10 slides from National Fuel Gas's corporate update, 2022
Slide 1: Empire Pipeline Spring 2022 NGA Presentation
Empire Pipeline Spring 2022 NGA Presentation
Slide 2: System Overview
System Overview
Slide 3: Spring 2022 Empire System Overview: Weather and Throughput Statistics
Spring 2022 Empire System Overview Weather and Throughput Statistics • Winter Operations 10/1/21-3/31/22 • Peak Day Throughput 2/14/2022 746 mmcf Total 197 mmcf Power Gen • Peak Day Degree Day 2/14/2022 50 • Average Degree Day 2021-2022 30 • Average Degree Day 2020-2021 30 • Normal Degree Day 34 • T
Construction and Maintenance Schedule EMPIRE PIPELINE 2022 Construction and Maintenance Schedule Effective Date: 2/17/22 Duration Expected Service Project Description Start Date End Date Location Impact (Days) Level Impact Phoenix Sithe Flow Backup flow controller out of service. Facility upgrades T