Axel Ree Ltd. · ASX:AXL

Axel Ree — Bell Potter Unearthed Conference 2026

19 slides from Axel Ree's conference presentation, Feb 12, 2026

  1. Slide 1: Accelerating Caladão Project to Planned ISR Field Recovery Trials

    Axel REE (ASX:AXL | FSE:HN8) Investor Presentation | February 2026 Bell Potter Unearthed Conference Accelerating Caladão Project to Planned ISR Field Recovery Trials

  2. Slide 2: Disclaimer

    Disclaimer These presentation materials and any accompanying verbal presentation (together, the Presentation Materials) have omissions from, this document including, without limitation, any financial information, any estimates or projections and been prepared by Axel REE Limited (Company) as 11 Febr

  3. Slide 3: Chinese Rare Earth ISL Operation 'The Global Standard'

    Chinese Rare Earth ISL Operation ‘The Global Standard’ In Situ Leaching since 1997 China began using Magnesium Sulphate as a leaching agent (Epsom Salts) in 2010. ISL-Approximately 70% of the global mine production in China. ISL is a LOW COST and world proven process ISL is Low CAPEX, low OPEX vs. o

  4. Slide 4: Caladão Project, MRE Areas and Key Deposits

    Caladão Project, MRE Areas and Key Deposits The combined Area A + B MRE now stands at 572 Mt @ 1,506 ppm TREO and 439 Mt @ 38 ppm Ga, covering ~151 km² (~35% of the Caladão Project area). Two main areas identified for ISR mining: Paraíso ISR Area B Prospect 339Mt@1,075ppm TREO and 36ppm Ga Woolrich

  5. Slide 5: Paraíso Target - 9 Wellfields Planned

    Paraíso Target -9 Wellfields Planned Soluble TREO Grade-thickness Hole ID Interval (m) (ppm) From (m) To (m) (gram-metre) CLD-AUG-028 8.00 1,046 12.00 20.00 8,372 CLD-DDH-028 22.15 619 28.00 50.15 13,705 CLD-DDH-003 19.32 662 27.00 46.32 12,476 CLD-DDH-018 20.00 600 19.00 39.00 12,006 CLD-AUG-073 12

  6. Slide 6: Caladão – The Right Fit for ISR

    Caladão – The Right Fit for ISR Resource Profile & Geology – Made for ISR, similar to Chinese ISR mines • Coarse weathered granites = excellent permeability • Gravity works in our favour (leaching from hilltops) • Granite basement – ideal controlled floor for solution flow Schematic diagram of the i

  7. Slide 7: Strategic Roadmap: "Pod" Implementation Model

    Strategic Roadmap: “Pod” Implementation Model1 2029 Steady State Pods 2028 2027 Ramp Up Pod 0.5-1.5kt REO/yr per pod benchmark1 2026 Pilot Pod 300-600t REO/yr benchmark1 • Deploy multiple Field Trials independent pods 100-300t REO/yr benchmark1 • Optimise injection-to- recovery ratios • Stable produ

  8. Slide 8: Asset Portfolio & Regional Scalability

    Asset Portfolio & Regional Scalability Potential to scale via Interconnected Hubs in the Woolrich district • Woolrich (Anchor Asset): 2,000 Ha mineralised footprint with potential for 12 individual wellfields identified • Paraíso Prospect: 1,000 Ha area with 9 potential wellfields identified via exp

  9. Slide 9: Gerik ISR Mine Vs Axel's Woolrich & Paraíso Targets

    Gerik ISR Mine Vs Axels’ Woolrich & Paraíso Targets Company - Resourc CAPEX SOLUBLE MREO/ NdPr/ DyTb/ Gerik ISR Mine - Malaysia Comparison Project e Size US$M TREO TREO % TREO % TREO % ppm Axel REE – Paraíso - 537 41.00 39.00 2.0 • Malaysia’s first profitable ionic clay ISR mine Prospect operation,

