s perspective ROBYG Group – presale structure Presale in 1Q 2024: 436** units (-45% 1Q’24/ 1Q’17-23*), PLN 377 million (11% 1Q’24/ 1Q’17-23*) Net number of presold units (annually) 4276 4308 98% 17% 3471 -50% -27% -50% 27% 2957 2% 45% 2809 2569 -16% 31% 10% 2520 2333 22% 2118

Slide 10: Presale structure by city
02. Presales & revenue’s perspective ROBYG Group – presale structure Presale in 1Q 2024: 436 units (-45% 1Q’24/ 1Q’17-23*), PLN 377 million (11% 1Q’24/ 1Q’17-23*) Gdansk & Gdynia 47% 207 units** Poznan 7% 32 units Wroclaw 7% 29 units Warsaw 39% 168 units** 10 * The average number/value of contracted

Slide 11: Units on offer
02. Presales & revenue’s perspective ROBYG Group – units on offer Number of units on offer 3491 FINISHED GOODS ON OFFER: 5% 190 2724 166 2297 1843 ** 112 1729 3301 99 2558 205 2185 1524 1744 1Q 2023 2Q 2023 3Q 2023 4Q 2023 1Q 2024 Units under construction* Units completed * Including residential uni

Slide 12: Revenue recognition as at 31 March 2024
02. Presales & revenue’s perspective ROBYG Group – revenue recognition (as at 31 March 2024) Recognition potential of units in revenues Number of units recognized in revenues (quarterly) Units not presold and not 2308 Recognized*: 1 843 2071 Completed: 99 Under construction: 594 Which construction h

Slide 13: Units to be completed in 2024-2025
02. Presales & revenue’s perspective Number of units to be completed in 2024-2025 and also (contracted) until 31 March 2024 Note: Estimation of the completed investments ( may change. Total & Presold 2023 2024 2025 2024+2025 Total units Presold Total units Presold Total units Presold Total units Pre

Slide 14: Number of units to be completed in 2024
02. Presales & revenue’s perspective Number of units to be completed in 2024 Gdansk&Gdynia Warsaw Poznan Total no. of units to be Total no. of units to be Total no. of units to be Project Project Project completed in 2024 r. completed in 2024 r. completed in 2024 r. Sea Salt 118 Mój Ursus* 677 Począ

Slide 15: Number of units to be completed in 2025
02. Presales & revenue’s perspective Number of units to be completed in 2025 Gdansk & Gdynia Warsaw Wroclaw & Poznan Total no. of units to be Total no. of units to be Total no. of units to be Project Project Project completed in 2025 r. completed in 2025 r. completed in 2025 r. Nadmotławie 235 Osied

Slide 16: Part 03 Financial results
ROBYG PART Financial results 16

Slide 17: Financial results
03. Financial results Financial results (PLNk) Q1 2024 Q1 2023 Change 2023 Revenues 401 824 221 586 81,34% 1 813 037 Cost of sales (317 475) (163 330) 94,38% (1 350 817) Gross profit on sales 84 349 58 256 44,79% 462 220 Selling and marketing expenses (5 922) (7 500) (21,04%) (31 400) Administrative

Slide 18: Financial condition
03. Financial results Financial condition (PLNk) Q1 2024 Q1 2023 Change 2023 Total assets, including: 3 262 121 3 327 347 (1,96%) 3 291 950 Non-current assets, including: 733 576 599 412 22,38% 724 258 Investment properties 455 648 461 042 (1,17%) 453 200 Inventories 1 731 190 2 232 337 (22,45%) 1 8

Slide 19: Statement of cash flow
03. Financial results Statement of cash flow (PLNk) Q1 2024 Q1 2023 2023 Net cash flows from operating activities, 233 138 67 121 515 656 including: Expenditures for the purchase of new plots (11 300) - (154 417) Net cash flows from investing activities, including: (5 305) 1 107 25 523 - - 99 419 -

Slide 20: Debt financing
03. Financial results Debt financing Nominal value and maturity of bank credit facilities and bonds as at 31 March 2024 (PLNm). DEBT – Aging <1 year 1-2 years 2-3 years 3-4 years 4-5 years Over 5 years Total BANK CREDIT 0.00 0.00 0.00 190.00 0.00 0.00 190.00 FACILITIES BONDS 100.00 170.00 90.00 0.00

