  1. Slide 1: High Grade Gold in the Bousquet-Cadillac Mining Camp

    RDS:TSX.V High Grade Gold in the Bousquet-Cadillac Mining Camp

  2. Slide 2: Cautionary Statement

    Cautionary Statement CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION Except for historical information certain statements included in this presentation are forward-looking statements within the meaning of Canadian securities laws. Such statements may include words such as “Anticipates”, “

  3. Slide 3: The Old O'Brien Mine

    THE OLD O’BRIEN MINE RICHEST MINE BY GRADE ALONG THE CADILLAC FAULT HISTORIC PRODUCTION 1.2M TONS AT 15.25 G/T AU FOR 587,121 OZ1 3 1. 43-101 Technical report for the O’Brien project, Abitibi, Québec, InnovExplo, April 10th 2015

  4. Slide 4: Investing in Quebec

    Investing in Quebec • STABLE JURISDICTION • SUPPORTIVE FISCAL POLICY • RANKS 6TH WORLDWIDE FOR ITS INVESTMENT ATTRACTIVNESS1 • PARAGOVERNMENTAL INSTITUTIONS INVESTING IN EXPLORATION • ACCESS TO AN EXPERIENCED LABOR POOL 4 1. Institut Fraser, 2014 Annual survey of mining companies, February 24th, 201

  5. Slide 5: Investing in Radisson: The O'Brien Project

    Investing in Radisson THE O’BRIEN PROJECT PEA RELEASED 94 EXPLORATION DRILLING TARGETS IN DECEMBER 2015 TO GENERATE VALUE EXPERIENCED STRONG WORLD 100% BOARD WITH +15% SHAREHOLDER RENOWNED OWNERSHIP IN OWNERSHIP BASE MINING CAMP THE PROJECT 5

  6. Slide 6: Regional setting

    HOLLOWAY Moz DUPARQUET ‘Au : 1.2 Moz CADILLAC-BOUSQUET Au : 21.0 Moz irkland Lake VAL-D‘OR ‘Au: 14.0 Moz Geology Gold Mine / Prospect UNDIVIDED GRANITOID ROCKS. ACTIVE MINE, UNDIVIDED VOLCANIC ROCKS PROSPECT / CLOSED MINE UNDIVIDED SEDIMENTARY ROCKS —_Property COARSECLASTIC SEDIMENTS NJ. RADISSON [A

  7. Slide 7: The Bousquet-Cadillac Mining Camp

    The Bousquet-Cadillac Mining Camp 7

  8. Slide 8: Realized in the last 3 years with a $1.2M budget

    Realized in the last 3 years with a $1.2M budget 2013 2014 2015 Historic data compilation Metallurgical study1 • Average head grade 11.13 g/t Au • Total recovery 93-94% • 59.2% of free gold Current Resource Preliminary economic assessment3 increase2 • Total production of 135,308 oz Au • Diluted head

  9. Slide 9: 3 years share price performance

    3 years share price performance OUVERT OUVERT OUVERT 9 Source bigcharts.marketwatch.com

  10. Slide 10: Current mineral resources

    Current mineral resources Indicated Inferred Grade Grade Area Cut-off Tonnage Ounces Area Cut-off Tonnage Ounces g/t g/t 2.00 1,384,700 4.22 188,049 2.00 3,388,500 3.64 396,601 2.50 991,200 5.01 159,770 2.50 2,254,100 4.36 315,725 All 3.00 748,800 5.75 138,456 All 3.00 1,525,300 5.12 251,293 Areas 3

  11. Slide 11: The O'Brien Project – Longitudinal section

    The O'Brien Project – Longitudinal section Historic production 1.2M tons at 15.25 g/t Au for 587,121 oz1 11 1. 43-101 Technical report for the O’Brien project, Abitibi, Québec, by InnovExplo, April 10, 2015

  12. Slide 12: PEA - Base case scenario

    PEA - Base case scenario Parameters Results Mineral resources included (Indicated and Inferred) 712,521 tonnes @ 6.46 g/t Au Mill recovery 91.5% LOM (including 24 months of preproduction) 6 years Daily mine production 440 tpd Gold recoverd over the LOM 135,308 oz Gold price (US $) $1,180/oz Exchange

