  1. Slide 1: Q4 2023 Results Presentation

    Q 4 2 0 2 3 R E S U LT S P R E S E N TAT I O N FEBRUARY 23, 2024

  2. Slide 2: Cautionary Information

    CAUTIONARY INFORMATION This presentation contains forward-looking information within the meaning of applicable Canadian and United States securities legislation. All information contained in this presentation, other than statements of current and historical fact, is forward-looking information. Ofte

  3. Slide 3: 2023 Key Achievements

    2023 KEY ACHIEVEMENTS TRANSFORMATIVE STRATEGIC INITIATIVES ENABLED PRODUCTION GROWTH AND FREE CASH FLOW GENERATION  Achieved 2023 guidance targets through execution of brownfield investment initiatives o First year of Pampacancha high-grade ore o Completion of Stall and New Britannia mill recovery

  4. Slide 4: Record Quarterly Production

    RECORD QUARTERLY PRODUCTION CONTINUED INCREASE IN COPPER EQUIVALENT PRODUCTION TO DRIVE STABLE OPERATING BASE COPPER EQUIVALENT PRODUCTION BY REGION 8% QoQ increase in consolidated copper production to 45k tonnes 80 78.0 11% QoQ increase in consolidated gold 71.3 production to 113k ounces (CuEq tonn

  5. Slide 5: Q4 2023 Consolidated Results

    Q4 2023 CONSOLIDATED RESULTS RECORD QUARTERLY OPERATING AND FINANCIAL PERFORMANCE Higher copper and gold production drove strong KEY RESULTS SUMMARY production and significantly reduced cash costs Q4 2023 Q3 2023 2023 2022 Production1, 2 Record quarterly gold production Copper kt 45.5 42.0 131.7 104

  6. Slide 6: Peru Operations Review

    PERU OPERATIONS REVIEW INCREASED COPPER PRODUCTION AND EXCEEDED TOP END OF GOLD PRODUCTION GUIDANCE RANGE SUMMARY OF PERU OPERATING STATISTICS Q4 copper production increased by 14% Q4 2023 Q3 2023 2023 2022 compared to Q3 Constancia ore mined (million tonnes)1 1.0 1.2 9.3 25.8 Pampacancha ore mined

  7. Slide 7: Manitoba Operations Review

    MANITOBA OPERATIONS REVIEW HIGHER GRADE GOLD ZONES WITH STRONG RECOVERIES CONTINUE TO DRIVE PRODUCTION SUMMARY OF SNOW LAKE OPERATING STATISTICS 59,863 ounces of gold production, a 6% Q4 2023 Q3 2023 2023 20224 increase QoQ, due to continued higher Ore mined (kt) 372.4 367.5 1,526.7 1,516.2 grades a

  8. Slide 8: British Columbia Operations Review

    BRITISH COLUMBIA OPERATIONS REVIEW RELEASED TECHNICAL REPORT FOR COPPER MOUNTAIN STABILIZATION AND 21-YEAR MINE PLAN SUMMARY OF COPPER MOUNTAIN OPERATING STATISTICS 2024 implementation of improved maintenance practices to drive higher mill availability Q4 2023 Q3 2023 Since2023 Acquisition Ore mined

  9. Slide 9: Copper Mountain Technical Report

    COPPER MOUNTAIN TECHNICAL REPORT Reliable Operations Stabilization Plans 21 Years 45k tpd Improving reliability and driving sustainable long-term value: 1. Increased mining activities Mine Life Nameplate mill capacity Fleet ramp-up plan to remobilize idle haul trucks, 28 trucks remobilized up in 202

  10. Slide 10: Continued Financial Discipline

    CONTINUED FINANCIAL DISCIPLINE DELEVERAGING WITH DELIVERED HIGHER CASH FLOWS AND SPENDING REDUCTIONS $602M $274M $161M Increased cash and cash equivalents to $250M Record Q4 revenue Record Q4 Q4 free cash flow1 adj. EBITDA2 Reduce net debt by $95M to $1,038M in Q4 +$122M increase +$84M increase +$50

