Vedanta Limited · NSE:VEDL

Vedanta — Investor Presentation (June 2021)

36 slides from Vedanta's investor presentation, June 2021

  1. Slide 1: Investor Presentation

    Investor Presentation VEDANTA LIMITED June 2021 Sensitivity: Internal (C3)

  2. Slide 2: Cautionary Statement and Disclaimer

    Cautionary Statement and Disclaimer The views expressed here may contain information derived from statement involves risk and uncertainties, and that, although we publicly available sources that have not been independently verified. believe that the assumption on which our forward-looking statements

  3. Slide 3: Vedanta: World-Class Natural Resources Powerhouse

    Vedanta: World-Class Natural Resources Powerhouse ▪ One of the largest diversified natural resource businesses in the Global Mindset world Right Commodities ▪ 85%+ of EBITDA comes from Zinc, Aluminium and Oil & Gas ▪ World-Class player with a proven record in India and South Africa Right Geography ▪

  4. Slide 4: ESG is core to everything we do

    ESG is core to everything we do Achievements in FY 2021 On track to Achieve Vedanta’s Vision ▪ Water Savings of 2.03 mm3 ▪ Zero discharge across all our sites ▪ 1.86 million GJ Energy Savings ▪ 20% reduction in GHG emission intensity by 2025 from a 2012 baseline ▪ Reduced GHG emissions by 13.0 milli

  5. Slide 5: Ideally Positioned with Attractive Commodity Mix

    Ideally Positioned with Attractive Commodity Mix Vedanta has unparalleled exposure to India, the world’s fastest growing major economy with excellent diversified exposure 2021 2030 CAGR World CAGR India demand Global demand GDP CAGR 2020–20302 CAGR 2020–20302 (real terms) $2.8trn $4.8trn 6.3% 3.1% G

  6. Slide 6: Attractive Business Portfolio

    Attractive Business Portfolio Aluminum Zinc & Silver Oil & Gas Iron & Steel ✓ Largest aluminum ✓ One of the Largest ✓ India’s largest private- ✓ India's largest private capacity in India with integrated zinc- lead sector crude oil producer sector exporter of iron ore captive power and an smelter sin

  7. Slide 7: Key Highlights: FY 2021

    Key Highlights: FY 2021 Production Cost of Production R&R Records Lower Advancing At Zinc India, Aluminium & Zinc Across all the businesses Enhancing life and R&R base International Reliability Technology & Digitalization COVID-19 Improved On Track Highest safety standards No major operational disru

  8. Slide 8: Delivering Strong Operational Performance in Challenging times

    Delivering Strong Operational Performance in Challenging times Aluminium Zinc India Gamsberg 1,047 1,690 954 1,347 1,445 1,288 Strong 1,904 1,969 870 930 108 145 operational recovery FY20 FY21 FY20 FY21 FY20 FY21 Aluminium (kt) COP ($/t) Metal (kt) COP ($/t) MIC Production (kt) COP $/t Record Produc

  9. Slide 9: Expansion Underway in all Businesses

    Expansion Underway in all Businesses Low Costs Assets Leading to Significant Production Ramp-up across all Businesses Zinc India Zinc International Oil & Gas Aluminium Steel Growth projects ▪ Ramp-up of including: Jharsuguda II total ▪ Achieved 1.5 Mtpa ▪ All expansion - EOR smelter from 2.0 Mtpa ho

  10. Slide 10: Financial snapshot FY 2021

    Financial snapshot FY 2021 EBITDA Attributable PAT (before Gross Debt ND exceptional items) $ 3,689 mn $ 1,640 mn $ 7,780 mn $ 3,331 mn 30% up Strong financial performance ~4% lower EBITDA Margin * ROCE # Cash & Cash Equivalents ND/EBITDA 36% c.19% $ 4,450 mn 0.9x Industry leading margin Improved do

  11. Slide 11: Capex and Returns Profile

    Capex and Returns Profile Growth CAPEX Profile, $bn Oil & Gas Zinc Al & Power Copper Other Optionality Full year Capex guidance 0.7 1.0 1.2 1.5 1.2 0.7 1.1 1.1 0.1 0.2 0.8 0.8 0.1 0.7 0.1 0.5 0.1 0.6 0.1 0.3 0.2 0.2 0.3 0.1 0.5 0.3 0.2 0.3 0.1 0.2 0.1 0.1 0.5 0.5 0.2 0.4 FY2016 FY2017 FY2018 FY2019

  12. Slide 12: Balance Sheet and Debt Breakdown

    Balance Sheet and Debt Breakdown Net Debt / EBITDA – maintained at low level Debt Breakdown (as of 31st Mar 2021) 1.1 1.0 Debt breakdown as of 0.9 0.9 (in $bn) 31st Mar 2021 0.4 Term debt 7.3 Working capital 0.2 FY'17 FY'18 FY'19 FY'20 FY'21 Short term borrowing 0.3 ▪ Liquidity: Total consolidated d

