Beach Energy Limited · ASX:BPT

Beach Energy — Non-Deal Roadshow (October 2018)

89 slides from Beach Energy's roadshow presentation, Oct 8, 2018

  1. Slide 1: ASX release: 2018 Asia Roadshow Presentation

    Beach Energy Limited ABN 20 007 617 969 25 Conyngham St, Glenside 5065, South Australia GPO Box 175, Adelaide 5001, South Australia T: +61 8 8338 2833 F: +61 8 8338 2336 beachenergy.com.au info@beachenergy.com.au ASX release 8 October 2018 Ref: #049/18 2018 Asia Roadshow Presentation For information

  2. Slide 2: 2018 Asia Roadshow

    2018 ASIA ROADSHOW Successful transition with strong growth platform Beach Energy Limited ABN20 007 617 969 1

  3. Slide 3: Compliance Statements

    COMPLIANCE STATEMENTS Disclaimer Reserves disclosure This presentation contains forward looking statements that are subject to risk factors associated Beach prepares its petroleum reserves and contingent resources estimates in accordance with the with oil, gas and related businesses. It is believed

  4. Slide 4: Introduction

    INTRODUCTION Beach Energy Limited ABN 20 007 617 969 3

  5. Slide 5: Successful transition with strong growth platform

    SUCCESSFUL TRANSITION WITH STRONG GROWTH PLATFORM • Low cost operator focussed on synergy and margin extraction • Clear strategy to increase shareholder value Financial Market • Five year target5: Strength and Access Discipline  Production growing to 30 - 36 MMboe1  > 100% reserves replacement2 Op

  6. Slide 6: Beach Energy portfolio

    BEACH ENERGY PORTFOLIO EXPANDED FOOTPRINT WITH FIVE PRODUCTION HUBS AND SIGNIFICANT GAS PROCESSING INFRASTRUCTURE FY18 Pro forma production1 Bass Basin Cooper Taranaki Basin Basin 26.8 MMboe Otway Basin Perth Basin FY18 2P reserves2 Perth Basin Cooper Basin 313 MMboe Otway Basin 1. Pro forma FY18 de

  7. Slide 7: Experienced executive team in place

    EXPERIENCED EXECUTIVE TEAM IN PLACE Executive Role Name Commenced Experience Prior experience Chief Executive Officer Matt Kay May 2016 > 25 years Oil Search, Woodside, Santos Chief Financial Officer Morné Engelbrecht September 2016 > 18 years InterOil, Newcrest, PwC Chief Operating Officer Dawn Sum

  8. Slide 8: Beach Energy since 2016

    BEACH ENERGY SINCE 2016 THE EMERGENCE OF A LEADING MID-CAP E&P COMPANY Drillsearch merger Cost and efficiency focus Lattice acquisition • 100% ownership in ex PEL 91 • Reduction in operating costs • Expansion to five production hubs and ex PEL 106 • Western Flank oil improvement • Offshore capabilit

  9. Slide 9: Ready to unlock our reserves and cash flow potential

    READY TO UNLOCK OUR RESERVES AND CASH FLOW POTENTIAL Disciplined discretionary …driving medium term …generating > $2.6 billion investment… production growth… of free cash flow over 5 yrs CAPITAL EXPENDITURE OUTLOOK1 PRODUCTION OUTLOOK1 FREE CASH FLOW OUTLOOK1 ($ MILLION) (MMBOE) ($ MILLION) Vic Otwa

  10. Slide 10: Ready to unlock our reserves and cash flow potential

    READY TO UNLOCK OUR RESERVES AND CASH FLOW POTENTIAL Disciplined discretionary Development priorities: Development capex investment… Cooper Basin and Victoria targeting east coast gas CAPITAL INVESTMENT SPLIT DEVELOPMENT CAPEX SPLIT BY DISCRETIONARY CAPEX SPLIT BY 5 YEAR OUTLOOK1 LOCATION – 5 YEAR O