  13. Slide 13: Custom milling options

    adhered Custom milling options ES Barraute @ Parc National d‘Aiguebelle ¢ - Gravity concentration 7 200 Laronde Agnico-Eagle and Leaching Sania) 7 + Sentiencatencl 2200 Pal, ¢ i Mesiwcod) SCOLe Carbon-in-pulp 800 fs ae Tone Camflo Richmont Leaching / Merrill-Crowe 4.200 40 Lac Herbin QMX Flotation a

  14. Slide 14: Advanced exploration program

    Advanced exploration program • 6,200m drill program underway • 30,000m to be completed by year-end 2016 • Mineral resource estimate update • Permitting and baseline environmental study • Stakeholder mapping and communication plan • Surface work proram 2017 • Start of the decline • Bulk sampling • PE

  15. Slide 15: Projected mining plan

    Projected mining plan • Average veins dip à 85° • Access by decline to a depth of 550m on 36E area • Cut-off at 5.21 g/t Au Old O’Brien mine 36 E Kewagama Area 1 Area 2 OUVERT OUVERT Area 3 OUVERT Area 4 Area 5 Area 6 15

  16. Slide 16: Longitudinal section – Extension targets

    Longitudinal section – Extension targets 16

  17. Slide 17: Aerial view – Exploration targets

    Aerial view – Exploration targets 17

  18. Slide 18: Towards underground exploration

    Towards underground exploration NEXT STEPS • Increase and define resources • Lower CAPEX with surface work program Old O’Brien mine 36 E Kewagama Area 1 Area 2 OUVERT OUVERT Area 3 OUVERT Area 4 Area 5 Area 6 Indicated resources Inferred resources Historic resources 18

  19. Slide 19: 2014 metallurgical testing

    2014 metallurgical testing § 11.13 g/t Au average grade1,2 § 59.2% recovery by gravity concentration2 § Total recovery of 93-94%2 Free Gold Recovered by Gravity Concentration 1. Sample tested totalled 61 kg and graded 7.26 g/t Au. It consisted of composite core lenghts from the main structures of

  20. Slide 20: Sensitivity analysis

    Sensitivity analysis Parameter Grade Net NPV (5%) IIR1 g/t Au cashflow (M$)1 (M$)1 8.39 66.9 49.0 43% 7.75 47.0 32.7 31% 7.10 27.1 16.5 19% Grade 6.46 7.2 0.2 5% g/t Au 5.81 (12.7) (16.1) -10% 5.16 (32.5) (32.3) -26% 4.52 (52.4) (48.6) -46% Parameter Variable Net NPV (5%) IIR1 % cashflow (M$)1 (M$)1

  21. Slide 21: Social acceptance

    Social acceptance • The Cadillac district is a world renowned mining camp • 3 mines are in production within 25km of the O’Brien project • The corporation works in collaboration with all local authorities • Radisson is committed to Radisson mining resources at PDAC 2015 with Valérie Fillion, Executi

  22. Slide 22: Board of Directors

    Board of Directors 100 years+ in the industry JEAN-MARIE DUPONT • Successful businessman Chairman of the Board • Founded Radisson in 1983 25 years in the Brokerage industry MARIO BOUCHARD • • President of Admirio Industriel inc. President & CEO • Director of Rouyn-Noranda branch of CIM for 26 years

  23. Slide 23: Capital Structure

    Capital Structure Outstanding shares 88,361,196 Stock Options 2,960,000 Warrants 2,367,323 Diluted Share Capital 93,688,519 23

  24. Slide 24: Contact

    Corporate Info Contact Mario Bouchard, President & CEO mbouchard@radissonmining.com T. 819.797.0396 24

  25. Slide 25: The O'Brien Project Has It All!!!

    Takeaways § How many projects are located in the heart of a world renowned mining camp that produced more than 21M oz Au? § How many project are host of the richest mine by grade in Quebec? § How many project have a CAPEX lower than $50M CAD? § How many metallurgical testing returned an average