  13. Slide 13: Strategy to Enhance Long Term Value

    Strategy to Enhance Long Term Value Continue Focus on World Class ESG Performance Augment Our Reserves & Resources Base Operational Excellence and Cost Leadership Optimise Capital Allocation & Maintain Strong Balance Sheet Delivering on Growth Opportunities VEDANTA LIMITED – INVESTOR PRESENTATION 13

  14. Slide 14: Appendix

    Appendix Sensitivity: Internal (C3)

  15. Slide 15: Vedanta Growth Trajectory – Focus On Growth Projects

    Vedanta Growth Trajectory – Focus On Growth Projects Well Invested And Consolidated Assets : Driving Growth ✓ Acq Zinc Intl FY 2013- ✓ Cmd 1.5mt mill 21 at SK mine FY 2012 √ Cmd 1,980MW TSPL ✓ Cmd 2,400 MW FY2010 JHA FY2012 √ Exp 1.2 mt zinc ✓ Acq VS Dempo FY 2011 ✓ Acq Cairn India √ Cmd 250kt Gamsb

  16. Slide 16: Resilience under COVID-19 Pandemic

    Resilience under COVID-19 Pandemic No impact on operations in current FY, during lockdown given Limited Disruptions to Operations essential nature of all businesses Low cost production with One of the lowest cost producers across various commodities, with positive FCF positive FCF generation even un

  17. Slide 17: COVID-19 Response: Supporting Communities, Employees & Partners

    COVID-19 Response: Supporting Communities, Employees & Partners Vedanta Cares 1,000 bed initiative in 10 locations across India will add Helping Community 10 ventilator-equipped beds, 90 oxygen-support beds in each location. ▪ Aluminium, Cairn, HZL have added almost 1000 additional Global Standards

  18. Slide 18: Heading Towards – Zero Harm, Zero Waste, Zero Discharge

    Heading Towards – Zero Harm, Zero Waste, Zero Discharge Safety Program Update ▪ Comprehensive focus on HSE at CEO and Group ExCo Level; Consequence Management program set up Focus on Learning and ▪ New Vedanta-wide Fatality Investigation Procedure Improvement ▪ Working groups focusing on critical ri

  19. Slide 19: Climate Change Roadmap

    Climate Change Roadmap Building Blocks to achieve Net-Zero Carbon Emissions Avoid Increase Renewable Energy Deployment Minimize Align with Science Based Targets Offset Bridge gap by sequestration & carbon credits use Disclose Annual TCFD Climate Change Report FY2021 Milestones ▪ 13.6 million tons of

  20. Slide 20: Aluminium: Success Continues; Growing Value in Dynamic World

    Aluminium: Success Continues; Growing Value in Dynamic World Aluminium Production & COP Performance Update 1,904 1,969 Quarter Performance: 1,451 1,387 1,433 ▪ Highest ever Aluminium production 531 kt*, up 12% y-o-y and 1,690 1,347 7% q-o-q 474 497 531 ▪ Aluminium COP $ 1,433/t, down 1% y-o-y and up

  21. Slide 21: Alumina: Expanding Lanjigarh on path to Vertical Integration

    Alumina: Expanding Lanjigarh on path to Vertical Integration Grow Into Among One Of The Largest Single-location Alumina Refineries In The World 5 Capacity (Mtpa) 2 Expected Project Completion by Q1 FY2023 Present Target Strong Foundation for Expansion Finest Technical Mix of global & local bauxite T

  22. Slide 22: Zinc India: A Year Full of the Achievements

    Zinc India: A Year Full of the Achievements Sustained production post-transition to Performance Update fully UG mining company 19% UG ▪ Highest ever Ore production of 15.5 million MT CAGR ▪ Highest ever Mined Metal Delivered of 972kt, up 6% 972 Mined Metal in kt 223 936 917 426 primarily on account

  23. Slide 23: Zinc India: Strategy in Practice for Executing Growth Imperatives

    Zinc India: Strategy in Practice for Executing Growth Imperatives Strengthen Cost Leadership Portfolio of Mines with Long Transition to a Circular Life Economy ▪ Digitalization ▪ Upgrading R&R through world ▪ Focus on technology and ▪ Autonomous vehicles class technologies innovation to ▪ Implemente

  24. Slide 24: Zinc International: Gamsberg Positioning for Long Term Value Creation

    Zinc International: Gamsberg Positioning for Long Term Value Creation Continued Performance Ramp Up Performance Update Quarter Performance: 1501,484 1,445 1500 1,350 ▪ Highest milled tonnes achieved at 961kt in Q4 and best 1300 displayed mill throughput at 522tph 100 1,246 1,288 1,240 1100 ▪ Highest