  11. Slide 11: Investment to grow production

    INVESTMENT TO GROW PRODUCTION  Over two thirds of discretionary investment to 5 year production outlook (MMboe)1 generate IRR > 40% 40  Over two thirds of discretionary oil investment to generate IRR > 100% 35 Outlook Range 30  Key variables in 5 year production outlook: Undeveloped + 2C continge

  12. Slide 12: ROCE and net gearing outlook

    ROCE AND NET GEARING OUTLOOK 5 year ROCE outlook (%)1 • ROCE improvement driven by highly Net gearing update accretive growth investment, oil prices and higher gas prices 25% • Net gearing at 30 June 2018 was 25.9% • Maintaining high ROCE requires 20% active balance sheet management • Beach forecast

  13. Slide 13: Victorian Otway asset sale

    VICTORIAN OTWAY ASSET SALE BEACH TO SELL A 40% INTEREST IN OTWAY PERMITS TO O.G. ENERGY Transaction overview • Purchaser is O.G. Energy, the energy division of Ofer Global • Sale includes interests in Otway Gas Plant, existing gas fields (Geographe, Thylacine, Halladale, Speculant, Black Watch) and

  14. Slide 14: FY19 guidance

    FY19 GUIDANCE UPDATED TO REFLECT OTWAY SALE Prior Updated Only 7% of FY19 production is FY19 production 26 – 28 MMboe 25 – 27 MMboe derived from FY19 capital expenditure. The majority of FY19 capex is driving medium FY19 capex $460 – 540 million $440 – 520 million term production growth FY19 DD&A $4

  15. Slide 15: Reserves exposed to high margin markets

    RESERVES EXPOSED TO HIGH MARGIN MARKETS Beach 2P reserves1 Future gas production Future East Coast Gas by location2 supply by sales agreement2 19 17 128 18% 42 313 1,224 PJ 677 PJ 12% MMboe 419 (210 MMboe) (116 MMboe) 677 66% 4% 236 Oil-linked GSA Origin GSA East Coast West Coast New Zealand Uncontr

  16. Slide 16: Beach to unlock reserves potential over next 5 years

    BEACH TO UNLOCK RESERVES POTENTIAL OVER NEXT 5 YEARS Beach 2P reserves1 Undeveloped 2P reserves1 Production outlook (MMboe)2 40 35 Outlook Developed 16 16 52% Range 30 12 25 Undeveloped + 2C 313 131 contingent resources + MMboe MMboe 20 risked exploration success 57 30 15 Undeveloped 10 48% 5 Develo

  17. Slide 17: Multiple avenues to replace or grow 2P reserves

    MULTIPLE AVENUES TO REPLACE OR GROW 2P RESERVES • Western Flank Oil 3P  2P 2C  2P • Cooper Basin JV • Western Flank Gas Reserve Reserve Conversion Conversion > 100% reserve replacement target1 • Cooper Basin • Otway Basin Exploration Inorganic • Perth Basin Portfolio Growth • Continuous evaluation

  18. Slide 18: Our vision, purpose and values

    OUR VISION, PURPOSE AND VALUES Our vision We aim to be Australia’s premier multi-basin upstream oil and gas company Our purpose To deliver sustainable growth in shareholder value Our values Our values define us, guide our actions, our decisions and our words Safety Safety takes precedence in everyth

  19. Slide 19: Key takeaways

    KEY TAKEAWAYS A COMPELLING FIVE YEAR OUTLOOK1 Portfolio provides growth  Production growing to 30 - 36 MMboe High return / low risk investment  Over two thirds of discretionary investment > 40% IRR2 Profitability  ROCE target 17 - 20% Free cash flow generation  Target of > $2.3 billion in cumula

  20. Slide 20: Synergy and cost efficiency targets

    SYNERGY AND COST EFFICIENCY TARGETS FOCUS TURNS TO DIRECT CONTROLLABLE OPERATING COSTS • Better than expected synergy and efficiency $ million Reduction in direct controllable opportunities have emerged post acquisition operating costs FY19-20 • Lower head count, reduce office costs, better integrat

