Image Resources Nl · ASX:IMA

Image Resources Nl — Investor Presentation (March 2018)

61 slides from Image Resources Nl's investor presentation, Mar 12, 2018

  1. Slide 1: Equity Raising Investor Presentation

    1 For personal use only EQUITY RAISING INVESTOR PRESENTATION MARCH 2018 ASX: IMA Image Resources NL ABN: 57 063 977 579 Ground Floor, 23 Ventnor Ave West Perth, WA 6005 www.imageres.com.au

  2. Slide 2: Disclaimer

    Disclaimer 2 For personal use only IMPORTANT INFORMATION This presentation has been prepared by the management of Image Resources NL ("Image”, “IMA“ or the ‘Company’) in connection with meetings with investors and potential investors and not as specific advice to any particular party or person. The

  3. Slide 3: Forward Looking Statements (continued)

    Disclaimer 3 For personal use only FORWARD LOOKING STATEMENTS (continued) Statements in this investor presentation that constitute forward-looking statements or information include, but are not limited to statements regarding the Boonanarring/Atlas Project: Production, Cashflows, NPV, IRR, construct

  4. Slide 4: Disclaimer

    Disclaimer 4 For personal use only This investor presentation also contains references to estimates of mineral resources and ore reserves. The estimation of mineral resources is inherently uncertain and involves subjective judgments about many relevant factors. Mineral resources that are not ore res

  5. Slide 5: Disclaimer - Liability

    Disclaimer 5 For personal use only LIABILITY Euroz Limited ("Lead Manager”) nor any of its respective related bodies corporate, shareholders or affiliates or any of its respective officers, directors, employees, affiliates, agents and advisers (each, a “Limited Party”) have authorised, permitted or

  6. Slide 6: Executive Summary

    Executive Summary 6 For personal use only Image to be fully funded through construction and ramp-up at Boonanarring Ø Overall funding package of A$75 million means Image will be fully funded to complete development of its 100%-owned Boonanarring Mineral Sands Project (“Boonanarring”) Ø Image to comm

  7. Slide 7: Executive Summary - Equity Funding

    Executive Summary 7 For personal use only Equity Funding underway Ø Placement of Image shares to sophisticated and professional investors to raise A$25 million (“Placement”); Ø Placement fully underwritten by Vestpro International Limited (“Vestpro”) and Million Up Limited (“Million Up”) through ind

  8. Slide 8: Placement Overview

    Placement Overview 8 For personal use only Ø Placement of 250 million new fully paid ordinary shares to institutional and Offer sophisticated investors to raise $25m (before costs) pursuant to shareholder approval provided to Image at the General Meeting held on 13 February 2018. Ø The Offer Price o

  9. Slide 9: Shares on Issue

    Shares on Issue 9 For personal use only Post Equity Raising & Issue of Commitment Shares Ø Current shares on issue: 611,289,987 Ø Equity Raising shares to issue: 250,000,000 Shares on issue post Equity Raising: 861,289,987 Ø Commitment Shares1 to issue: 91,453,459 Shares on issue post issue of Commi

  10. Slide 10: Debt Funding – Key terms

    Debt Funding – Key terms 10 For personal use only A$50M1 Debt Facility with Pala & Castlelake2 Term: 3 years single tranche drawdown Interest Rate: 13-14% CPs to Drawdown: Customary CPs (includes raising A$25M in equity) Security: Senior Secured Repayments: No repayments for 15 months (interest capi

  11. Slide 11: Debt Funding – Fees and Covenants

    Debt Funding – Fees and Covenants 11 For personal use only A$50M1 Debt Facility with Pala & Castlelake2 Fees: Arrangement Fee of 2% and Issuer discount of 7% Other Consideration: 56.255M Image shares and 35M 5-Year Warrants @ 115% premium Covenants: Customary positive, negative & financial covenants

  12. Slide 12: Corporate Snapshot

    Corporate ImageSnapshot Corporate Snapshot 12 For personal use only Diverse and experienced Board and Management Share Code: IMA Board of Directors Share Price: A$0.105* Bob Besley – Independent Chairman 12 Month Price Range: A$0.04 – 0.17 Patrick Mutz – Managing Director Shares on Issue: 611.3m Cha

  13. Slide 13: Project Approvals

    Forward Looking ProjectStatement Approvals 13 For personal use only q PROJECT APPROVALS ü Mining Lease & General Purpose Lease ü Part IV, Environmental Protection Act (WA) – PER ü EPBC Act (Commonwealth) ü Land acquisition for processing plant siting and start of mining ü Groundwater Abstraction Lic

  14. Slide 14: Next Steps

    Corporate Next StepsSnapshot 14 For personal use only Ø Finalise equity raising; Ø Complete satisfaction of conditions precedent and drawdown loan; Ø Board to issue Decision to mine; and Ø Initiate formal construction.