  25. Slide 25: Zinc International: Gamsberg Ramp up Plan

    Zinc International: Gamsberg Ramp up Plan 145kt 190-210kt FY21 Four Key Priorities Going Forward FY22e Mining Focused Concentrator Focused 1 2 3 4 Equipment Run-hours Additional Resource Increase Mill Recovery Ramp up Improvement to gear up Mining Throughput Increase Expedite on-boarding Improve rec

  26. Slide 26: Oil & Gas: Stable Operations, Focus on Delivery of Growth Projects

    Oil & Gas: Stable Operations, Focus on Delivery of Growth Projects Operations Growth Projects OALP ▪ Gas Terminal: Ramp-up by ▪ Drilling: 15 well exploration ▪ Production: Increased to 165 ~15kboepd underway. Gas offtake kboepd in Q4 FY21 vs 160 kboepd drilling program commenced impacted by Covid in

  27. Slide 27: Oil & Gas: Digitalisation & Partnering to Drive Efficiency & Recovery

    Oil & Gas: Digitalisation & Partnering to Drive Efficiency & Recovery Digitalization to improve Technology to Solution based asset reliability accelerate recovery Partner Approach • Well interventions • Polymer & Water • Global EOI for solution & • Process Controls Management KPI driven Partnering •

  28. Slide 28: Iron ore: Resilient Results in Extraordinary Times

    Iron ore: Resilient Results in Extraordinary Times Capitalised opportunity of increased Global Value Added Business prices by increasing sales in Goa 2.1 ▪ Benefitted by domestic steel prices and International coal prices Mnt 0.8 0.9 ▪ Margin improvement through efficiency 0.6 0.6 enhancement projec

  29. Slide 29: ESL Steel: Continuing Improvement Journey

    ESL Steel: Continuing Improvement Journey Performance Update Capacity Expansion Plan in Pipeline Quarter Performance: ▪ Robust margin of $131/t, highest in FY21 ▪ Doubling Hot Metal Capacity from 1.5 to 3 ▪ Saleable Production of 319kt, flat y-o-y and down 6% MTPA production q-o-q ▪ Sales of 323kt,

  30. Slide 30: FACOR: Complete Turnaround Performance

    FACOR: Complete Turnaround Performance Delivering Stronger Growth and Margins FY22 Growth Plan ▪ Ore Production in H2 increased by 105% vs H1 ▪ Targeting to increase Furnace ▪ Reduced ore procurement from third party to ZERO production by 10% by optimizing operation & better process control ▪ Fe chr

  31. Slide 31: Funding Sources and Term Debt Maturities

    Funding Sources and Term Debt Maturities Diversified Funding Sources for Term Debt of $7.3bn Term Debt Maturities : ₹ 53,326 Cr ($7.3bn) (as at 31 Mar’21) (as of 31st Mar 2021) 1% 40% Term Loans-INR 21.2 10% 28 % Bonds-INR 14.7 18% 7.7 Term Loans-USD/Foreign ₹ ‘000 Crore Currency 4.7 9.7 14% 31% Bon

  32. Slide 32: FY 2022 Guidance

    FY 2022 Guidance Segment Production and COP Mined Metal and Finished Metal: 1,025 – 1,050 Kt Zinc India Silver: c. 720 tonnes COP: < $1,000/t excluding royalty BMM: ~70 – 80 Kt Zinc International Gamsberg: 190-210 kt COP: $1,100/t - $1,200/t Average Gross Volume: 175-185 kboepd; Oil & Gas Opex: c. $

  33. Slide 33: Augment our Reserves and Resources Base

    Augment our Reserves and Resources Base Focused exploration to expand our reserves and resources base for support our future growth through • Targeted and disciplined exploration • Offsetting depletion and bringing on stream more discoveries • Team aim to discover mineral and oil deposits in a safe

  34. Slide 34: Key Recognitions in FY 2021

    Key Recognitions in FY 2021 Health & Safety Environment, Social & People Business Excellence & Digitilization British Safety Council: Cairn Oil & Gas Identified as ‘Responsible business of Annual BS 1000 (By total revenue) received Sword of Honor for the Year’& awarded with Grant Awarded to Vedanta

  35. Slide 35: Disclosures & Publications

    Disclosures & Publications Sustainability Report Tax Transparency Report Integrated Annual Report TCFD Report VEDANTA LIMITED – INVESTOR PRESENTATION 35 Sensitivity: Internal (C3)

  36. Slide 36: Group – Present Debt Structure

    Group – Present Debt Structure ($ bn) Vedanta Resources (Consolidated) Volcan FY21 FY21 EBITDA 3.8 EBITDA - Net Debt 10.5 Net Debt 0.2 Vedanta Resources (Standalone) FY21 % EBITDA 0.1 2% Divisions of Vedanta Limited Net Debt 7.2 68% 55.1% ⚫ Sesa Iron Ore ⚫ Sterlite Copper Vedanta Ltd (Consolidated)

Vedanta — Investor Presentation (June 2021) on 6ix