  1. Slide 1: RMB Morgan Stanley Big Five Conference

    RMB Morgan Stanley Big Five Conference Cape Town 27 September 2017

  2. Slide 2: Value creation through the Maseve acquisition

    Value creation through the Maseve acquisition • Strategic fit • Value accretive through operational and commercial synergies • Capital efficient • Enhanced operational flexibility and opportunities Four pillars of the RBPlat strategy RMB Morgan Stanley – Big 5 Conference - September 2017 2

  3. Slide 3: Geographical synergy with the BRPM JV

    Geographical synergy with the BRPM JV MASEVE ACQUISITION • Adjacent to Styldrift I • Two declines from surface • 110ktpm concentrator • Associated mine infrastructure RMB Morgan Stanley – Big 5 Conference - September 2017 3

  4. Slide 4: Maseve plant represents operational synergies and flexibility

    Maseve plant represents operational synergies and flexibility The Maseve plant is based on best practice PGM concentrating design  Current operating design:  Potential to upgrade to increase throughput  110ktpm capacity and improve recoveries  MF1 configuration  160ktpm capacity  Potential inh

  5. Slide 5: Proposed ore delivery to Maseve

    Proposed ore delivery to Maseve STYLDRIFT MINE Maseve concentrator Overland belt to Maseve RMB Morgan Stanley – Big 5 Conference - September 2017 5

  6. Slide 6: Potential for early access into Frischgewaagd through Maseve decline infrastructure

    Potential for early access into Frischgewaagd through Maseve decline infrastructure North shaft portal South shaft portal RMB Morgan Stanley – Big 5 Conference - September 2017 6

  7. Slide 7: Opportunities for RBPlat from the Maseve acquisition

    Opportunities for RBPlat from the Maseve acquisition Immediate access to additional plant capacity • Increasing Styldrift from 150ktpm to 230ktpm Extend the life of South shaft Maseve plant • While Styldrift ramps up, plant can treat South shaft Merensky • Extends South shaft life by 12-18 months Im

  8. Slide 8: On the 6th of September RBPlat announced the Maseve transaction

    On the 6th of September RBPlat announced the Maseve transaction Maseve plant Plant transaction • Concentrator plant • Tailings infrastructure – Due diligence – Competition commission approval USD58 million • Surface rights for purposes of operating the plant • Power and water allocation + Maseve min

  9. Slide 9: Conclusion

    Conclusion The acquisition of the Maseve operation and its associated infrastructure places RBPlat in a position to: • Expand Styldrift production to 230ktpm • Continue mining Merensky reef at South shaft for an additional 12-18 months • Unlock opportunity for early access to the Frischgewaagd orebo