Quebec Precious Metals Corporation

Quebec Precious Metals — Investor Presentation (April 2020)

44 slides from Quebec Precious Metals's investor presentation, April 2020

  1. Slide 1: Corporate Presentation April 2020

    TSX-V: CJC TSX-V: CJC OTCQB: CJCFF CORPORATE PRESENTATION April 2020

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements This document contains forward-looking statements that reflect the company's current expectations regarding future events. To the extent that any statements in this document contain information that is not historical, the statements are essentially forward-looking and are

  3. Slide 3: Company Overview

    Company Overview ⌳ June 2018 creation of a NEW GOLD EXPLORER in the James Bay region of Quebec ⌳ Gold consolidation strategy combining GOLD ASSETS FROM THREE COMPANIES listed on the TSX Venture ⌳ STRATEGIC INVESTOR, ⌳ HIGHLY PROSPECTIVE LAND NEWMONT CORPORATION who operates PACKAGE (1,100 km2) locat

  4. Slide 4: Strong Shareholder Support

    Strong Shareholder Support AS APRIL 23, 2020 Closing price $0.225 Market cap $15 M Approximate cash position $4.8 M Shares outstanding 67,434,334 Options @ $0.235 to $0.624 4,455,385 Warrants @ $0.85 exp. 27/06/2020 4,445,331 Broker warrants @ $0.30 exp. 29/11/2021 1,210,863 Price KEY SHAREHOLDERS V

  5. Slide 5: James Bay Region – Sakami Project and Éléonore Mine

    James Bay Region – Sakami Project and Éléonore Mine TSX-V: CJC | 5

  6. Slide 6: Proven Team and Board

    Proven Team and Board MANAGEMENT BOARD OF DIRECTORS Normand Champigny, Chief Executive Officer INDEPENDENT Professional geological engineer with extensive experience John W.W. Hick, Chairperson* across all facets of the mining and mineral exploration industry, Mario Caron, P. Eng.* both domestically

  7. Slide 7: Focused Operation Plan – 12 Months

    Focused Operation Plan – 12 Months Q1 2020 Q2 2020 Q3 2020 Q4 2020 Review previous results on Sakami and James Bay region Drill 25,000 m at Sakami for resource estimate, other targets Prepare Sakami mineral resource estimate Monetize non-core assets * Ongoing – Open to more gold projects for acquisi

  8. Slide 8: James Bay Region – Comparable to Abitibi Gold Mining Camp

    James Bay Region – Comparable to Abitibi Gold Mining Camp ⌳ WELL-DEVELOPED INFRASTRUCTURE ⌳ PROXIMITY TO THE ÉLÉONORE MINE ⌳ ACCESS TO HYDRO-ELECTRIC POWER ⌳ ENGAGEMENT WITH LOCAL CREE COMMUNITIES SAKAMI PROJECT ÉLÉONORE MINE CADILLAC BREAK Rouyn- 38,334 drillholes 1,824 drillholes in Noranda Val d’

  9. Slide 9: Company Project – Portfolio

    Company Project – Portfolio TSX-V: CJC | 9

  10. Slide 10: James Bay Region – Gold Camps Comparison and Potential

    James Bay Region – Gold Camps Comparison and Potential ⌳ James Bay Remains Underexplored when Compared to more Established Canadian Gold Camps Historical Gold Production + Resources 80 (millions of oz Au) – 2017 data 70 60 50 40 30 20 10 0 Timmins Kirkland Val d'Or Hemlo Red Lake Noranda Detour Jame

  11. Slide 11: Sakami Project

    Sakami Project Chisasibi (150km) Wemindji (130km) Radisson (80km) La Pointe Sakami Lake TSX-V: CJC | 11

  12. Slide 12: Sakami Project

    Sakami Project 23 km long favourable geological contact TSX-V: CJC | 12

  13. Slide 13: Sakami Project

    Sakami Project ⌳ LA POINTE DEPOSIT surface discovery, drilled over 900 m on strike and 600 m at depth ⌳ New discovery LA POINTE EXTENSION, extending LA POINTE potential over 3 km ⌳ YEAR ROUND ACCESS for drilling with 2 drills on-site and 3 camps ⌳ 23 km along the contact between established sediment