  21. Slide 21: Financial strength and discipline

    FINANCIAL STRENGTH AND DISCIPLINE TRACK RECORD OF DELIVERY • Strong underlying EBITDA margin growth • Continuing growth in return on capital employed • Free cash flow growth and double digit free cash • 141% CAGR in underlying EPS from FY16 to flow yield FY18 • Prudent balance sheet management targe

  22. Slide 22: Oil and gas project returns

    FINANCIAL STRENGTH AND DISCIPLINE OIL AND GAS PROJECT RETURNS • > 67% all discretionary capex to Gas projects Oil projects generate IRR > 40%1 with remainder 15 15 > WACC Count of projects Count of projects 10 10 5 5 • > 67% of oil discretionary investment 0 0 to generate IRR > 100%1 Range of IRR ou

  23. Slide 23: Commodity price exposure

    FINANCIAL STRENGTH AND DISCIPLINE COMMODITY PRICE EXPOSURE • Low commodity price risk exposure with upside • Cashflow underpinned by strong long term gas contracts and repricing 18% 51% • > 60% of cashflow in FY19 from liquids exposure • Additional cashflow from potential Otway sell-down to further

  24. Slide 24: Market fundamentals

    MARKET FUNDAMENTALS Beach Energy Limited A.B.N. 20 007 617 969 23

  25. Slide 25: Key commodity market exposure

    KEY COMMODITY MARKET EXPOSURE BEACH EXPOSED TO FOUR KEY COMMODITY MARKETS Strong commodity market fundamentals, providing revenue portfolio diversity East Coast gas West Coast gas Global liquids New Zealand gas • Currently 15% of • Stable, large • 67% of FY18 • Kupe supplies market supply1 market re

  26. Slide 26: East coast gas market

    EAST COAST GAS MARKET SOUTHERN MARKETS INCREASINGLY RELIANT ON LNG SUPPLIES AEMO forecasts flat southern gas supply1 Daily South West Queensland pipeline flow2 300 Gas flow from Southern 200 states into Queensland Gas flow (TJ/d) 100 0 (100) (200) Gas flow from Queensland (300) into Southern states

  27. Slide 27: East coast gas market: potential cost of imported LNG

    EAST COAST GAS MARKET POTENTIAL COST OF IMPORTED LNG $11.50- Approximate cost (A$/GJ) of LNG into South Eastern Australia 15.75 from Asia based on range of recent spot prices GJ Henry Hub New Notional US$3.00/MMBtu Liquefaction $12.50 Approximate cost (A$/GJ) of LNG from Asia assuming long term US$2

  28. Slide 28: East coast gas market: supplying the market

    EAST COAST GAS MARKET SUPPLYING THE MARKET IS A STRATEGIC IMPERATIVE • Beach is a material owner of critical gas infrastructure • Three basins and infrastructure hubs supplying East Moomba Coast gas Gas Hub 33.4% • Currently 15% domestic market share1 • Strong demand for Beach’s uncontracted sales g

  29. Slide 29: Exposure to east coast gas prices

    EXPOSURE TO EAST COAST GAS PRICES AN ATTRACTIVE LONG-TERM PRICING OUTLOOK • Annual step-ups and CPI Current east Re-contracted / re-priced volumes2 adjustments of Lattice contracts coast volumes 100% • Majority of existing East Coast Beach volumes re-priced or average 80% 80% of current re-contracte

  30. Slide 30: West coast gas market

    WEST COAST GAS MARKET WAITSIA OPTIMALLY POSITIONED Short term: Waitsia ideally positioned to capture market: • WA domestic gas market expected to remain  Low unit cost gas balanced  Low complexity development Medium term:  Fast project execution • Declining production and reduced North West Shelf

  31. Slide 31: Global liquids market

    GLOBAL LIQUIDS MARKET PREMIUM PRODUCTS A KEY REVENUE CONTRIBUTOR FY18 revenue by product • Second largest producer of • LPG produced from Cooper, Australian oil with 14.6% of Otway, Kupe and Bass production1 • Realised average price in line • 48% of FY18 revenue from with Saudi benchmark crude oil 6