  15. Slide 15: Company Description and Focus

    Forward Company Looking Description Statement and Focus 15 For personal use only Image Resources NL ASX: IMA Emerging mineral sands producer Actively focused on fast-tracking the development of its 100%-owned, high-grade and high-zircon flagship Boonanarring mineral sands project in the North Perth

  16. Slide 16: Project Location

    Forward Looking ProjectStatement Location 16 For personal use only q LOCATION Ø North Perth Basin in Western Australia Ø 80 km north of Perth CBD Ø Proven mineral sands address § Including majors Iluka and Tronox Ø Infrastructure rich § paved roads, power, gas pipeline water, telecommunications etc.

  17. Slide 17: Projects Types and Locations

    Projects Types and Locations 17 For personal use only Ø 1,000 km2 tenements portfolio Ø 100% focus on mineral sands Ø Strandline (dry open cut mining) projects Ø Dredge mining projects

  18. Slide 18: Boonanarring Project Comparison

    Boonanarring Project Comparison 18 For personal use only High HM, VHM and Zircon grades relative to peers HM grade Zircon grade VHM HM Grade (%) Zircon (%) 14.0% 25% VHM Grade Zircon % Image Resources (IMA) Boonanarring project 12.0% is 21.5Mt @ 8.3% HM r and up to 24.5% Zircon 20% h e g Hi tter! 10

  19. Slide 19: Quality Ore Reserves

    Forward Ore Reserves Looking Statement 19 For personal use only q QUALITY ORE RESERVES Ø JORC Code (2012) Compliant Ø High HM, VHM and very high zircon at Boonanarring High Grade Ore Reserves - Strand Deposits; in accordance with the JORC Code (2012) Project/Deposit Category Volume Tonnes % HM % Sli

  20. Slide 20: Ore Reserves Comparison

    Forward Ore Reserves LookingComparison Statement 20 For personal use only IMAGE Source: TZMI; May 2017

  21. Slide 21: Bankable Feasibility Study Base Assumptions

    Forward Bankable Looking Feasibility Statement Study 21 For personal use only Base Assumptions Ø Start mining at Boonanarring Ø Dry, open-cut mining Ø Production rate - 500 dry tonnes per hour • 3.7M dry tonnes per year Ø Conventional gravity separation using spirals Ø Product: Heavy Mineral Concent

  22. Slide 22: Bankable Feasibility Study Key Financial Metrics

    Forward Bankable Looking Feasibility Statement Study 22 For personal use only Key Financial Metrics Original BFS* Updated BFS** Ø Pre-Tax NPV (@ 8%) A$135M A$197M Ø Pre-Tax IRR 64% 104% Ø Payback period (months) 22 16 Ø Mine life 8+ years Ø Project capital cost A$52M • includes ~$8M for land * ASX A

  23. Slide 23: Project Capital Comparison

    Forward Project Looking Capital Statement Comparison 23 For personal use only r is w e Lo tter! Be Source: TZMI; May 2017

  24. Slide 24: Start-up Capital / Revenue Ratio

    Forward Start-up Looking Capital Statement / Revenue Ratio 24 For personal use only r is w e Lo tter! Be Source: TZMI; May 2017

  25. Slide 25: Boonanarring – Production Statistics

    Boonanarring – Production Statistics 25 For personal use only Note: 2023 information includes the start of production at Atlas.

  26. Slide 26: Boonanarring – Project EBITDA

    Boonanarring – Project EBITDA 26 For personal use only Note: 2023 information includes the start of production at Atlas.

  27. Slide 27: Commodity Prices – Actual and Projected

    Forward Looking Commodity PricesStatement – Actual and Projected 27 For personal use only

  28. Slide 28: Commodity Prices – Actual and Projected

    Forward Looking Commodity PricesStatement – Actual and Projected 28 For personal use only

  29. Slide 29: Other Key Project Metrics

    Forward Bankable Looking Feasibility Statement Study 29 For personal use only Other Key Project Metrics Ø Binding offtake contract for heavy mineral concentrate (HMC) • 100% of HMC production for life of project • Market-based pricing model • Full credit for TiO2 products • No minimum product specif

  30. Slide 30: Plant and Equipment (select examples)

    Plant and Equipment (select examples) 30 For personal use only Wet Concentration Plant Mineral Separation Plant (Option) Slurry Booster Stations & pipelines Power poles, wires & transformers HMC Stackers Mine Slurry Unit Plus much, much more.