Slide 21: Leverage and collections as at March 2024
03. Financial results Leverage and collections as at 31 March 2024 * Net debt ratio = net debt ** / equity ** Net debt = interest bearing liabilities + derivatives + guarantees Net debt ratio* = (0.18) granted – intercompany loans – cash and cash equivalents – amounts kept on individual escrow accou

Slide 22: Part 04 Plans of ROBYG Group
PART 04 Plans of ROBYG Group 22

Slide 23: Strategy
04. Plans of ROBYG Group Strategy Strategy for the operational and business activities of the ROBYG Group agreed with TAG Immobilien AG (hereinafter: "TAG") for all TAG activities on the Polish residential market, i.e. for the activities of the ROBYG Group and Vantage Development S.A. Areas ROBYG Gr

Slide 24: Strategic goals
04. Plans of ROBYG Group Strategic goals Number of presold residential units in 2024 exceeding 2 100 units Increasing sales in the years ahead Maintaining the margins Expansion of activities in Wrocław, Tricity and Łódź Expansion of the land bank Realisation of the ROBYG’s ESG strategy 24

Slide 25: Total land bank units
04. Plans of ROBYG Group Total land bank 14 124 units + 1 729 units on offer = 15 967 units Gdansk&Gdynia Warsaw Wroclaw Poznan Number of Number of Number of Number of District % District % District % District % units units units units Ujescisko 204 7% Wilanow 221 4% Stare Miasto 299 20% Piatkowo 1

Slide 26: Commercial potential
04. Plans of ROBYG Group Commercial potential = 35 000 sqm of usable area Commercial potential = 35 000 sqm of usable area WROCLAW* 35 000 TOTAL: 35 000 sqm 26 * Preliminary land purchase agreements.

Slide 27: Part 05 ESG
PART 05 ESG Creating people and planet friendly spaces 27

Slide 28: ESG – For society and environment
05. ESG FOR SOCIETY AND ENVIRONMENT MISSION OUR VALUES DIRECTIONS “Our goal at ROBYG is to build homes and suitable surroundings for our clients. We develop homes CARE and housing developments for entire communities The protection of natural resources and that are integrated with the surrounding car

Slide 29: ESG – Environmental dimension
05. ESG – Environmental dimension ROBYG FOR PLANET Focus Areas ▪ Green standard: successfully incorporating eco- friendly and low-carbon solutions 15 ▪ Making 15-minute city concept a reality ▪ Water and biodiversity Strategic Goals ROBYG for Planet means that we lead a sustainable development proce

Slide 30: ROBYG Green Standard
05. ESG – Environmental dimension ROBYG FOR PLANET ROBYG GREEN STANDARD 30

Slide 31: ESG – Social dimension
05. ESG – Social dimension ROBYG FOR PEOPLE Focus Areas ▪ Building new, integrated communities ▪ Employee well-being: be the employer that attracts, retains and grows people. ▪ Client satisfaction For us, construction is part of a new community shaping Strategic Goals process, which combines such el

Slide 32: ESG – Human Balance
05. ESG – Social dimension ROBYG FOR PEOPLE HUMAN BALANCE 32

Slide 33: ESG – Governance dimension
05. ESG – Governance dimension ROBYG FOR SUSTAINABLE BUSSINES Focus Areas ▪ ESG in management practices ▪ Annual ESG disclosure & transparent business Strategic Goals ▪ ROBYG ESG Website www.esg.robyg.pl We act responsibly by choosing to partner with local businesses, ▪ ROBYG ESG Strategy caring for

Slide 34: ESG
05. ESG All of us at ROBYG acknowledge how important sustainable growth is for the envirnomnent and society. So far we have done a lot, but we treat this is a journey that will involve over time. Thus, we are committed to continuing our work to constantly improve our performance and disclose it to t

Slide 35: Part 06 Appendices
PART 06 Appendices 35

Slide 36: Senior Management Team
06. Appendices Senior Management Team Oscar Kazanelson Artur Ceglarz Dariusz Pawlukowicz Eyal Keltsh Marta Hejak Chairman of the Supervisory Vice President, Vice President, President of the Board, CEO Vice President, CFO Board Head of Business Dev. Head of HR Years at ROBYG: 20+ Years at ROBYG: 16 Y

Slide 37: Ownership structure
06. Appendices Ownership structure TAG Immobilien AG holds indirectly 100% of ROBYG S.A. shares. TAG Immobilien AG is a MDAX-listed (Frankfurt Stock Exchange) real estate company. 37

