Slide 1: Hamilton Works Community Liaison Committee Meeting
Hamilton Works Community Liaison Committee Meeting June 20 2018 Andy Sebestyen
Slide 2: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 24 January 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Monitoring Requirements under O.Reg. 419/05 Site Specific Standard Order – Benzene 6. Community
Slide 3: Know Your Emergency Exits
Know Your Emergency Exits Review Evacuation Routes of the room you are located in
Slide 4: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 24 January 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Monitoring Requirements under O.Reg. 419/05 Site Specific Standard Order – Benzene 6. Community
Slide 5: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 24 January 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Monitoring Requirements under O.Reg. 419/05 Site Specific Standard Order – Benzene 6. Community
Slide 6: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 24 January 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Monitoring Requirements under O.Reg. 419/05 Site Specific Standard Order – Benzene 6. Community
Slide 7: Site-Specific Standard Order (Particulates): Performance Review – Daily
Site-Specific Standard Order (Particulates): Performance Review – Daily Date Doors Lids Off-takes (% Leaks) (% Leaks) (% Leaks) 2015 Limits 54% 2% NA (July 2 start) 2016 Limits 32% 2% NA 2017-2019 Limits 10% 2% 5% 2020 Limits 5% 1% 4% Jan. 1 to June 10, 2018 0 – 4.23% 0 – 1.27% 0 – 5.13% Range (0.25
Slide 8: Site-Specific Standard Order (Particulates): Performance Review – 30 Day Rolling Averages
Site-Specific Standard Order (Particulates): Performance Review – 30 Day Rolling Averages Date Doors Lids Off-takes Charging (% Leaks) (% Leaks) (% Leaks) (sec) (log avg) 2015 Limits 38% 0.8% 25% 12 sec (July 2 start) 2016 Limits 22.5% 0.8% 15% 12 s 2017-2019 Limits 7% 0.8% 4.2% 12 s 2020 Limits 4%
Slide 9: Performance Review – Daily Observations – Pushing Emissions
Site-Specific Standard Order (Particulates): Performance Review – Daily Observations – Pushing Emissions Date Pushing Emission (opacity %) 2015 Limit (July 2 start) ≥ 50% 2016 – 2018 ≥ 50% 2019 ≥ 40% 2020 ≥ 30% Jan. 1 to June 10, 2018 Range 0 – 45 % (Average) (11.02 %) Pushes < 84 per day 0 – 40 % (
Slide 10: Site-Specific Standard Order (Particulates): Performance Review – Additional Items
Site-Specific Standard Order (Particulates): Performance Review – Additional Items Community complaints since the last CLC meeting: A. Complaints registered with HIEA and MOECC; shared cleanup costs 1. Beach Blvd. - Black dust (Jan. 12, 2018) – Strong wind and coal unloading at AMD and Stelco on Dec
Slide 11: NOx emission
NOX emission Conclusion: Factors affecting the formation of NO2 that caused the brown emissions which gradually get darker nearing the Battery reversal are: the COG composition in terms of NH3 content, COG combustion conditions, flame temperature, O2 content, moisture, atmospheric and photochemical
Slide 12: Pushing Emission
Pushing Emission Conclusion: Inadequate temperature in the coke oven during the coking process, resulting in “green coke”. How to address the issue: i. Battery heating has been supplemented by natural gas since May 24, 2018. ii. Permanent crew to clean the heating system and flues. Resolution: Simil
Slide 13: Quenching Emission
Quenching Emission Conclusion: Inefficient removal of particulates during the quenching of coke. Probable Cause: As designed, the quench tower has baffles that capture most coke particulates upon release by the rising steam as water gets in contact with hot coke. If these baffles are damaged or miss
Slide 14: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 24 January 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Monitoring Requirements under O.Reg. 419/05 Site Specific Standard Order – Benzene 6. Community
Slide 15: Benzene
Benzene
Slide 16: Sampling Strategy – Benzene
Sampling Strategy – Benzene The goal is to identify additional fugitive sources of benzene to assess the quantity and frequency to answer the question, Is the source significant and can it be reduced? • Review the process stream to identify where benzene might report • Monitor – Hand-held with Photo
Slide 17: Stelco Hamilton Benzene Sources
Stelco Hamilton Benzene Sources Sources Identified in 2013 HW Refined ESDM Number | Source ID Source ID Indicated on Source Description Drawii BTCK13 1 #7 Battery Stack STCK56a 2 Coke Shed Baghouse Stacks LODS 19 Light Oil Decanter/Separator STCK5S6b 3 Coke Shed Baghouse Stacks LIGHTOST 20 Light Oil
Slide 18: Stelco Hamilton Benzene Sources – Additional Sources
Stelco Hamilton Benzene Sources Additional Sources Modeled as fugitive emissions in the 2013 HW Refined ESDM (CAMM) be : Number Indicated ; urce ID ; onDrawings Source Description ~ 34 Muller ing of Coal nes, Tar Sludge, etc. 35 Tar Contaminated Wastes Storage 36 Diesel Fuel Storage Tanks 37 Process
Slide 19: No. 2 By-Products Plant
Na 2 ORE 00CcK 1 BY PRODUCTS PLANT ~ #2 BY PRODUCTS PLANT Stelco Inc. a AE EAL Me ry coke ove stelco PRocess Léyours: By.Peabuers = \|3|300G0 o|oo03) a =— a a a cin H H i
Slide 20: Inset Plan Grade Level at A.R.E. Plant
i ¥ 1 is 5 4 1 = 2 1 u Gl 2 TIRE SOL A mgpworee = a4 2 EE on INSET PLAN GRADE LEVEL AT A,R.E. PLANT — AuvoRCUS, aMuceA Srowane twee 7 LT SURFACE AP COOL “itéio— | ; 0 ice us ~— a a = Pancese wAreR: STRUMERS tes sineern ACESS WATER PUMPS | —— —— esr eset overs wars occawreR Hine anes] Ea Fane hanan m
Slide 21: Area Office Building Site Plan
AREA \ OFFICE BLOG TL \ o —"E" FCE. . PCI RS os / ae i 15) ps1 4 = ZELIZIZE. ri ee Z o olf os 7 ok Ll co abt Q Boce 2A_SINTER ‘PLANT o 620 = oa @) Cee ZLIILL Zz FIZZ = io = oo ose @) O NO.6 BATT. NO.7,. BATT. 0617 9 8 — ne 2 4 Offices — MAKING [_] UJ Le QO 1 OFFICES [ By-PrRoDUcTS |L Ke SPARE ; PART
Slide 22: Slide 22
Slide 23: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 24 January 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Monitoring Requirements under O.Reg. 419/05 Site Specific Standard Order – Benzene 6. Community
Slide 24: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 24 January 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Monitoring Requirements under O.Reg. 419/05 Site Specific Standard Order – Benzene 6. Community
Slide 25: Thank You.
Thank You. stelcocanada.com