Pure Gold Mining — Investor Presentation (January 2022)
25 slides from Pure Gold Mining's investor presentation, Jan 4, 2022
Slide 1: Welcome to the Heart of Red Lake
Welcome to the Heart of Red Lake High-Grade Gold in the Heart of Red Lake
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS This Presentation contains forward‐looking statements, including but not limited to statements Alternative performance measures are furnished to provide additional information. These non- Neither this presentation nor any copy hereof may be distributed in any other jurisdi
Slide 3: Our Vision
Our Vision To build a highly profitable, multi-generational, growth company In the world-class gold mining district of Red Lake, Ontario. 3
Slide 4: Red Lake is our sole focus, our home
Red Lake is our sole focus, our home. We are committed to mining sustainably. Inaugural Sustainability Report to Strong local relationships and Small surface footprint be released in 2022 Landmark First Nations Agreement Plan to transition mobile equipment New water treatment Long-term tailings plan
Slide 5: Welcome to the Heart of Red Lake. Canada's High-Grade Gold District
Welcome to the Heart of Red Lake. Canada’s High-Grade Gold District
Slide 6: Revitalized Executive Management, Deep Operational Experience
REVITALIZED EXECUTIVE MANAGEMENT DEEP OPERATIONAL EXPERIENCE Troy Fierro Maryse Bélanger President, CEO & Director Mine General Manager & Director • Mining Engineer • +35 years’ experience • +35 years’ experience • Formerly Atlantic Gold (President & COO), Mirabela • Formerly Fronteer Gold (COO), VP
Slide 7: The PureGold Mine
The PureGold Mine The next chapter in Red Lake history.
Slide 8: Our Growth Plan: Phased Organic Development Strategy
OUR GROWTH PLAN PHASED ORGANIC DEVELOPMENT STRATEGY Dream Phase 3 Big. ✓ Expansion Phase 2 Target: +150 koz/yr Game-Changing Optimization +1,000 tpd Phase 1 Exploration Potential Feasibility Study Target: +100 koz/yr • Expand current mine and mill 800-1000 tpd • Extend known zones vertically • Along
Slide 9: Great gold mines aren't found. They're built.
Great gold mines aren’t found. They’re built. 9
Slide 10: The PureGold Mine Status Update After First Year of Operation
THE PUREGOLD MINE STATUS UPDATE AFTER FIRST YEAR OF OPERATION STATUS UPDATE – JANUARY 2022 ✓ Fully built mine site with over 300 employees ✓ Mined grades reconciling well with Mineral Reserves ✓ 800 tpd mill achieving +95% recoveries ✓ Demonstrated capacity of mill to sustain 1,000 tpd Expanded Mill
Slide 11: Operational Improvement Initiatives Underway
OPERATIONAL IMPROVEMENT INITIATIVES UNDERWAY UNLOCKING PUREGOLD’S FULL POTENTIAL OPERATIONAL IMPROVEMENT INITIATIVES TARGET INITIATIVE IMPACT TIMING OUTCOMES • More efficient critical data management, faster ✓ Sustainably • Reorganization of workflow and accountability Started in Q4 2021 assay turna
Slide 12: Q4 2021 Production Results
Q4 2021 PRODUCTION RESULTS EARLY SIGNS OF PROGRESS EVIDENT October November December TIMELINE – Q4 2021 2021 2021 2021 October • Production hits low point Tonnes Processed (t) 11,991 18,613 20,525 November • Site Leadership changed; several operational improvement initiatives introduced Average Dail
Slide 13: Path to Steady State
PATH TO STEADY STATE 2022 TO BE A PIVOTAL YEAR FOR PUREGOLD EXPECTED CHANGE IN KEY METRIC 2022 vs. 2021 Ramping up Throughput to 1,000 tpd Ramping Up Trending toward 100% high grade to Full Grades feed, plus grades increase with depth Capacity Flat to down (even as Operating Costs throughput increas
