10 slides from Liontown's conference presentation, May 29, 2024

  1. Slide 1: World's next major lithium producer

    For personal use only World’s next major lithium producer Bell Potter Emerging Leaders Conference May 2024 Tony Ottaviano, Managing Director/CEO LTR LTR ASX: ASX: ltresources.com.au ltresources.com.au 1 Project to date (as at 30 April 2024)

  2. Slide 2: Important Information

    Important Information Forward looking statements The Information in this Presentation that relates to Mineral Resources for the Buldania Project is This Presentation contains forward-looking statements which are identified by words such as ‘may’, ‘could’, ‘believes’, extracted from the ASX announcem

  3. Slide 3: Overview: Kathleen Valley on-track for first production mid-2024

    Overview Kathleen Valley: On-track for first production mid-2024 Tier 1 lithium asset in a premier mining jurisdiction For personal use only - 156 Mt Resource @ 1.4% Li2O, with multi-decade mine life First Production Mid-2024 - Major greenfield project on-track for first production and 3 Mtpa ramp-u

  4. Slide 4: Liontown's strategy – Pathway to world class battery materials producer

    Liontown’s strategy – Pathway to world class battery materials producer For personal use only The best strategies endure the cycles; ours is unchanged. Kathleen Valley Downstream Expansion Liontown Full Potential Full Potential Become a vertically integrated Expand portfolio through organic supplier

  5. Slide 5: Update: Construction on Track, Production Imminent

    Update: Construction on Track, Production Imminent  More than 90%1 complete, on an earned value basis with critical path >94%1 For personal use only  On track to deliver the 3Mtpa base case for initial high value, lower capital Kathleen Valley on track for mid -  Dry Plant commissioning underway,

  6. Slide 6: Mining: Ore Being Stockpiled on ROM, OSP Operating

    Mining: Ore Being Stockpiled on ROM, OSP Operating Open Pit Underground Support infrastructure For personal use only  Kathleen's Corner: 2+ years of feedstock  Ore hygiene #1 priority: clean ore recovery  Fully lined Tailings Storage: TSF1 storing by minimising dilution water for plant start-up.

  7. Slide 7: Processing: Plant Commenced Commissioning

    Processing: Plant Commenced Commissioning Next Gen Flowsheet Quality equipment Construction milestones For personal use only  Simple 100% whole ore flotation based on  Tier-1 proven equipment: Metso-Outotec,  Project 90%1 complete on earned value basis mineralogy and lessons from past plants Weir

  8. Slide 8: All Major Infrastructure Complete or in Commissioning

    All Major Infrastructure Complete or in Commissioning 95MW Hybrid Power Dragonfly Village Operational Readiness For personal use only  Power station commissioning in progress  Dragonfly - or Tjukuparra - represents  Operations Leadership onboard, incl Traditional Owner dreaming story Commissionin

  9. Slide 9: Liontown: first production imminent, growing our Company

    Liontown: first production imminent, growing our Company Debt Facility for 3Mtpa in place, assessing long term funding For personal use only Final push to first production milestone Supply chain logistics and customer preparations on-track Mining operations well underway with parallel ramp-up of ope

  10. Slide 10: For more information

    For more information: For personal use only Leanne Kite Investor Relations Liontown Resources info@ltresources.com.au +61 8 6186 4600 Level 2, 32 Ord Street, West Perth WA 6005 22ABN November 39 118 1532022 825 ASX:LTR ASX : LTR ltresources.com.au ltresources.com.au