Slide 38: TAG Immobilien AG consolidated financials
06. Appendices TAG Immobilien AG consolidated financials (EURm) Financial data (EURm) Q1 2024 2023 2022 2021 2020 2019 2018 Assets 7 303.81 7 299.80 8 214.60 7 088.60 6 478.00 5 647.00 5 033.30 Equity 3 025.19 2 964.50 3 307.70 3 129.50 2 681.50 2 394.20 2 048.30 EBITDA (adjusted) 61.4 236.4 233.5 2

Slide 39: Investments under construction (1)
06. Appendices Description of investments – under construction (1) Lawendowe Wzgórza / Osiedle Kameralne City Sfera Stacja Nowy Gdansk City: Gdansk City: Warsaw City: Warsaw District: Jasień District: Bemowo District: Włochy No. of stages: ca. 35 No. of stages: 8 No. of stages: 12 Stages completed:

Slide 40: Investments under construction (2)
06. Appendices Description of investments – under construction (2) Young City 2 Modern City Jagodno City: Warsaw City: Warsaw City: Wroclaw District: Bemowo District: Bemowo District: Krzyki No. of stages: 3 No. of stages: 9 No. of stages: 10 Stages completed: 1 Stages completed: 4 Stages completed:

Slide 41: Investments under construction (3)
06. Appendices Description of investments – under construction (3) Osiedle Życzliwa Praga Nadmotławie Estate Mój Ursus City: Warsaw City: Gdansk City: Warsaw District: Tarchomin District: Śródmieście District: Ursus No. of stages: 8 No. of stages: 9 No. of stages: 8 Stages completed: 6 Stages comple

Slide 42: Investments under construction (4)
06. Appendices Description of investments – under construction (4) Szumilas Royal Residence Porto City: Gdansk (Kowale) City: Warsaw City: Gdansk District: Wilanów District: Nowy Port No. of stages: 6 No. of stages: 7 No. of stages: 7 Stages completed: 2 Stages completed: 4 Stages completed: 2 Stage

Slide 43: Investments under construction (5)
06. Appendices Description of investments – under construction (5) Sea Salt Początek Piątkowo Sady Ursynów City: Gańsk City: Poznań City: Warsaw District: Zaspa District: Piątkowo District: Ursynów No. of stages: 1 No. of stages: 7 No. of stages: 5 Stages under construction: 1 Staegs completed: 1 St

Slide 44: Investments under construction (6)
06. Appendices Description of investments – under construction (6) Rytm Mokotowa Praga Piano Jutrzenki 92 City: Warszawa City: Warszawa City: Warszawa District: Mokotów District: Praga Południe District: Włochy No. of stages: 4 No. of stages: 1 No. of stages: 1 Stages under construction*: 2 Stages u

Slide 45: Investments under construction (7)
06. Appendices Description of investments – under construction (7) Wendy Rosa Przystanek Tarnogaj City: Gdynia City: Gdańsk City: Wrocław District: Śródmieście District: Ujeścisko District: Krzyki No. of stages: 5 No. of stages: 3 No. of stages : 1 Stages under construction*: 1 Stages under construc

Slide 46: Investments completed (1)
06. Appendices Description of investments – completed (1) Szczęśliwy Dom Osiedle Zdrowa Nowa Rezydencja Królowej Marysieńki City: Warsaw City: Warsaw City: Warsaw District: Ochota District: Wilanów District: Wilanów No. of stages: 3 No. of stages: 5 No. of stages: 10 No. of units: 304 units No. of u

Slide 47: Investments completed (2)
06. Appendices Description of investments – completed (2) City Apartments Osiedle Królewskie Albatross Towers City: Warsaw City: Warsaw City: Gdansk District: Żoliborz District: Wilanów District: Przymorze No. of stages: 6 No. of stages: 6 No. of stages: 5 No. of units: 1 190 units No. of units: 640

Slide 48: Investments completed (3)
06. Appendices Description of investments – completed (3) Królewski Park Park Wola Residence Modern Żoliborz City: Warsaw City: Warsaw City: Warsaw District: Wilanów District: Wola District: Żoliborz No. of stages: 6 No. of stages: 1 No. of stages: 1 No. of units: 528 units No. of units: 317 units N

Slide 49: Investments completed (4)
06. Appendices Description of investments – completed (4) Young City Młody Wilanów Mila Baltica City: Warsaw City: Warsaw City: Gdansk District: Bemowo District: Wilanów District: Zaspa No. of stages: 9 No. of stages: 3 No. of stages: 2 No. of units: 1 302 units No. of units: 257 units No. of units:

Slide 50: Investments completed (5)
06. Appendices Description of investments – completed (5) Apartamenty Villa Nobile Słoneczna Morena MoreNova City: Warsaw City: Gdansk City: Gdansk District: Wilanów District: Piecki-Migowo District: Piecki-Migowo No. of stages: 3 No. of stages: 22 No. of stages: 3 No. of units: 637 units No. of uni

Slide 51: Investments completed (6)
06. Appendices Description of investments – completed (6) Ogrody Wilanów Green Mokotów Stacja Nowy Ursus City: Warsaw City: Warsaw City: Warsaw District: Wilanów District: Mokotów District: Ursus No. of stages: 3 No. of stages: 9 No. of stages: 5 No. of units: 221 units No. of units: 673 units No. o

Slide 52: Investments completed (7)
06. Appendices Description of investments – completed (7) Forum Wola Praga Arte Leśna Przystań City: Warsaw City: Warsaw City: Wroclaw District: Wola District: Praga Południe District: Osobowice No. of stages: 4 No. of stages: 1 No. of stages: 1 No. of units: ca. 880 units No. of units: ca. 250 unit

Slide 53: Investments completed (8)
06. Appendices Description of investments – completed (8) Willa Nad Potokiem Uroczysko Zajezdnia Wrzeszcz City: Wroclaw City: Wroclaw City: Gdansk District: Fabryczna District: Psie Pole District: Wrzeszcz No. of stages: 1 No. of stages: 3 No. of stages: 14 No. of units: 13 units No. of units: 309 u

Slide 54: Investments completed (9)
06. Appendices Description of investments – completed (9) Więcej Park Południe Apartamenty Królewskie City: Gdansk City: Gdansk City: Warsaw District: Łostowice District: Łostowice District: Wilanów No. of stages: 2 No. of stages: 8 No. of stages: 2 No. of units: 378 units No. of units: 565 units No

Slide 55: Investments completed (10)
06. Appendices Description of investments – completed (10) Praga Deco Wojszyckie Alejki Młode Stogi City: Warsaw City: Wroclaw City: Gdansk District: Praga Południe District: Krzyki District: Stogi No. of stages: 1 No. of stages: 2 No. of stages: 1 No. of units: 192 units No. of units: 210 units No.

Slide 56: Investments completed (11)
06. Appendices Description of investments – completed (11) Kameralna Olszówka Apartamenty przy metrze Wiśniowa Aleja City: Wrocław City: Warsaw City: Gdansk District: Krzyki District: Bemowo District: Ujescisko No. of stages: 1 No. of stages: 1 No. of stages: 2 No. of units: 55 units No. of units: 8

Slide 57: Investments completed (12)
06. Appendices Description of investments – completed (12) VISTA (Myśliwska) Dożynkowa 43 Osiedle nad Widawą City: Gdansk City: Wrocław City: Wrocław District: Piecki-Migowo District: Krzyki District: Psie Pole No. of stages: 1 No. of stages: 1 No. of stages: 1 No. of units: 87 units No. of units: 1

Slide 58: Investments completed (13)
06. Appendices Description of investments – completed (13) Moment Lagom Nowa Letnica City: Gdansk City: Gdansk City: Gdansk District: Ujescisko District: Ujescisko District: Letnica No. of stages: 2 No. of stages: 1 No. of stages: 9 No. of units: 207 units No. of units: 41 units No. of units: 2 197

Slide 59: Disclaimer
Disclaimer ROBYG S.A. endeavours to ensure that the information in the presentation is complete and up-to-date, however, we do not make any guarantees in this respect. ROBYG S.A. accepts no liability for the any errors and inaccuracies of this presentation. This presentation has been prepared solely

Slide 60: Summary 1Q 2024 and contact
Summary 1Q 2024 Units presold: 436 (net after cancellations) Please contact us: Investor Relations Developer agreements signed: 665 (net after cancellations) ROBYG S.A. ri@robyg.com.pl (22) 419 11 00 Units on offer: 1 843 (out of which 5% are finished goods) Revenues: PLN 402 million Strong cash pos
Source: company website
More decks from Robyg S.A.
H1 2026 Earnings Presentation63 slides · September 2026
H1 2026 Earnings Presentation63 slides · September 2026
Investor Presentation (August 2026)57 slides · August 2026
Q1 2026 Earnings Presentation64 slides · June 2026
Investor Presentation (May 2026)113 slides · May 2026
FY2025 Earnings Presentation63 slides · March 2026