  14. Slide 14: Sakami Project – La Pointe Deposit: Plan Update

    Sakami Project – La Pointe Deposit: Plan Update PT-18-120 PT-18-118 OPEN PT-18-116 TSX-V: CJC | 14

  15. Slide 15: Sakami Project – La Pointe Deposit: Vertical Section Update

    Sakami Project – La Pointe Deposit: Vertical Section Update ⌳ LA POINTE DEPOSIT: North South ▪ 106 diamond drill holes intercepted the deposit ▪ 40,877 m drilled to date ▪ Drilling over 900 m length, down-plunge from surface to 600 m, open in all directions ▪ Significant gold grades between 20 to 80

  16. Slide 16: Sakami Project – La Pointe Extension Discovery

    Sakami Project – La Pointe Extension Discovery TSX-V: CJC | 16

  17. Slide 17: Sakami Project – La Pointe and La Pointe Extension

    Sakami Project – La Pointe and La Pointe Extension TSX-V: CJC | 17

  18. Slide 18: Sakami Project – La Pointe and La Pointe Extension

    Sakami Project – La Pointe and La Pointe Extension TSX-V: CJC | 18

  19. Slide 19: Sakami Project – La Pointe Deposit: Geology

    Sakami Project – La Pointe Deposit: Geology TSX-V: CJC | 19

  20. Slide 20: Sakami Project – Simon and JR Discoveries up to 8 km NE of La Pointe

    Sakami Project – Simon and JR Discoveries up to 8 km NE of La Pointe Deposit TSX-V: CJC | 20

  21. Slide 21: Sakami Project – Simon Discovery

    Sakami Project – Simon Discovery ⌳ 4 holes intercepted gold mineralization ⌳ Geology contains an iron formation ⌳ 908 m drilled to date ⌳ Open in all directions ⌳ 4 km strike potential ⌳ 2020 winter drilling – 1,745 m, 11 holes 2019 DRILL RESULTS SI-19-01 3.68 g/t Au over 2.07 m SI-19-02 14.20 g/t A

  22. Slide 22: Sakami Project – JR New Discovery

    Sakami Project – JR New Discovery ⌳ 6 holes intercepted gold mineralization ⌳ Geology contains an iron formation ⌳ 2,257 m drilled to date ⌳ Open in all directions 2019 DRILL RESULTS JR-19-01 1.03 g/t over 2.50 m 0.59 g/t over 6.20 m 1.10 g/t over 9.00 m JR-19-02 0.72 g/t over 6.90 m 1.23 g/t over 5

  23. Slide 23: Elmer East – 2020 Plan

    Elmer East – 2020 Plan ⌳ Along trend with Azimut’s discovery ⌳ Airborne survey completed in early 2020 ⌳ Planning underway to start surface work in June TSX-V: CJC | 23

  24. Slide 24: Why Invest in QPM?

    Why Invest in QPM? TIMELY EXPLORATION AND DRILL STRATEGIC INVESTOR, RESULTS news flow from flagship NEWMONT CORPORATION, is part of the Sakami project aimed at rapidly solid shareholder base including advancing to the mineral resource Québec institutions estimate stage Proven successes by MANAGEMENT

  25. Slide 25: Contact details

    Normand Champigny Jean-François Meilleur Chief Executive Officer President T: 514-979-4746 T: 514-951-2730 E: nchampigny@qpmcorp.ca E: jfmeilleur@qpmcorp.ca 1080, Côte du Beaver Hall, Suite 2101, Montreal, Quebec H2Z 1S8 www.qpmcorp.ca

  26. Slide 26: Appendix

    TSX-V: CJC APPENDIX TSX-V: CJC | 26

  27. Slide 27: Appendix – Management and Directors

    Appendix – Management and Directors Normand Champigny, Chief Executive Officer Jean-François Meilleur, President Mr. Champigny is a geological engineer with extensive experience with both Mr. Meilleur was President and Chief Executive Officer of the Company public and private companies, both domesti

  28. Slide 28: Appendix – Independent Directors

    Appendix – Independent Directors John W.W. Hick, Chairman Charles Main, Director John W. W. Hick, B.A., LL.B, has over 37 years of experience in the mining Mr. Main brings over 30 years of experience in the mining and finance industries, industry in both senior management positions and as an indepen

