Stelco Holdings Inc

Stelco — Corporate Update (June 2018)

25 slides from Stelco's corporate update, Jun 20, 2018

  1. Slide 1: Hamilton Works Community Liaison Committee Meeting

    Hamilton Works Community Liaison Committee Meeting June 20 2018 Andy Sebestyen

  2. Slide 2: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 24 January 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Monitoring Requirements under O.Reg. 419/05 Site Specific Standard Order – Benzene 6. Community

  3. Slide 3: Know Your Emergency Exits

    Know Your Emergency Exits Review Evacuation Routes of the room you are located in

  4. Slide 4: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 24 January 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Monitoring Requirements under O.Reg. 419/05 Site Specific Standard Order – Benzene 6. Community

  5. Slide 5: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 24 January 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Monitoring Requirements under O.Reg. 419/05 Site Specific Standard Order – Benzene 6. Community

  6. Slide 6: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 24 January 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Monitoring Requirements under O.Reg. 419/05 Site Specific Standard Order – Benzene 6. Community

  7. Slide 7: Site-Specific Standard Order (Particulates): Performance Review – Daily

    Site-Specific Standard Order (Particulates): Performance Review – Daily Date Doors Lids Off-takes (% Leaks) (% Leaks) (% Leaks) 2015 Limits 54% 2% NA (July 2 start) 2016 Limits 32% 2% NA 2017-2019 Limits 10% 2% 5% 2020 Limits 5% 1% 4% Jan. 1 to June 10, 2018 0 – 4.23% 0 – 1.27% 0 – 5.13% Range (0.25

  8. Slide 8: Site-Specific Standard Order (Particulates): Performance Review – 30 Day Rolling Averages

    Site-Specific Standard Order (Particulates): Performance Review – 30 Day Rolling Averages Date Doors Lids Off-takes Charging (% Leaks) (% Leaks) (% Leaks) (sec) (log avg) 2015 Limits 38% 0.8% 25% 12 sec (July 2 start) 2016 Limits 22.5% 0.8% 15% 12 s 2017-2019 Limits 7% 0.8% 4.2% 12 s 2020 Limits 4%

  9. Slide 9: Performance Review – Daily Observations – Pushing Emissions

    Site-Specific Standard Order (Particulates): Performance Review – Daily Observations – Pushing Emissions Date Pushing Emission (opacity %) 2015 Limit (July 2 start) ≥ 50% 2016 – 2018 ≥ 50% 2019 ≥ 40% 2020 ≥ 30% Jan. 1 to June 10, 2018 Range 0 – 45 % (Average) (11.02 %) Pushes < 84 per day 0 – 40 % (

  10. Slide 10: Site-Specific Standard Order (Particulates): Performance Review – Additional Items

    Site-Specific Standard Order (Particulates): Performance Review – Additional Items Community complaints since the last CLC meeting: A. Complaints registered with HIEA and MOECC; shared cleanup costs 1. Beach Blvd. - Black dust (Jan. 12, 2018) – Strong wind and coal unloading at AMD and Stelco on Dec

  11. Slide 11: NOx emission

    NOX emission Conclusion: Factors affecting the formation of NO2 that caused the brown emissions which gradually get darker nearing the Battery reversal are: the COG composition in terms of NH3 content, COG combustion conditions, flame temperature, O2 content, moisture, atmospheric and photochemical

  12. Slide 12: Pushing Emission

    Pushing Emission Conclusion: Inadequate temperature in the coke oven during the coking process, resulting in “green coke”. How to address the issue: i. Battery heating has been supplemented by natural gas since May 24, 2018. ii. Permanent crew to clean the heating system and flues. Resolution: Simil

  13. Slide 13: Quenching Emission

    Quenching Emission Conclusion: Inefficient removal of particulates during the quenching of coke. Probable Cause: As designed, the quench tower has baffles that capture most coke particulates upon release by the rising steam as water gets in contact with hot coke. If these baffles are damaged or miss

  14. Slide 14: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 24 January 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Monitoring Requirements under O.Reg. 419/05 Site Specific Standard Order – Benzene 6. Community

  15. Slide 15: Benzene

    Benzene

  16. Slide 16: Sampling Strategy – Benzene

    Sampling Strategy – Benzene The goal is to identify additional fugitive sources of benzene to assess the quantity and frequency to answer the question, Is the source significant and can it be reduced? • Review the process stream to identify where benzene might report • Monitor – Hand-held with Photo

  17. Slide 17: Stelco Hamilton Benzene Sources

    Stelco Hamilton Benzene Sources Sources Identified in 2013 HW Refined ESDM Number | Source ID Source ID Indicated on Source Description Drawii BTCK13 1 #7 Battery Stack STCK56a 2 Coke Shed Baghouse Stacks LODS 19 Light Oil Decanter/Separator STCK5S6b 3 Coke Shed Baghouse Stacks LIGHTOST 20 Light Oil

  18. Slide 18: Stelco Hamilton Benzene Sources – Additional Sources

    Stelco Hamilton Benzene Sources Additional Sources Modeled as fugitive emissions in the 2013 HW Refined ESDM (CAMM) be : Number Indicated ; urce ID ; onDrawings Source Description ~ 34 Muller ing of Coal nes, Tar Sludge, etc. 35 Tar Contaminated Wastes Storage 36 Diesel Fuel Storage Tanks 37 Process

  19. Slide 19: No. 2 By-Products Plant

    Na 2 ORE 00CcK 1 BY PRODUCTS PLANT ~ #2 BY PRODUCTS PLANT Stelco Inc. a AE EAL Me ry coke ove stelco PRocess Léyours: By.Peabuers = \|3|300G0 o|oo03) a =— a a a cin H H i

  20. Slide 20: Inset Plan Grade Level at A.R.E. Plant

    i ¥ 1 is 5 4 1 = 2 1 u Gl 2 TIRE SOL A mgpworee = a4 2 EE on INSET PLAN GRADE LEVEL AT A,R.E. PLANT — AuvoRCUS, aMuceA Srowane twee 7 LT SURFACE AP COOL “itéio— | ; 0 ice us ~— a a = Pancese wAreR: STRUMERS tes sineern ACESS WATER PUMPS | —— —— esr eset overs wars occawreR Hine anes] Ea Fane hanan m

  21. Slide 21: Area Office Building Site Plan

    AREA \ OFFICE BLOG TL \ o —"E" FCE. . PCI RS os / ae i 15) ps1 4 = ZELIZIZE. ri ee Z o olf os 7 ok Ll co abt Q Boce 2A_SINTER ‘PLANT o 620 = oa @) Cee ZLIILL Zz FIZZ = io = oo ose @) O NO.6 BATT. NO.7,. BATT. 0617 9 8 — ne 2 4 Offices — MAKING [_] UJ Le QO 1 OFFICES [ By-PrRoDUcTS |L Ke SPARE ; PART

  22. Slide 22: Slide 22

  23. Slide 23: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 24 January 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Monitoring Requirements under O.Reg. 419/05 Site Specific Standard Order – Benzene 6. Community

  24. Slide 24: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 24 January 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Monitoring Requirements under O.Reg. 419/05 Site Specific Standard Order – Benzene 6. Community

  25. Slide 25: Thank You.

    Thank You. stelcocanada.com

Stelco Holdings — Corporate Update (June 2018) on 6ix