  11. Slide 11: Production Guidance

    PRODUCTION GUIDANCE 2023 ACHIEVEMENTS 2024 PRODUCTION GUIDANCE Successfully met 2023 Year Ended Contained Metal in Concentrate and Dore1 2024 Guidance 2023 Guidance Dec. 31, 2023 production guidance PERU for all metals Copper tonnes 98,000 - 120,000 100,487 91,000 - 116,000 Peru exceeded the top Gol

  12. Slide 12: Cash Cost Guidance

    CASH COST GUIDANCE OPERATING EFFICIENCIES TO DRIVE SCALE AND REDUCE COSTS Consolidated cash costs achieved the low end of the 2023 annual cost guidance range Consolidated sustaining cash costs exceeded the low end of the 2023 annual cost guidance range 2024 cash cost anticipated to be higher with th

  13. Slide 13: Capital Expenditure Guidance

    CAPITAL EXPENDITURE GUIDANCE DISCIPLINED DISCRETIONARY SPENDING Delivered on our spending 2024 CAPITAL EXPENDITURES GUIDANCE reduction targets for 2023 Capital Expenditures (in $ millions) 2024 Year Ended 2023 Revised 2023 Original 19% reduction in total capital Guidance4 Dec. 31, 2023 Guidance5 Gui

  14. Slide 14: Exploration Guidance

    EXPLORATION GUIDANCE GREENFIELD OPPORTUNITIES TO TARGET NEW DISCOVERIES Peru Exploration Evaluating Constancia mine plan for 2024 EXPLORATION GUIDANCE additional phases Exploration Expenditures (in $ millions) 2024 Year Ended 2023 Permitting and drill preparation for Guidance Dec. 31, 2023 Guidance

  15. Slide 15: Lalor Winter Drilling Program

    LALOR WINTER DRILLING PROGRAM CROSS-SECTION OF LALOR LENSES & DEEP DRILLING 2023 Drilling Program Results • Lalor Down Plunge - all holes intersected the alternation zone over 2km • Lalor Northwest - New zone discovery within 500 metres of existing infrastructure 2024 Drilling Program • Largest wint

  16. Slide 16: 1901 Development & Exploration Drift

    1901 DEVELOPMENT & EXPLORATION DRIFT Advancing Access to 1901 in 2024 & 2025  1901 is located within 1,000 metres of existing Lalor underground ramp  Develop access drift, drill platforms and diamond drilling to further confirm the optimal mining method to extract the base metal and gold lenses an

  17. Slide 17: Snow Lake Regional Exploration

    SNOW LAKE REGIONAL EXPLORATION 250% INCREASE IN SNOW LAKE LAND PACKAGE WITH OPPORTUNITY TO APPLY MODERN GEOPHYSICS Rockcliff Acquisition  Added 1,800 km2 of highly prospective land in Snow Lake Cook Lake Claims  Located within 10km of Lalor  Historical drilling at a fraction of Lalor’s depth with

  18. Slide 18: 2024 Key Objectives

    2024 KEY OBJECTIVES IN 2024, HUDBAY INTENDS TO: 1. Enhance position to deliver leading copper growth pipeline through copper production growth and maintaining strong gold production from diversified platform with strong cash flow generation in 2024 Always operate 2. Execute stabilization plan at Cop

  19. Slide 19: Diversified Mid-Tier Copper Producer

    DIVERSIFIED MID-TIER COPPER PRODUCER ANNUAL COPPER PRODUCTION & CASH COSTS1,2 REVENUE AND RESERVES BY METAL $1.15 Revenue3 Reserves4 $0.83 $0.86 $0.80 169 $0.74 5% 3% 4% Consolidated Copper Cash 157 156 155 153 4% Production (000 tonnes) 2% 6% Consolidated Copper 132 Costs (US$/lb) 150 kt 99 104 Cu

  20. Slide 20: Questions

    QUESTIONS 20