Slide 14: Red Lake is home to some of the richest gold deposits in the world
Red Lake is home to some of the richest gold deposits in the world. At PureGold, we’ve barely scratched the surface. 14
Slide 15: Red Lake Systems Have Deep Roots
RED LAKE SYSTEMS HAVE DEEP ROOTS WE’VE GOT 3000 METRES AND 100 YEARS TO GO 1200 2.1 Moz M&I 1 metre 0.5 Moz Inferred 1 depth 2.5 Moz past production 8 Zone (1) Mineral Resources are inclusive of Mineral Reserves; see Page titled ‘Mineral Reserves & Resources’ for full report tables 15
Slide 16: Red Lake Systems Have Deep Roots
RED LAKE SYSTEMS HAVE DEEP ROOTS WE’VE GOT 3000 METRES AND 100 YEARS TO GO 1200 2.1 Moz M&I 1 metre 0.5 Moz Inferred 1 depth 2.5 Moz past production 1995 8 Zone HGZ Discovery AD-11-01 14.3 g/t Au / 2.0m Evolution’s current mine plan to ~3000 m depth Note: Conceptual mineralization shapes indicated a
Slide 17: The Goldcorp Story
THE GOLDCORP STORY CREATION OF A GLOBAL MINING TITAN HIGH GRADE ZONE DISCOVERY RED LAKE MINE PRODUCTION HISTORY • In 1995, Goldcorp’s Dickenson Mine produced 9.5 Moz Au ~50,000 oz; reserves were dwindling and profit at +25 g/t margins low produced since 800 2001 1 • Nine holes were drilled to test f
Slide 18: High Grade 8-Zone: Our Potential Game Changer
HIGH GRADE 8-ZONE OUR POTENTIAL GAME CHANGER Goldcorp PureGold East Ramp HGZ Discovery 8-Zone Current Approx. (1995) Main Ramp Depth: 420m • Quartz veins in • Quartz veins in Geologic flexure along flexure along Setting mafic-ultramafic mafic-ultramafic contact contact • 4.3m at 466 g/t Au Key Drill
Slide 19: Near-Term Outlook: Key Upcoming Catalysts
NEAR-TERM OUTLOOK KEY UPCOMING CATALYSTS 2022 H1 2022 H2 2022 • PureGold Mine to generate positive cash flow • Publish inaugural Sustainability Report • Cost optimization initiatives to continue • Sustain production at 1,000 tpd • Tonnage and grades to continue ramping up • Continue underground dril
Slide 20: Our growth story has only just begun
Our growth story has only Just Begun.
Slide 21: You're in Good Company
YOU’RE IN GOOD COMPANY OUR KEY STRATEGIC SHAREHOLDERS Eric Sprott #3 Gold Producer in World $30 Million Investment Cornerstone Investor 21
Slide 22: PureGold Mining Inc Corporate Snapshot
PUREGOLD MINING INC CORPORATE SNAPSHOT ANALYST COVERAGE CAPITAL STRUCTURE 1 Basic Shares Outstanding 435.6 million Warrants 32.4M at $0.85, July 18, 2022 expiry 43.3 million 11.0M at $1.36, March 28, 2023 expiry ITM Options Outstanding 11.8 million Fully Diluted ITM Shares Outstanding 481.9 million
Slide 23: PureGold Leadership Team
PUREGOLD LEADERSHIP TEAM A CULTURE OF OPERATIONAL EXCELLENCE Board of Directors Executive Management PureGold Mine Site • Graeme Currie, Chairman • Troy Fierro, President & CEO • Maryse Bélanger, Mine General Manager • Mark O’Dea, Director • Chris Haubrich, VP Business Development & CFO • David Towl
Slide 24: Mineral Resources & Reserves
MINERAL RESOURCES & RESERVES PUREGOLD MINE MINERAL RESOURCES 1 Indicated Inferred Grade Contained Grade Contained Deposit Tonnes (kt) Deposit Tonnes (kt) (g/t Au) (koz Au) (g/t Au) (koz Au) Madsen 6,429 9.0 1,857 Madsen 889 8.4 241 Fork 203 6.6 43 Fork 331 5.8 61 Russet South 241 7.2 56 Russet South
Slide 25: Thank you.
Thank you. Corporate Inquiries Corporate Address TSX.V:PGM , LSE:PUR Chris Haubrich 1900 – 1055 West Hastings Street VP Business Development & CFO Vancouver, BC OTCMKTS:LRTNF V6E 2E9 www.puregoldmining.ca 604 646 8000 info@puregoldmining.ca
PureGold Mining — Investor Presentation (January 2022) on 6ix