  32. Slide 32: Operational excellence

    OPERATIONAL EXCELLENCE Beach Energy Limited ABN 20 007 617 969 31

  33. Slide 33: Operational excellence

    OPERATIONAL EXCELLENCE DELIVERY OF VALUE THROUGH SAFE, RELIABLE AND EFFICIENT OPERATIONS HSE and Process and Performance People risk technology Beach Energy Limited ABN 20 007 617 969 32

  34. Slide 34: Track record of low cost Cooper Basin operations

    THE BEACH APPROACH TRACK RECORD OF LOW COST COOPER BASIN OPERATIONS  Decades of Cooper Basin experience Cooper Basin operated performance  Safe operation of over 130 oil and OIL FIELD OPERATING COSTS1 GAS FIELD OPERATING COSTS1 gas wells and multiple facilities 10 10 25 10 Operating cost ($ millio

  35. Slide 35: Our top priority: safety and environmental performance

    OUR TOP PRIORITY STRONG SAFETY AND ENVIRONMENTAL PERFORMANCE A KEY PRIORITY Safety performance1 Environmental performance1 LTIFR2 6 CRUDE SPILL VOLUMES (KL) TOTAL SPILLS 51.9 99% 32% 5.4 67% Reduction in LTIFR2 since FY13 9.6 37 25 23 25 1.6 1.8 0 0.2 0.1 FY13 FY14 FY15 FY16 FY17 FY18 FY15 FY16 FY17

  36. Slide 36: Improving base production using best practice and technology

    OPERATIONAL EXCELLENCE IMPROVING BASE PRODUCTION USING INDUSTRY BEST PRACTICE &TECHNOLOGY Productivity • Automation of steady state operations, efficient start-up and reduced downtime  Advanced Process Control  Secondary recovery • Advanced well completions and artificial lift in the Cooper Basin

  37. Slide 37: Driving a sustainable reduction in direct operating costs

    OPERATIONAL EXCELLENCE DRIVING A SUSTAINABLE REDUCTION IN DIRECT OPERATING COSTS Operating Cost • Drone technology - Offshore Platform Inspections  Advanced • Advanced Digital Radiographic techniques - CUI inspections Inspection techniques • Optimising maintenance activity, frequencies, planning, t

  38. Slide 38: Five year outlook – facility reliability

    FIVE YEAR OUTLOOK – FACILITY RELIABILITY BUILDING A FOUNDATION FOR THE FUTURE Higher operated facility …will help Beach achieve …and generate higher reliability… our production targets… revenue and production FACILITY RELIABILITY1,2 PRODUCTION OUTLOOK1 • Beach is targeting 98% facility (MMBOE) 100%

  39. Slide 39: Five year outlook – direct operating costs

    FIVE YEAR OUTLOOK – DIRECT OPERATING COSTS BUILDING A FOUNDATION FOR THE FUTURE Beach is targeting > 20% reduction in …translating to > $30 million/annum saving direct controllable operating costs1… versus FY18 pro forma levels DIRECT CONTROLLABLE OPERATING COST 175 • Beach is targeting a > 20% redu

  40. Slide 40: Operational excellence

    OPERATIONAL EXCELLENCE DELIVERY OF VALUE THROUGH SAFE, RELIABLE AND EFFICIENT OPERATIONS  Our top priority is safety  Continue to embed the Cooper Basin low cost operating model  Deliver operational excellence Reliability Operating costs 98% reliability across all operating assets Sustainable red

  41. Slide 41: Asset reviews

    ASSET REVIEWS Beach Energy Limited ABN 20 007 617 969 40

  42. Slide 42: FY19 drilling program

    FY19 DRILLING PROGRAM INCREASING FOCUS ON HORIZONTAL WELLS Drilling program expanded across the portfolio with more rigs and more wells FY19 expected participation (number of wells) Beach to participate in up to 133 wells • Up to 69 development wells and up to 64 exploration / appraisal wells Gas Oi

