Bird Construction Inc. · TSX:BDT

Bird Construction — Canaccord Genuity presentation (November 2018)

31 slides from Bird Construction's conference presentation, Nov 15, 2018

  1. Slide 1: Presented by Ian Boyd, President & CEO

    presented by Ian Boyd President & Chief Executive Officer Bird Construction

  2. Slide 2: Disclaimer

    Disclaimer This presentation contains forward‐looking statements that are based on current expectations, and are subject to a number of uncertainties and risks, and actual results may differ materially. These uncertainties and risks include, but are not limited to: industry cyclicality; competition;

  3. Slide 3: Building Canada Since 1920

    Building Canada Since 1920 1920 1930 1940s 1950s 1960s 1970s 1980s 1990s 2000s 2010s H.J. Bird Bird Bird plays a Contributes Expansion Bird begins Ownership Bird plays Acquisition Acquisition establishes Construction major role to the post into foray into transition major role of Rideau of Bird, Com

  4. Slide 4: Build Bird Strategy

    Build Bird Strategy Diversification and profitable growth Efficient processes and cost structure Vision: Safe production Be a premier Canadian Customer first approach contractor Corporate social responsibility driven by passion Integrated Bird and dedication Grow our talent Drive positive engagement

  5. Slide 5: Quick Facts About Bird

    Quick Facts About Bird LNG is a catalyst for Bird that accelerates our industrial recovery Industry leader in multi-site project bundles (schools, first responder stations) Environmental projects playing a bigger part in Bird Nuclear diversification efforts gaining momentum Preferred sub on three LR

  6. Slide 6: Sector Diversification

    Sector Diversification INSTITUTIONAL COMMERCIAL INDUSTRIAL 6

  7. Slide 7: Sector Volume Diversification

    Sector Volume Diversification 26% 24% 32% 37% 34% 56% 60% 58% 56% 61% 19% 15% 29% 20% 37% 11% 8% 11% 15% 57% 18% 51% 39% 43% 33% 32% 37% 31% 29% 21% 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Industrial Commercial Institutional 7

  8. Slide 8: Diversifying the Work Program

    Diversifying the Work Program 8

  9. Slide 9: Bird Market Positioning

    Bird Market Positioning Ranked 9th in Revenue in Canada’s Construction Industry in 2017 According to On-Site Magazine 9

  10. Slide 10: Diversification Within Sectors

    Diversification Within Sectors CONSTRUCTION EQUITY & FINANCING TRANSPORTATION MINING HYDROELECTRIC 10

  11. Slide 11: Diversification Within Sectors

    Diversification Within Sectors INDUSTRIAL PROCESS NUCLEAR MODULARIZATION ENVIRONMENTAL–WATER/WASTEWATER 11

  12. Slide 12: Shanghai Production Facility Shipped to North America

    SHANGHAI PRODUCTION FACILITY SHIPPED TO NORTH AMERICA TRANSPORTED & ASSEMBLED COMPLETE WITH FURNITURE & FIXTURES 12

  13. Slide 13: Geographic Diversification

    Geographic Diversification 13

  14. Slide 14: 2018 Status of Major Pursuits

    2018 Status of Major Pursuits CRD RESIDUALS ONTARIO CNL NUCLEAR LNG CEDAR TREATMENT FACILITY PROVINCIAL POLICE RESEARCH CENTRE VALLEY LODGE Preferred Contracted Contracted Proponent Awarded CONFED. PH 2 HURONTARIO DARLINGTON MONCTON HALIFAX & TRILLIUM LRT WTP RCMP COMPOST 14

  15. Slide 15: Backlog

    Backlog in millions of canadian dollars Greater than $0.5B in awarded projects could be added to Backlog in next 12 months Backlog and Book‐to‐Bill are non‐GAAP measures Book‐to‐Bill % (Qtr) = (Net change in Backlog Q‐t‐Q + Revenue in Quarter) / Revenue in Quarter 15

  16. Slide 16: The EBITDA Story – Why Invest in Bird?

    The EBITDA Story in millions of canadian dollars – Why Invest in Bird? EBITDA drivers 2019 and beyond: • Greater than $500M of awards that could be added to Backlog in the next 12 months • Early mobilization on LNG site – Well‐positioned for future work • Industrial program expanded to seven provinc

  17. Slide 17: Financial Summary

    Financial Summary in Canadian Dollars Share price at Close November 13, 2018 $6.73 52 Week High $10.40 52 Week Low $6.30 Shares Outstanding 42.52 million Market Capitalization $286.14 million 2018 Q3 Dividend Declared per Share, Annualized $0.39 Dividend Yield* 5.79% * Dividend Yield = 2018 Q3 Divid

  18. Slide 18: Construction Industry Outlook

    Construction Industry Outlook Institutional  $186B Infrastructure spending by Federal Government in the 11 years (2017-2028)  2018 Federal Budget has reprofiled the spend years of ~$1.75B, pushing out (Public transit, Green, Rural Communities) from the next 3 years (2018-2020) to 2022 and beyond 

  19. Slide 19: Construction Industry Outlook continued

    Construction Industry Outlook continued MRO/ LNG Canada Awarded four Sustaining Kitimat projects Capital FID Well- Spending recently positioned for Increasing announced future Increased Iron Ore Activity Increasing Pump/ Gold & Lithium Compressor Stn. Active & Healthy Increasing 19

  20. Slide 20: Thank You

    THANK YOU

  21. Slide 21: Appendix – Project Profiles

    Appendix – Project Profiles 21

  22. Slide 22: Shell Scotford Hard Services Contract

    Shell Scotford Hard Services Contract A multi-year contract for maintenance services at Shell’s Scotford Site north of Fort McMurray includes HVAC services, security equipment, electrical systems and mechanical work. 22

  23. Slide 23: Fort Hills Pilings & Foundations

    Fort Hills Pilings & Foundations $182M 2,957 driven steel piles 686 screw piles 39,000 m3 of cast in place concrete 23

  24. Slide 24: MCR Office Complex & Storage Facility

    MCR Office Complex & Storage Facility $65M 12,000 m2 Bruce Power Kincardine, Ontario 24

  25. Slide 25: Stanton Territorial Hospital

    Stanton Territorial Hospital $255M 27,270 m2 Government of Northwest Territories Yellowknife, Northwest Territories 25

  26. Slide 26: Moncton Downtown Centre

    Moncton Downtown Centre $92M 23,000 m2 City of Moncton 26

  27. Slide 27: Whitby Rail Maintenance Facility

    Whitby Rail Maintenance Facility $465M 46,450 m2 Infrastructure Ontario & Metrolinx Whitby, Ontario 27

  28. Slide 28: Saskatchewan Joint Use Schools

    Saskatchewan Joint Use Schools $385M 18 Schools on 9 Joint-Use Sites Government of Saskatchewan 28

  29. Slide 29: IKEA

    IKEA $63M 30,500 m2 IKEA Canada Dartmouth, Nova Scotia 29

  30. Slide 30: Paul's Peak Waste Rock Project

    Paul’s Peak Waste Rock Project $100M ArcelorMittal Mines Canada Mont-Wright, Quebec 30

  31. Slide 31: Hydroelectric Generating Stations

    Hydroelectric Generating Stations Lower Churchill Muskrat Falls Generating Station $115M Muskrat Falls, Labrador Wuskwatim Generating Station $400M Thompson, MB 31