Oxford Innotech Bhd. · MYX:OXB
Oxford Innotech Bhd — FY2025 Earnings Presentation
18 slides from Oxford Innotech Bhd's earnings presentation, Mar 2, 2026
Slide 1: 4Q/Full Year FY25 Results Briefing
4Q/Full Year FY25 Results Briefing 2 March 2026 1 1
Slide 2: Disclaimer
Disclaimer • This presentation may contain forward-looking statements. All statements other than statements of historical facts contained in this presentation including, without limitation, those regarding our financial position, business strategies, plans and objectives of Oxford Innotech Berhad an
Slide 3: Optimising opportunities and eXtending Boundaries
An integrated engineering solutions provider, specialising in: • Precision Engineering Components Solutions Fabricate sheet metal and CNC-machined components, as well as plastic injection moulded products. Optimising opportunities and eXtending Boundaries • Mechanical Assembly Solutions Design and m
Slide 4: Key Achievements and Milestones
Key Achievements and Milestones 2002 - 2008 2011 - 2015 2018 - 2022 A Humble Beginning Fortifying Position Invest for Growth Expanded into Founded in 2002, CG Expanded into sheet manufacturing of 2025 - 2026 Solutions supplied metal fabrication and precision engineering industrial products to plasti
Slide 5: Shareholding & Corporate Structure as at January 2026
Shareholding & Corporate Structure as at 31 January 2026 Promoters and major shareholders continue to hold a 62.8%-stake post listing. Institutional Public Ng Thean Gin Lee Lai Chan Teh Teng Wah Oh Yen San shareholders shareholders 29.6% 14.7% 11.2% 7.3% 11.9% 25.3% 100.0% 100.0% 100.0% 100.0% 100.0
Slide 6: Financials – Results Review
7 Financials – Results Review 6
Slide 7: 4QFY25 Financials Overview
4QFY25 Financials Overview RM’m (FYE Dec) 1QFY25 2QFY25 3QFY25 4QFY25 FY25 4QFY25 vs 3QFY25 Revenue 19.5 17.1 13.9 12.7 63.2 • Lower revenue due to reduced contribution from customers in GP 6.8 4.9 4.7 3.9 20.4 the construction industry. PAT 3.2 1.6 1.2 1.0 7.1 • 4QFY25 GP margin and adjusted PAT ma
Slide 8: Revenue Breakdown by Business Segments
Revenue Breakdown by Business Segments Mechanical Engineering Assembly Solutions remained the main contributor in FY25 RM5.2m RM2.0m 5.6% 3.1% RM44.7m RM26.9m 48.2% 42.6% FY24 FY25 RM92.9m RM63.2m RM43.0m RM34.3m 46.2% 54.3% Precision Engineering Components Solutions Mechanical Assembly Solutions Au
Slide 9: Solid Balance Sheet Position
Solid Balance Sheet Position RM’m (FYE Dec) FY24 FY25 (audited) (unaudited) TOTAL ASSETS 138.5 168.0 Higher cash balance following IPO proceeds post listing. Cash and cash equivalents 13.3 54.6 TOTAL LIABILITIES 58.4 40.7 Reduced total liabilities primarily due to lower trade and other payables. Tot
Slide 10: IPO Proceeds to Drive Next Phase of Growth
IPO Proceeds to Drive Next Phase of Growth Strengthening our capacities and capabilities to undertake more projects Actual Balance to be Purpose Proposed Utilisation Utilisation Utilised Utilisation of proceeds @ 25 Feb 2026 RM’m % RM’m RM’m Construction of a new factory 23.1 55.5 - 23.1 Purchase/re
Slide 11: Business Updates & Outlook
Business Updates 7 & Outlook 11
Slide 12: Strategic Entry - Data Centre Segment
Strategic Entry - Data Centre (“DC”) Segment Jan-Feb’26: OXB has secured 2 contracts totalling RM9.6m, 1st LOA: RM4.8m on 21 Jan 2026 to supply critical steel structures & accompanying precision metal 2nd LOA: RM4.8m on 5 Feb 2026 components for advanced DC airflow management solution. Our Client Ma
Slide 13: How did we penetrate into DC segment?
How did we penetrate into DC segment? Key Enabler – Large Format Tube Laser Cutting Machine In 2025, we foresaw there is a need for high precision infrastructure components through interactions with our key customers. Hence, we acquired the Large Format Tube Laser Cutting Machine to address the anti
Slide 14: Positive Progress in First Article Inspection Report Approvals
Positive Progress in First Article Inspection Report (“FAIR”) First Article Inspection Reports (FAIRs) Approvals 33.5% 65.9% 80.3% Approved parts increased from 177 in Aug-25 % of total approved parts to 620 in Dec-25. Pending approvals 772 Total approved 640 152 Half of the approvals have since gon
Slide 15: Other Key Developments
Other Key Developments Order backlog (RM‘m) Our staff force as of Dec 2025 21.0 18.8 Total* 262 264 258 257 256 13.8 14.7 Engineers 20 23 21 21 22 Production 174 168 162 162 160 Mar-25 Jun-25 Sept-25 Dec-25 Admin 68 73 75 74 74 Rising order backlog driven by mass Dec-24 Mar-25 Jun-25 Sept-25 Dec-25
Slide 16: Other Key Developments (cont.)
Other Key Developments Sustained Project Pipeline at SIBS: (cont.) ✓ Sweden: Stable activity with thousands of apartments in development. ✓ UK: 1st project in Basildon underway and secured 2nd order in Edinburgh for Student Housing Project. ✓ Australia: First hotel construction project, expected to
Slide 17: Building Momentum for Growth
Building Momentum for Growth Data Centre Semiconductor MBS • Current awards cover 2 out of • Positive progress in FAIR • Steady progress supported 4 sections across 3 DCs in the approvals. by sustained project Klang Valley. Approved parts: pipeline of key customer - 177 in Aug‘25 → 620 in Dec’25 SIB
Slide 18: Thank You
THANK YOU For queries, please contact Evon at evon@capitalfront.biz 18
Oxford Innotech Berhad — FY2025 Earnings Presentation on 6ix