  43. Slide 43: Cooper Basin JV

    COOPER BASIN JV Beach Energy Limited A.B.N. 20 007 617 969 42

  44. Slide 44: Cooper Basin JV

    COOPER BASIN JV BEACH VARIOUS INTERESTS (MOST IN 30-40% RANGE), SANTOS OPERATOR • Cost reductions enable renewed focus on growth • Targeting steady to increasing production over the medium-long term (87 wells in FY19, up 36%) • Simplification of the JV from three to two partners • Review of existing

  45. Slide 45: Cooper Basin JV: improving production costs and cycle times

    COOPER BASIN JV IMPROVING PRODUCTION COSTS AND CYCLE TIMES • A 50% reduction in gas well drilling costs and 34% • A 40% reduction in drill cycle times since 2014 has improvement in unit production cost has led to a led to increased number of wells drilled per annum more efficient Cooper Basin JV and

  46. Slide 46: Cooper Basin JV: Moomba South appraisal

    COOPER BASIN JV MOOMBA SOUTH APPRAISAL • 2C  2P reserve conversion potential App F • Beach supporting Santos in appraising Patchawarra in Moomba South App I App B • Key uncertainties are reservoir App D thickness and deliverability 2 • Further calibration of geologic model 212 which predicts increa

  47. Slide 47: Watkins/Watson North – new opportunities in an old field

    COOPER BASIN JV WATKINS/WATSON NORTH – NEW OPPORTUNITIES IN AN OLD FIELD • Example of oil potential in CBJV and collaboration between JV partners • Field reviews in late 2017 identified immediate drilling opportunities in Watkins/Watson North • Net pay was 100% more than pre-drill expectations and a

  48. Slide 48: Cooper Basin JV: efficiency has created a growth story

    COOPER BASIN JV EFFICIENCY HAS CREATED A GROWTH STORY • Operator targeting steady to increasing Activities to enhance value 5 year contribution to Beach1 production levels for next decade • Increased drilling activity to 28-33% facilitate renewed focus on • Strong focus on controlling costs appraisa

  49. Slide 49: Victorian Otway Basin

    VICTORIAN OTWAY BASIN Beach Energy Limited ABN 20 007 617 969 48

  50. Slide 50: Victorian Otway Basin

    VICTORIAN OTWAY 1 BASIN BEACH 60% AND OPERATOR • Liquids-rich, long-life asset with low risk 2P reserves1 by product exploration and development opportunities (MMboe) 5 6 • Multi-year, nine-well programme commencing in H2 FY19 with undeveloped reserves and exploration prospects 75 MMboe • 205 TJ/d O

  51. Slide 51: Victorian Otway Basin: production

    VICTORIAN OTWAY BASIN PRODUCTION • Nine drilling opportunities planned in the next four OGP production outlook (100% interest) years to keep the Otway Gas Plant (OGP) as full as possible until FY26. Project life > 15 years • Start with lowest cost onshore-to-offshore, 60 Extended Reach Directional (

  52. Slide 52: Two extended reach directional wells

    VICTORIAN OTWAY BASIN TWO EXTENDED REACH DIRECTIONAL WELLS TO BE DRILLED FY19 TO FY20 • Two ERD wells drilled from onshore to offshore • Program starts with Blackwatch-1 development well in late FY19, followed by Enterprise-1 exploration well • ERD wells allow accelerated hook-up and early productio

  53. Slide 53: Victorian Otway Basin: indicative timeline

    VICTORIAN OTWAY 1 BASIN INDICATIVE TIMELINE • Phased development with high impact, FY19 FY20 FY21 FY22 low unit technical cost exploration/development up front Black Watch (development) • Early exposure to uncontracted gas with Enterprise low risk exploration success (exploration) • ERD wells, lower

  54. Slide 54: Key asset with large contribution to Beach

    VICTORIAN OTWAY BASIN KEY ASSET WITH LARGE CONTRIBUTION TO BEACH • Long-life asset Activities to enhance value 5 year contribution to Beach1,2 • Optimise rig contracting strategy 18-23% • Investing capital in undeveloped to mitigate risk of future day rate reserves and low risk exploration inflation