  10. Slide 10: Proven Recoveries, now confirming Chemistry & Testing Economics

    Proven Recoveries, now confirming Economics based on real Chemistry & Testing Economics production data AXL Trial Mining Characteristics vs PFS/DFS Saves time 6–12 months vs 18–30 months for PFS/DFS. Real ore performance Saves costs ~A$2 m vs ~A$10–20m traditional route Measures actual reagent use R

  11. Slide 11: Unique Gallium Opportunity

    Unique Gallium Opportunity Gallium Spot price $2,101.60 per kg (03/02/2026)1 Gallium is a globally critical technology metal 98% of global supply controlled by China → export bans in 2024. AXL hosts Brazil’s only defined primary gallium resource & one of the largest resources globally Integral to De

  12. Slide 12: Valuation disconnect vs Brazilian REE peers

    Valuation disconnect vs Brazilian REE peers ASX Brazilian REE Peers – EV/Contained REE ($/kt) +$1.0Bn 600x 3,000 EV/kt TREO (x) 500x 2,500 • Trading as early-stage explorer 400x 2,000 TREO (ppm) • Fully funded to generate EV/TREO ($/kt) feasibility-level ISR data 300x 1,500 • Valuation does not refl

  13. Slide 13: Clear Value Milestones

    Clear Value Milestones Accelerated pathway to production and company re-rating Area B MRE – Increase Global MRE to 572Mt REE and 439Mt Ga Area B – Woolrich Deposit: Pilot ISR wellfield trials, modular plant, offtake, Ge21 Consultoria permitting Ionic clays confirmed at Caladão Project Metallurgy and

  14. Slide 14: Corporate Snapshot

    Corporate Snapshot Low EV, strong cash balance Board Capital Structure Paul Dickson ASX Code AXL Non-Executive Chairman • More than 30 years’ experience in the finance services industry Share Price (market close $0.091 • Currently Non-Executive Chairman of Alligator Energy Limited (ASX:AGE) and Non-

  15. Slide 15: Accelerating Caladão Project – Field Recovery Trials

    Accelerating Caladão Project – Field Recovery Trials For more information, please contact: Axel REE Limited (ASX:AXL | FSE:HN8) Investor Relations Paul Dickson Julia Maguire Chairman The Capital Network pd@axelreelimited.com.au julia@thecapitalnetwork.com.au www.axelreelimited.com.au

  16. Slide 16: Appendix A

    Appendix A References to previous announcements AXL ASX release 2 February 2026 “Paraiso Deposit Further Validates REE In Situ Leach Pathway” AXL ASX release 27 January 2026 “Gallium Recovery Doubled, Breakthrough Scandium Co-Recovery” AXL ASX release 23 December 2025 “Axel MRE Delivers 145% REE Gro

  17. Slide 17: Appendix B – Pod Implementation Model References

    Appendix B – Pod Implementation Model References China ISR benchmark sources (Slide 7) Xu, Z. (2014). The Research in Development and Strategy of Rare Earth Industry in Jiangxi Province. In: International Conference on Logistics Engineering, Management and Computer Science (LEMCS 2014). Atlantis Pre

  18. Slide 18: Appendix C – Source Data for Peer Comparisons

    Appendix C – Source Data for Peer Comparisons Resource TREO Company Project Classification Mt (ppm) Stage) Source Brazilian Critical Indicated 248 759 ASX Announcement 21 February 2025. Updated Mineral Resource Minerals Limited Ema Inferred 695 701 Scoping Study for Ema 97% Increase of indicated ton

  19. Slide 19: Appendix D – Mineral Resource Estimates

    Appendix D – Mineral Resource Estimates REE Mineral Resource Estimate Average Grade Dy2O3+ Nd2O3+ JORC Tonnes TREO1 MREO Tb4O7 Pr2O3 Project Category (Mt) (ppm) (ppm) (ppm) (ppm) Caladão Project – Area A Inferred 233.0 2,143.3 463 23 440 Caladão Project – Area B Inferred 339.0 1,075 205 11 194 Maram

Axel Ree — Bell Potter Unearthed Conference 2026 on 6ix