  1. Slide 1: Mozambique – Real Opportunity

    Mozambique – Real Opportunity Benchmark Mineral Intelligence Graphite and Anodes Conference 2018 1

  2. Slide 2: Graphite Price Forecast – Benchmark Mineral Intelligence

    Graphite Price Forecast – Benchmark Mineral Intelligence Balama Central Project Basket Price BAT Montepuez Project Basket Price 2

  3. Slide 3: Project 1 Montepuez

    Project 1 Montepuez Montepuez Graphite Project 2 VES (First Module) Annual graphite production 45,000 – 50,000pa Capex (pre-production) US$51.2 M Opex (concentrate/t)7 US$378/t Grade processed 12% TGC Plant Type and Scale Modular, ~500ktpa Projected Payback ~2 years5 Net Operating Cash Flow ~US$20 M

  4. Slide 4: May 2018 Satellite Image

    May 2018 Satellite Image Elephant Deposit Buffalo Deposit Plant Site Camp Warthog Prospect Tailings dam Haul Road 4

  5. Slide 5: Permanent Camp Construction - on track

    Permanent Camp Construction - on track 5

  6. Slide 6: Montepuez Project Camp Commissioning – On Track

    Montepuez Project Camp Commissioning – on Track 6

  7. Slide 7: Plant Site Earthworks – on track

    Plant Site Earthworks – on track 7

  8. Slide 8: Tailings Storage Facility (TSF)– on track

    Tailings Storage Facility (TSF)– on track 8

  9. Slide 9: Community Engagement – on track

    Community Engagement – on track 9

  10. Slide 10: Buffalo Deposit – RC Grade control - complete

    Buffalo Deposit – RC Grade control - complete 10

  11. Slide 11: Elephant Deposit – RC Grade Control - complete

    Elephant Deposit – RC Grade Control - complete 11

  12. Slide 12: Project 2 Balama Central Graphite Project

    Project 2 Balama Central Graphite Project Balama Central Graphite Project 2 Scoping Study Annual graphite production 50,000 – 55,000pa Capex (pre-production) US$50 M Opex (concentrate/t)6 US$372/t Grade Processed 10.6% TGC Plant Type and Scale Modular, ~550ktpa Projected Payback <1.5 years5 Net Oper

  13. Slide 13: Balama Central Deposit

    Balama Central Deposit Competed Drholes - Osc 2017 Buk Sample Pt 88h Pegmatie Psariite Indicated Resource Inferred Resource Oy T 8 000mE Vi. Ye BYRON 8.52,000mi BATTERY MINERALS VTEM Conductor Targets Lennox and Byron Resources Balama Graphite Project March 2018 ‘SOUTH EAST 39.4m @ 14:10% TCC. incl.

  14. Slide 14: Production Profile – Significant opportunity

    Production Profile – Significant opportunity 14

  15. Slide 15: Purification and Spheroidization Testwork

    PURIFICATION AND SPHEROIDIZATION TESTWORK • Montepuez flake identified with high crystallinity, ultra low • Testwork programme undertaken by Urbix Boron content, unique flake morphology and URBIX Purification • Progress todate technology together opening potential new markets • Purification success

  16. Slide 16: Graphite Demand – Large growing market

    Graphite Demand – Large growing market 16

  17. Slide 17: Next Steps

    Next Steps 1. Complete Montepuez project finance 2. Award remaining construction contracts 3. Urbix, Anode and other downstream Scoping Study 4. Reserve update 5. Balama Feasibility Study Results 6. Start mining processing and exporting 7. Investigate Vanadium and other opportunities 17

  18. Slide 18: Appendices

    APPENDICES • Current Projects Summary • Mineral Resources, Reserves, • Competent person statements • Historical Prices for Vanadium • Disclaimer 18

  19. Slide 19: Current Projects

    Current Projects Project Description Status Montepuez Graphite Produce 50,000tpa @ >96% TGC • DFS, VES, Detailed eng. , Camp, Roads and plant site CPL Oct 2018 Project stage 1 OPEX cost FOB Moz USD $378/t • Tailings Dam wall and earthworks will be complete by December 2018, 50,000tpa, planning CAPEX

  20. Slide 20: Montepuez Ore Reserves and Mineral Resources

    Montepuez Ore Reserves and Mineral Resources • Ore Reserve Estimate January 2017 for Buffalo and Elephant deposits is 41.4Mt @ 8.80% TGC for 3.64Mt of graphite reported at a cut-off grade of 4% TGC – Note; the Ore Reserve Statement predates the updated Mineral Resource Statements. The Company is cur

  21. Slide 21: Group Mineral Resource Statement

    Group Mineral Resource Statement 1Battery Minerals Group MRE Group Mineral Resource Estimate (2.5% - Montepuez, 6% - Balama TGC Cut-off) Total Mineral Resource As of October 2018 Project Group Total Mineral Resource - Weathered Deposit Tonnes TGC Cont. Graphite for the Montepuez and Balama Central M

  22. Slide 22: Vanadium pricing last 20 years - CRU

    Vanadium pricing last 20 years - CRU 22

  23. Slide 23: Disclaimer & Competent Persons Statement

    Disclaimer & Competent Persons Statement Forward Looking Statements published data for which Competent Persons consents were periodic and continuous disclosure announcements lodged with obtained. Their consents remain in place for subsequent releases the ASX, which are available on the Battery Miner