  55. Slide 55: South Australian Otway Basin

    SOUTH AUSTRALIAN OTWAY BASIN Beach Energy Limited ABN 20 007 617 969 54

  56. Slide 56: South Australian Otway Basin

    SOUTH AUSTRALIAN OTWAY BASIN BEACH INTERESTS 70 – 100% AND OPERATOR • Reinvigorated area of business with FY18 Haselgrove discovery (15 MMboe 2C contingent resource) • Attractive local gas market gas demand • Supported in part by state and federal grants • Key objective is conversion of the continge

  57. Slide 57: South Australian Otway Basin: indicative timeline

    SOUTH AUSTRALIAN 1 OTWAY BASIN INDICATIVE TIMELINE • Beach planning first gas to FY19 FY20 FY21 FY22 FY23 market by end of 2019 (H1 Katnook facility FY20) (design and build) • Katnook processing facility Dombey-1 concept select studies are (exploration) underway Haselgrove-4 (appraisal) • Haselgrove

  58. Slide 58: Perth Basin

    PERTH BASIN Beach Energy Limited ABN 20 007 617 969 57

  59. Slide 59: Perth Basin: Waitsia and Beharra Springs

    PERTH BASIN WAITSIA (BEACH 50%), BEHARRA SPRINGS (BEACH 67% AND OPERATOR) 2P reserves by product • Waitsia is a high quality, low cost (MMboe) gas resource 0 • Multiple commercialisation options 72 MMboe being evaluated with operator Mitsui 72 Gas Condensate • Working with Mitsui to deliver 2P devel

  60. Slide 60: Waitsia gas commercialisation

    PERTH BASIN WAITSIA GAS COMMERCIALISATION • Joint Venture is evaluating a number of commercialisation options, including: - existing gas customers - potential new domestic gas customers (including mining and petrochemical companies) - potential export opportunities • Targeting a development decision

  61. Slide 61: Perth Basin: Kingia play opening

    PERTH BASIN KINGIA PLAY OPENING Perth Basin gas discoveries over time1 • Waitsia appraisal result is a game changer for the Perth Basin 180 320 • Opened up the Kingia / High Cliff play, a Cumulative EUR (MMboe) new, deeper play with significant upside 120 potential EUR (MMboe) 160 • Multiple prospec

  62. Slide 62: Beharra Springs Deep prospect

    PERTH BASIN BEHARRA SPRINGS DEEP PROSPECT (BEACH 67% INTEREST) Multiple material deep pool tests and potential for stacked gas pools as seen at Waitsia Beach Energy Limited ABN 20 007 617 969 61

  63. Slide 63: Western Flank

    WESTERN FLANK Beach Energy Limited ABN 20 007 617 969 62

  64. Slide 64: Western Flank oil

    WESTERN FLANK OIL BEACH OPERATED INTERESTS 75 - 100%, NON-OPERATED 40%, SENEX OPERATOR 2P reserves by product • Material part of Beach’s portfolio (MMboe) • Provides significant oil price exposure 34 MMboe • Value accretive near term development opportunities Oil - Material appraisal and development

  65. Slide 65: Bauer appraisal program

    WESTERN FLANK OIL BAUER APPRAISAL PROGRAM • Bauer field limit appraisal and development in FY19 • Two vertical development wells to obtain critical data for modelling and four McKinlay horizontal wells for production • Four appraisal wells to test field limits • Follow up horizontal drilling to be p

  66. Slide 66: Rollout the Bauer strategy across the Western Flank

    WESTERN FLANK OIL ROLLOUT THE “BAUER STRATEGY” ACROSS THE WESTERN FLANK • Appraisal and development planning underway for multiple fields Kangaroo App planning underway • Significant upside in McKinlay, Namur and Birkhead Kalladeina/Congony reservoirs from this approach App/Dev planning underway Pen

