  1. Slide 1: WG Belgian Grid

    WG Belgian Grid 28/01/2022

  2. Slide 2: Toegangscontract

    TOEGANGSCONTRACT 0 FB”

  3. Slide 3: Agenda

    Agenda 1. Revisie toegangscontract 2.Proces aansluitingscontract 0 FB” 3

  4. Slide 4: Toegangscontract - voorafgaand

    Toegangscontract - voorafgaand Voorafgaand: Begin 09/2021: einde consultatie toegangscontract 11/2021: consultatierapport beschikbaar en besproken op BG Midden 12/2021: opmerkingen regulatoren ontvangen (inclusief vraag CREG versnelde DROP) Midden 01/2022: opmerkingen regulatoren verwerkt Huidige st

  5. Slide 5: Mogelijke planning — optie A: geen formele consultatie

    Mogelijke planning — optie A: geen formele consultatie 11/03/2022 Indiening contract 10/12/2021 - 25/01/2022 Verwerking opmerkingen regulatoren 25/02/2022 - 11/03/202} 26/01/2022 - 04/02/2022 2W - Elia verwerkt opmerkiggen Vertalingen/lay-out (bilateraal overleg indien nddig) 01/02/202! 01/03/2022 0

  6. Slide 6: Mogelijke planning — optie B: formele consultatie

    Mogelijke planning — optie B: formele consultatie 10/12/2021 - 25/01/2022 Verwerking opmerkingen regulatoren 26/01/2022 - 04/02/2022 Vertalingen/lay out 04/04/2022 Indiening contract 04/03/2022 - 01/04/2022 4W - Elia verwerkt opmerkingen + consultatlerapport 01/02/202, 01/03/202b 01/04/2022 01/01/20

  7. Slide 7: Aansluitingscontract

    AANSLUITINGSCONTRACT 0 FB”

  8. Slide 8: Connection Contract: general objectives of the revision

    Connection Contract: general objectives of the revision Compliance with: EU Network Codes (DCC, RfG & E&R); EU Guidelines (CACM & SOGL); Federal Grid Code (and CREG Code of Conduct, if applicable); Regional Grid Codes, where applicable; and Applicable Belgian legislation / regulation (e.g. E law, ta

  9. Slide 9: Proposed timeline - General

    Proposed timeline - General Feedback market players on draft Part 1 & Part 2 required Public consultation 1 2 1+2 Remark: Additional meetings with Elia new text proposal (Part 1, Part 2, and the regulators might be needed both Parts) (depending on the extent of the Dates of meetings proposed modific

  10. Slide 10: Proposed timeline for sharing drafts and receiving feedback

    Proposed timeline for sharing drafts and receiving feedback Second week Feb 2022: sharing draft of first part of the TARGET JUNE: 1. revised Connection Contract (Definitions + General 1. Conditions) draft (parts 1+2) incorporating Feb-March 2022: market players to review first part and market player