  31. Slide 31: Image Wet Concentration Plant

    Forward Image Wet Looking Concentration Statement Plant 31 For personal use only

  32. Slide 32: Early Works – Wet Concentrator Plant 3D Modelling

    Early Works Wet Concentrator Plant 3D Modelling For personal use only Looking North

  33. Slide 33: Early Works – Wet Concentrator Plant 3D Modelling

    Early Works Wet Concentrator Plant 3D Modelling For personal use only Looking South

  34. Slide 34: Upside Potential

    Forward Upside Looking Potential Statement 34 For personal use only Upside potential at and near Boonanarring Ø Confirmed potential to extend mine life with high grade mineralisation (ASX announcement 13 March & 26 June 2017); • Assuming mineralisation in extension area is identical to known Ore Res

  35. Slide 35: Boonanarring Deposit Extensions

    Boonanarring Deposit Extensions 35 For personal use only ASX - 13 March & 26 June 2017 New Drilling Results (Feb 2017) Ø Confirm 5.6km northern extension of Boonanarring mineralisation Ø Outstanding high grade intersections: § 8m @ 23.8% HM in IX00245 § 8m @ 21.1% HM in IX00244 and § 8m @ 16.3% HM i

  36. Slide 36: Potential Royalty from Tronox

    Potential Royalty from Tronox 36 For personal use only Royalty agreement in place as of Ø A$50,000 cash received Ø Sliding-scale royalty on production Avg. HM Grade Royalty 2.5% 1.25% 3.0% 2.50% 3.5% 3.75% 4.0% 5.00% Ø Potential for future arrangements with Tronox or others based on large area of po

  37. Slide 37: Project Development Schedule

    Project Development Schedule 37 For personal use only Targeting first production October 2018

  38. Slide 38: Euroz Securities Limited Research

    Corporate Snapshot Euroz Securities Limited Research 38 For personal use only

  39. Slide 39: Patersons Securities Limited Research

    Corporate PatersonsSnapshot Securities Limited 39 Research For personal use only

  40. Slide 40: Contact

    Contact For further information 40 For personal use only Patrick Mutz Managing Director Image Resources NL info@imageres.com.au Office: +61 8 9485 2410 Ground Floor, 23 Ventnor Avenue West Perth, WA 6005 PO Box 469, West Perth, WA 6872 www.imageres.com.au

  41. Slide 41: Appendix

    Forward Looking Statement 41 For personal use only APPENDIX

  42. Slide 42: Compliance Statement

    Compliance Forward Looking Statements Statement 42 For personal use only COMPLIANCE STATEMENT FOR EXPLORATION Information in this presentation that relates to Exploration Results is based on information compiled by George Sakalidis BSc (Hons) who is a member of the Australasian Institute of Mining a

  43. Slide 43: Mineral Resources – Strand Deposits 1 of 2

    Mineral Forward Resources Looking Statement – Strand Deposits 43 For personal use only Strand Deposits 1 of 2 High Grade Mineral Resources - Strand Deposits; in accordance with the JORC Code (2012) @ 2.0% HM Cut-off Project/Deposit Category Volume Tonnes % HM % Slimes HM Tonnes VHM Ilmenite Leucoxen

  44. Slide 44: Mineral Resources – Strand Deposits 2 of 2

    Mineral Forward Resources Looking Statement – Strand Deposits 44 For personal use only Strand Deposits 2 of 2 Previously Reported Mineral Resources - Strand Deposits; in accordance with JORC Code (2004) @ 2.5% HM Cut-off Project/Deposit Category Volume Tonnes % HM % Slimes HM Tonnes VHM Ilmenite Leu

  45. Slide 45: Mineral Resources – Dredge Deposits

    Mineral ForwardResources Looking Statement – Dredge Deposits 45 For personal use only Dredge Deposits 1 of 1 Previously Reported Mineral Resources - Dredge deposits; in accordance with JORC Code (2004) @ 1.0% HM Cut-off Project/Deposit Category Volume Tonnes % HM % Slimes HM Tonnes VHM Ilmenite Leuc

  46. Slide 46: Compliance Statement for Mineral Resources

    Forward Looking Compliance Statement Statements 46 For personal use only COMPLIANCE STATEMENT FOR MINERAL RESOURCES 1. COMPLIANCE STATEMENT Boonanarring/Atlas Mineral Resources The information in this presentation that relates to the estimation of Mineral Resources is based on information compiled b