  67. Slide 67: Reserves growth has exceeded expectations

    WESTERN FLANK OIL RESERVES GROWTH HAS EXCEEDED EXPECTATIONS • Western Flank 2P oil reserves: Beach Western Flank Oil 2P reserve life1 - More than doubled over the past 3 years 8 6 7.2 - Reserves life now > 7 years 5 Annual production (MMbbl) 2P oil reserves life (years) • 2P reserves increase underp

  68. Slide 68: Application of horizontal well technology

    WESTERN FLANK OIL APPLICATION OF HORIZONTAL WELL TECHNOLOGY • Strong economic metrics have always been a Comparison of vertical and horizontal wells1 competitive advantage for the Western Flank Oil assets 2,500 Actual Birkhead horizontal typewell Actual McKinlay horizontal typewell McKinlay horizont

  69. Slide 69: High margin asset with more to give

    WESTERN FLANK OIL HIGH MARGIN ASSET WITH MORE TO GIVE • Significant contributor of free cash Activities to enhance value 5 year contribution to Beach1 flow due to high margin production • Appraisal of lateral extent of Bauer 18-23% and similar oil fields • Capital program is designed to fully PRODUC

  70. Slide 70: Western Flank gas

    WESTERN FLANK GAS PRODUCING ASSETS EX PEL 106 AND EX PEL 91, BEACH 100% AND OPERATOR 2P reserves by product • A recent growth story (MMboe) 2 • Liquids rich gas play with access to East Coast gas market through 2 9 MMboe Moomba gas plant 6 • Asset spans development, Gas Condensate LPG appraisal and

  71. Slide 71: Middleton gas facility

    WESTERN FLANK GAS MIDDLETON GAS FACILITY • Continued drilling success has allowed expansion from 25 to 40 MMscfd production capacity Middleton area raw gas rate1 50 'Loop' line installed Middleton compressors Installation of the ‘loop’ line from Middleton to Moonanga Middleton ~40mmscfd compression

  72. Slide 72: Western Flank gas: exploration and development

    WESTERN FLANK GAS EXPLORATION AND DEVELOPMENT • Drilling program to support objective of long term stable production out of Middleton • Eight gas wells planned for FY19 (appraisal and exploration) - Appraisal to convert 3P reserves to 2P reserves • Future development drilling in the core Middleton,

  73. Slide 73: Western Flank gas: growth story

    WESTERN FLANK GAS GROWTH STORY • Capital program designed to maintain Activities to enhance value 5 year contribution to Beach1 Middleton raw gas at 40MMscfd 5-9% • Appraisal of existing gas discoveries for 2P reserves upside • Key variables to outlook include: PRODUCTION • Prospects arising from th

  74. Slide 74: Bass Basin

    BASS BASIN Beach Energy Limited ABN 20 007 617 969 73

  75. Slide 75: Bass Basin

    BASS BASIN BEACH 53.75% PRODUCING ASSETS, 50.25% NON-PRODUCING, BEACH OPERATED 2P reserves by product • BassGas is a mature asset (MMboe) servicing the east coast gas 1 market 1 9 MMboe • Beach objectives are to minimise operating costs, maximise 7 productivity and extend field life Gas Condensate L

  76. Slide 76: New Zealand

    NEW ZEALAND Beach Energy Limited ABN 20 007 617 969 75

  77. Slide 77: New Zealand – Kupe gas project

    NEW ZEALAND – KUPE GAS PROJECT BEACH 50% AND OPERATOR 2P reserves by product • Stable, solid free cash flow (MMboe) generating asset 5 3 • Important to New Zealand gas and 30 MMboe LPG supply 22 • Low risk compression Gas Condensate LPG development project to maintain 2P developed / undeveloped medi

  78. Slide 78: Kupe gas plant

    NEW ZEALAND – KUPE GAS PROJECT KUPE GAS PLANT • Nameplate capacity of the plant is 77 TJ/day with Kupe sales gas production outlook1 (gross) excellent reliability (> 99%)2 25 • Gas exported via pipeline to North Island distribution network 20 15 • Condensate transported via road and shipped PJ inter

