  1. Slide 1: Corporate Presentation

    Corporate Presentation September 2013

  2. Slide 2: Disclaimer

    Disclaimer This proprietary presentation (including any accompanying oral presentation, question and answer session and any other document or materials distributed at or in connection with this presentation) (collectively, the “Presentation”) has been prepared by Ithaca Energy Inc. (“Ithaca” or the

  3. Slide 3: Building a highly profitable 25kboe/d North Sea oil and gas company

    Building a highly profitable 25kboe/d North Sea oil and gas company North Sea ‘pure play’ strategy…  Maximise cashflow and production from existing assets  Grow via lower risk undeveloped discoveries and production acquisitions  Deliver first hydrocarbons from the Greater Stella Area  Drill-out

  4. Slide 4: Highly cash generative business established

    Highly cash generative business established Ithaca Today  14.3kboe/d* production in H1-2013, ~95% oil  High netback production, ~$70/boe* H1-2013 - $182M* cashflow from operations  $923M UK tax losses at end Q2-2013 – material value component  $346M net drawn debt at end Q2-2013 – low cost senio

  5. Slide 5: Balanced UK producing and development asset portfolio

    Balanced UK producing and development asset portfolio Ithaca End-2012  Diverse production base – multiple fields 2P Reserves 69MMboe* Dons Causeway / Fionn  Material production growth trajectory driven by Ithaca operated Greater Stella Area Broom 20MMboe Northern SW Heather North Sea Beatrice /Jac

  6. Slide 6: Capital expenditure focused on delivering near term production growth

    Capital expenditure focused on delivering near term production growth Pro-Forma Net Capital Expenditure (M$)* 600 Production Exploration & Net ~$500M Developments Enhancements Appraisal Exploration & Norway Explo Appraisal 500 Production 400 Enhancements 300 Dons infill drilling - Greater Stella Are

  7. Slide 7: Fully funded business plan with robust balance sheet

    Fully funded business plan with robust balance sheet  $182M* cashflow from operations in H1-2013  2013-14 cashflows de-risked by hedging  4.3MMbbl @ $103/bbl** - ~30% puts / ~70% swaps  $923M UK tax allowances pool at end Q2-2013  $572M cash value at 62% UK tax rate  No UK tax payable over med

  8. Slide 8: Greater Stella Area development… next major value step

    54.67% Working Greater Stella Area development… next major value step Interest PHASE 1 INFRASTRUCTURE  >30MMboe net 2P* reserves – delivering ~16kboe/d forecast net initial annualised production  High value development solution  Operated infrastructure – flexibility to optimise production  Signi

  9. Slide 9: Development drilling campaign

    Development drilling campaign  Development drilling campaign commenced mid June 2013 using ENSCO 100 jack-up rig  (Transocean subsidiary) - manage drilling and completion operations under ‘turnkey’ contract arrangements  Four initial Stella wells to be drilled for start-up of production  Three h

  10. Slide 10: Stella “A1” well… results materially de-risk overall development

    Stella “A1” well… results materially de-risk overall development   High quality Stella Andrew reservoir  1312ft of net pay (53%) in 2499ft horizontal reservoir section  Reservoir properties in line with previous wells on field #4   Strong well test rates – production de-risking  10.8kboe/d ma

  11. Slide 11: Subsea infrastructure installation operations

    Subsea infrastructure installation operations  - integrated Engineering, Procurement, Installation and Construction (EPIC) contract  Main installation works completed  Infield subsea structures  60km gas export pipeline - installed / trenched  Infield flowline trenching  Excellent weather cond

  12. Slide 12: FPF-1 modification yard works on-going

    FPF-1 modification yard works on-going  - Petrofac completing FPF-1 modification works under a lump-sum contract  Greater Stella Area field interest underpins performance incentives  Vessel in Remontowa shipyard in Gdansk (Poland), ~10 days towing time from field  Key modification work programme

  13. Slide 13: Near term newsflow

    Near term newsflow Financial Results Q1-2013 Results AGM Q2-2013 Results Q3-2013 13 May 2013 27 June 2013 13 August 2013 11 November 2013 - Ithaca Only - - Ithaca & Valiant Consolidated - Greater Stella Area Spud Well #1 Well #1 Spud Well #2 Well #2 Spud Well #3 Flow Test Flow Test Development Activ