  47. Slide 47: Key Risks

    Key Risks 47 For personal use only An investment in Image Resources NL (IMA) should be considered speculative due to the nature of the business and its early stage of development. Investments in mineral exploration and development issuers, such as IMA, involve a significant degree of risk. The devel

  48. Slide 48: Key Risks (continued)

    Key Risks (continued) 48 For personal use only 2. Uncertainty in the Estimation of Mineral Resources and Ore Reserves Estimating the quantity and quality of Mineral Resources and Ore Reserves is an inherently uncertain process and the Minerals Resources and Ore Reserves stated are estimates, and may

  49. Slide 49: Key Risks (continued)

    Key Risks (continued) 49 For personal use only 6. Licenses and Permits IMA will require certain licenses, permits and approvals to develop the Boonanarring Project, and subsequently other projects. IMA has obtained the key permits and approvals required for the Boonanarring Project, however has not

  50. Slide 50: Key Risks (continued)

    Key Risks (continued) 50 For personal use only IMA is also currently in advanced negotiations to secure access to land required for the development of the Boonanarring Project. There is no guarantee that IMA will be able to successfully conclude these negotiations in a timely manner, within the time

  51. Slide 51: Key Risks (continued)

    Key Risks (continued) 51 For personal use only These risks, conditions and events could result in: (i) damage to, or destruction of, the value of, the Boonanarring Project or the facilities; (ii) personal injury or death; (iii) environmental damage to the Boonanarring Project or the properties of ot

  52. Slide 52: Key Risks (continued)

    Key Risks (continued) 52 For personal use only 13. Regulatory Risks The Company’s operations and exploration activities are subject to laws and regulations governing various matters. These include laws and regulations relating to repatriation of capital and exchange controls, taxation, labour standa

  53. Slide 53: International Offer Restrictions

    International Offer Restrictions 53 For personal use only

  54. Slide 54: Boonanarring/Atlas – Production Statistics

    Boonanarring/Atlas – Production Statistics 54 For personal use only Project Production Statistics 2018 2019 2020 2021 2022 2023 2024 2025 2026 Mined Ore Tonnes (HG) 621,252 3,682,767 3,696,124 3,724,085 3,765,642 2,659,650 3,359,563 3,358,792 1,601,766 HM Grades 8.6% 7.8% 11.2% 5.6% 7.8% 10.9% 9.4%

  55. Slide 55: Boonanarring/Atlas – Project EBITDA

    Boonanarring/Atlas – Project EBITDA 55 For personal use only 2018 2019 2020 2021 2022 2023 2024 2025 2026 Project EBITDA $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 Revenue 8,881 132,631 186,878 97,152 127,191 77,435 79,816 64,395 58,131 Operational Expenditure Mining (22,419) (43,831) (40

  56. Slide 56: Bankable Feasibility Study Updated – Sensitivity Analysis

    Bankable Feasibility Forward Looking Study - Updated Statement 56 For personal use only Sensitivity Analysis

  57. Slide 57: Project Capital Breakdown

    Project ForwardCapital LookingBreakdown Statement 57 For personal use only Process Plant & Ancillary Costs Ø Indirects (A$0.7M) include sundry mob./demob.; BFS Capital A$M insurance, capital spares, survey/geotech. Indirects 0.7 Ø Direct capital costs (A$22.4M): • Plant transport, refurb and install

  58. Slide 58: Commodity Prices – Actual and Projected

    Forward Looking Commodity PricesStatement – Actual and Projected 58 For personal use only

  59. Slide 59: Commodity Prices – Actual and Projected

    Forward Looking Commodity PricesStatement – Actual and Projected 59 For personal use only

  60. Slide 60: Projects Pyramid – Strand Deposits

    Projects Forward Pyramid Looking – Strand Deposits Statement 60 Mineral Resources – Accessible by Dry Open-Cut Mining For personal use only Projects ranked by combined Zircon plus Rutile Boonanarring Focus 43.8Mt; 5.6%HM; of BFS 20.7% Zr+Ru Atlas 18.1Mt; 6.0%HM; 15.8% Zr+Ru Red Gully 6.0Mt; 7.7% HM;

  61. Slide 61: Projects Pyramid – Dredgeable

    Projects Forward Pyramid Looking - Dredgeable Statement 61 Mineral Resources – Accessible by Dredge Mining For personal use only Projects ranked by HM Grade 25-67% Leucoxene; 90+%VHM; Bidaminna <5% slimes; 45Mt; 3.0%HM; 100Mt exploration 6.5% Zr+Ru target Titan-Telesto 140Mt; 1.9%HM; 12.8% Zr+Ru Cal