  79. Slide 79: Description of field

    NEW ZEALAND – KUPE GAS PROJECT DESCRIPTION OF FIELD • Kupe developed by three wells • Valuable liquids-rich gas produced • Compression project working towards FID in early FY20 - Low risk, high value to extend production plateau and field life • Possible that no further wells required to drain the f

  80. Slide 80: Kupe: key group cash flow contributor

    NEW ZEALAND – KUPE GAS PROJECT KEY GROUP CASH FLOW CONTRIBUTOR Activities to enhance value 5 year contribution to Beach1 • Expected to generate ~10% of Beach’s 6-11% free cash flow over the next 5 years • Successful FEED and subsequent execution of Kupe compression • Key variables to outlook include

  81. Slide 81: Frontier exploration

    FRONTIER EXPLORATION Beach Energy Limited ABN 20 007 617 969 80

  82. Slide 82: High impact exploration targets in portfolio

    FRONTIER EXPLORATION HIGH IMPACT EXPLORATION TARGETS IN PORTFOLIO Carnarvon Basin • Key Prospect: WA-359-P / Ironbark Bonaparte Basin • Three exploration permits, two with Santos as JV partner • Gas-condensate-oil, multiple plays • Key Prospects: Breakwater, Marina Deep, Corona Canterbury Basin • Tw

  83. Slide 83: Bonaparte Basin: Northern Area – Malita Graben

    BONAPARTE BASIN NORTHERN AREA – MALITA GRABEN • Beach holds five permits in the Bonaparte Basin covering two main exploration play trends: - Northern Area - Malita Graben; and - Southern Area - Petrel Sub-Basin Northern Area – Malita Graben (Beach 50%, Santos 50% op) • Exploration permit close to ex

  84. Slide 84: Bonaparte Basin: Southern Area – Petrel Sub-Basin

    BONAPARTE BASIN SOUTHERN AREA – PETREL SUB-BASIN Southern Area – Petrel Sub-basin • Two large Beach-operated exploration permits; WA-454-P (100% Beach) and NT/P84 (Beach 50%, Santos 50%) • Features multiple prospects and leads • Gas, gas-liquids and oil potential close to existing infrastructure • F

  85. Slide 85: Carnarvon Basin: Ironbark prospect

    CARNARVON BASIN IRONBARK PROSPECT Ironbark Prospect1 (WA-359-P Beach 21%, subject to farm-in; WA-409-P Beach 7.5% subject to farm-in) • Potential high-impact gas resource within tie-back distance to the NWS project. Targeting the deeper Mungaroo reservoirs, which are the primary reservoirs at Gorgon

  86. Slide 86: Canterbury Basin: large prospective resource potential

    CANTERBURY BASIN LARGE PROSPECTIVE RESOURCE POTENTIAL Canterbury Basin (Barque, Beach 50%; Wherry and Gondola, Beach 65%) Wherry prospect • Three multi-Tcf plus liquids prospects1 • Proven hydrocarbon system with high liquids content • Wherry is the likely first-drill prospect • Sits within Beach-op

  87. Slide 87: Appendices

    APPENDICES Beach Energy Limited A.B.N. 20 007 617 969 86

  88. Slide 88: FY19 oil hedging position

    FY19 OIL HEDGING POSITION OIL HEDGES AS AT 1 JULY 2018 3-way Collar 3-way Collar 3-way Collar 3-way Collar Total Hedged $40 – 90 –105 $40 – 90 – 100 $40 – 103 – 113 $55 – 100 – 110 Volumes (bbl) per bbl per bbl per bbl per bbl FY19 285,000 577,500 630,000 3,435,000 4,927,500 Total 285,000 577,500 63

  89. Slide 89: Asia Roadshow

    2018 ASIA ROADSHOW Beach Energy Limited Investor Relations 25 Conyngham Street Nik Burns, Investor Relations Manager Glenside SA 5065 Australia Mark Hollis, Investor Relations Advisor T: +61 8 8338 2833 T: +61 8 8338 2833 F: +61 8 8338 2336 beachenergy.com.au Beach Energy Limited ABN 20 007 617 969

Beach Energy — Non-Deal Roadshow (October 2018) on 6ix