  29. Slide 29: Appendix – Technical Team

    Appendix – Technical Team Tony Brisson, Senior Exploration Manager Tony Brisson has 25 years of experience in gold and base metals exploration, including senior positions with gold exploration companies in Quebec. From 2012 to 2015, he was the exploration manager at the Éléonore gold mine. His respo

  30. Slide 30: QPM Discovery Cycle

    QPM Discovery Cycle QPM is following the same the discovery cycle as Quebec’s two most recent successful gold discovery stories: Virginia and Osisko VIRGINIA GOLD MINES INC. OSISKO EXPLORATION LTD. 2004 2006 Mine Discovery Mine Discovery Virginia Gold Mines Osisko Exploration Ltd. ⌳ 1986 – Virginia

  31. Slide 31: Addendum – Available Non-Core Assets

    TSX-V: CJC ADDENDUM – AVAILABLE NON-CORE ASSETS TSX-V: CJC | 31

  32. Slide 32: James Bay Region

    James Bay Region TSX-V: CJC | 32

  33. Slide 33: Elmer East 100% Owned

    Elmer East 100% Owned TSX-V: CJC | 33

  34. Slide 34: Elmer East 100% Owned, cont’d

    Elmer East 100% Owned, cont’d Location and Access Quebec, Canada Azimut Exploration recently announced several significant gold- bearing drill intercepts at the Patwon prospect, namely 3.15 g/t Au 40 to 80 km southwest of the Éléonore mine and close over 102.0 m, including 10.1 g/t Au over 20.5 m. T

  35. Slide 35: Blanche and Charles 100% Owned

    Blanche and Charles 100% Owned TSX-V: CJC | 35

  36. Slide 36: Blanche and Charles 100% Owned, cont’d

    Blanche and Charles 100% Owned, cont’d Location and Access Québec, Canada BHP Billiton Canada Inc. has recently made an investment of $5.9 M in Midland to fund drilling of the Mythril discovery. 120 to 150 km northeast of the Éléonore gold mine, Eeyou Istchee James Bay Territory of Québec. Work to D

  37. Slide 37: Chemin Troïlus 100% Owned

    Chemin Troïlus 100% Owned TSX-V: CJC | 37

  38. Slide 38: Chemin Troïlus 100% Owned, cont’d

    Chemin Troïlus 100% Owned, cont’d Location and Access Québec, Canada Work to Date 110 km north-northeast of the town of Chibougamau Acquired following prospecting discovery of numerous with good road access. mineralized boulders carrying gold values from 0.3 to 1.57 g/t Au the Troïlus Gold Corridor.

  39. Slide 39: Kipawa 68% Owned, Zeus 100% Owned

    Kipawa 68% Owned (32% Investissement Québec) Zeus 100% Owned TSX-V: CJC | 39

  40. Slide 40: Kipawa 68% Owned, Zeus 100% Owned, cont’d

    Kipawa 68% Owned (32% Investissement Québec) Zeus 100% Owned, cont’d Location and Access Québec, Canada The Kipawa deposit is defined by three enriched horizons within the “Syenite Complex”, which contains some light rare earth oxides but 50 km east of Temiscaming in southwestern Québec, primarily h

  41. Slide 41: Vulcain 100% Owned

    Vulcain 100% Owned TSX-V: CJC | 41

  42. Slide 42: Vulcain 100% Owned, cont’d

    Vulcain 100% Owned, cont’d Location and Access Québec, Canada Independent NI 43-101 compliant estimate: Indicated resources of 0.092 million tonnes at 0.65% nickel and Located in Haute-Gatineau, 165 km southeast of Val d’Or 0.63% copper, and Indicated resources of 0.51 million and 280 km northwest o

  43. Slide 43: Matheson Joint Venture 50% Owned

    Matheson Joint Venture 50% Owned TSX-V: CJC | 43

  44. Slide 44: Matheson Joint Venture 50% Owned, cont’d

    Matheson Joint Venture 50% Owned, cont’d Location and Access Ontario, Québec, Canada Work to Date Located in Matheson Township, Porcupine Mining District, Three higher potential corridors have been identified based northeastern Ontario, approximately 24 km from the Timmins on favourable volcanic lit

Quebec Precious Metals — Investor Presentation (April 2020) on 6ix