Slide 1: Producing Silver Concentrates In Arizona
Silver Bullet Mines Corp. Producing Silver Concentrates In Arizona • Unique & De-Risked • High Grade Silver Development • Designed & Built 125 tpd Mill for Immediate Revenue Opportunities • Future Development Plans To Be Funded Through Revenue • 100% Ownership of Mining Equipment Corporate Presentat
Slide 2: Cautionary Statements
Cautionary Statements This presentation includes certain statements that may be deemed “forward-looking statements.” All statements in this discussion, other than statements of historical facts, which address future production, reserve potential, exploration activities and events or developments tha
Slide 3: Why Silver Bullet Mines?
Why Silver Bullet Mines? Revenue generation to be reported this quarter. Combined Revenue Generation for Both Idaho & Arizona Projects Planned for 2025/2026. Idaho, Washington Mine: Stockpiled Ore Ready for Processing. Idaho June 2025 Presentation at SBMI Website. 3 silverbulletmines.com TSXV: SBMI
Slide 4: Arizona
ARIZONA • Arizona & Nevada are the best mining Black Diamond Property jurisdictions in the world. Globe region has prolific major mining. 4
Slide 5: Super Champ Mine Project
Super Champ Mine Project Accelerated Development and Low Risk: The project is fully permitted, with the vein delineated over 1500 feet. Super Champ Mine Project Highlights Mining the vein. Over 6 feet wide. • The Super Champ project is fully permitted and is in full compliance with all regulatory au
Slide 6: Super Champ Mine Project
Super Champ Mine Project Commercial Production of High Grade Silver View of Super Champ from north end • Super Champ covers approximately 20 acres (8 ha) and is proximal to Mill-Site. • Signed an open purchase agreement for the sale of SBMI’s gold and silver concentrate until December 31, 2026. • In
Slide 7: Super Champ Mine Project
Super Champ Mine Project Commercial Production of High-Grade Silver Has Begun Samples from Super Champ. Table view of Super Champ material • Silver Discovery Fuels Production Strategy: Uncovered high-grade silver grading 405 oz/ton at Super Champ Mine (Jan 2025 sample) – one of the richest silver fi
Slide 8: Super Champ Mine Project
Super Champ Mine Project Timbering in the lower adit at the Super Champ. The Super Champ Advantage • Elite Grades Support Mining Strategy. • Super Champ Material Milled Daily. • Growth Ready & Scalable Production. • Low-Risk Upside : Offtake Agreement, Existing Infrastructure & 100% Owned Equipment
Slide 9: Super Champ Mine Project
Super Champ Mine Project Silver Silver concentrate High-grade silver float Latest addition to the fleet Mill running and producing silver We have encountered chunks of high- We own 100% of our equipment, this concentrate. Note the band is getting grade silver float parallel to and above allow us to
Slide 10: Silver Bullet Mines Acquires KT Mine
Silver Bullet Mines Acquires KT Mine Line of gold from the King Tut • Strategic Acquisition – Past-producing, high- grade gold mine in Arizona acquired for minimal cash; no shares issued, no royalties, and no finder’s fees. • Insider Expertise – VP Mining Ron Murphy and Mill Manager Dan Murphy mined
Slide 11: KT Mine Project
KT Mine Project Recent Developments at KT Mine Pan results from ball mill feed conveyor October 2,2025 • Confirmed high-grade gold concentrate results of 23.6 oz/ton gold from the bulk sample processing. • Completed safety improvements in the existing adit, including timbering, ventilation, and blas
Slide 12: KT Mine Project
KT Mine Project Timbering at the KT Adit Gold concentrate Visible gold in blasted material Efforts were concentrated on securing Line on shaker table from KT Mine Second, significant visible gold (VG) the area and opening and timbering the material. The grade of the latest high- has been discovered
Slide 13: Millsite
Millsite 13 silverbulletmines.com TSXV: SBMI OTCQB: SBMCF
Slide 14: Millsite
Millsite • Fully functioning high efficiency gravity circuit. • Sufficient supply of water secured by means of a 400 ft well. • 100% owned plant and property. 14 silverbulletmines.com TSXV: SBMI OTCQB: SBMCF
Slide 15: Shareholder Breakdown
Capitalization Shareholder Breakdown Shares Outstanding 130,404,404 Insiders 35.60% Warrants 62,126,342 49.20% Close friends and associates Options 8,278,571 Retail Total Fully Diluted 200,809,317 15.20% 15 silverbulletmines.com TSXV: SBMI OTCQB: SBMCF
Slide 16: Management Team
Management Team John Carter | CEO and Director Mr. Carter is a mining executive with over 40 years experience in mineral processing and building mineral processing facilities. Mr. Carter directed the exploration and test mining development of the Buckeye Mine which is located on the Property. Peter
Slide 17: For information please contact
For information please contact: John Carter, CEO 1-905-302-3843 Peter M. Clausi, VP Capital Markets 1-416-890-1232 www.silverbulletmines.com Follow us on Twitter: @BulletMines Silver Bullet Mines is Unique & De-Risked. Silver Bullet Mines has researched historical mines in the prolific Globe silver,