  1. Slide 1: Samarco update

    Samarco update Ian Wood, VP HSEC Samarco Advisory and Support Team January 2017

  2. Slide 2: Disclaimer

    Disclaimer Forward-looking statements This presentation contains forward-looking statements, including statements regarding: trends in commodity prices and currency exchange rates; demand for commodities; plans, strategies and objectives of management; closure or divestment of certain operations or

  3. Slide 3: Samarco Mineração S.A (50/50 BHP Billiton and Vale)

    Samarco Mineração S.A (50/50 BHP Billiton and Vale) BRAZIL State of Minas Rio de Gerais Janeiro

  4. Slide 4: Material impacts

    Material impacts Significant impact on public and Death of 19 people private infrastructure including 3 communities to be relocated 2,200 hectares impacted along ~7,500 fishermen unable to sell 650 river kilometres including fish due to fishing ban short-term fish kill 300 rural producers impacted w

  5. Slide 5: Renova Foundation

    Renova Foundation sr", FUNDAGAO ; = renova aurar, reconstruir

  6. Slide 6: Renova Foundation

    Renova Foundation Renova Foundation was incorporated as a private, non-profit foundation by Samarco, BHP Billiton and Vale in June 2016 to implement the 23 socioeconomic and 18 socioenvironmental programs outlined in the Framework Agreement New pipeline installed on the Santa Maria River in Colatina

  7. Slide 7: Governance Framework

    Governance Framework Interfederative Board Expert Panel Committee 10 Technical Advisory Committee Fiscal Committee Chambers Ombudsman Compliance Independent Auditor Executive IUCN Panel (Ernst and Young) Internal governance External governance

  8. Slide 8: Recent legal developments

    Recent legal developments Preliminary Agreement with Federal Prosecutors Office • On 2 March 2016, Samarco, Vale and BHP Billiton Brasil entered into Framework Agreement (FA) with the federal government (among others) for remediation and compensation of the impacts associated with the dam failure to

  9. Slide 9: Environmental remediation

    684 bhpbilliton Environmental remediation

  10. Slide 10: Socio-environmental programs

    Socio-environmental programs 1. Waste management – recovery of tailings, erosion control 2. Reforestation and Water Production – riparian vegetation, natural springs 3. Biodiversity Conservation – ecological recovery programs 4. Water Security and Water Quality – sewage and water treatment plants 5.

  11. Slide 11: Dam remediation – sediment containment

    Dam remediation – sediment containment S3 SELA DYKE TULIPA SELINHA S4 GERMANO DYKE AXIS 1 DYKE NEW SANTAREM DAM EROSION CONTROL REVEGE- CANDONGA TATION DREDGING TRIBUTARY RECOVERY

  12. Slide 12: Selinha dyke

    Selinha dyke • Main works to increase safety factor of the structure. November 15 December 16 Safety Factor: 1.22 Safety Factor (Nov 16): 1.68

  13. Slide 13: Old and New Santarém dams

    Old and New Santarém dams • Old Santarém: Dam damaged in the incident. Works have been undertaken to restore the safety factor and increase storage capacity. November 15 January 17 Safety Factor: 1.37 Safety Factor (Nov 16): 2.82

  14. Slide 14: S4 dyke

    S4 dyke • Dyke being built to contain tailings from the area around the old Bento Rodrigues village, any additional overflow from S3 and improve water quality. January 17

  15. Slide 15: Candonga dredging

    Candonga dredging • Candonga is the largest sediment trap in the Rio Doce. • 10.5 million m³ of tailings held back by Candonga dam was stopped from flowing down Doce river to the sea. • Aim of dredging is to remove tailings held back in the Candonga dam to reduce the risk to dam wall stability. • In

  16. Slide 16: Steps in river remediation

    Steps in river remediation 1. Road access 2. Rapid revegetation 3. Tributaries restoration

  17. Slide 17: Steps in river remediation

    Steps in river remediation 4. Erosion Control 5. Mainstem reconformation

  18. Slide 18: Steps in river remediation

    Steps in river remediation 6. Riverside and floodplains revegetation 7. Agricultural planting

  19. Slide 19: Steps in river remediation

    Steps in river remediation 8. Riparian forest planting

  20. Slide 20: Stabilising tailings

    Stabilising tailings Reforming and stabilising drainage channels Tributary and vegetation works

  21. Slide 21: River revegetation – Barra Longa Bridge

    River revegetation – Barra Longa Bridge February 16 December 16

  22. Slide 22: Old Bento Rodrigues district

    Old Bento Rodrigues district December 15 December 16

  23. Slide 23: Geochemistry and water

    684 bhpbilliton Geochemistry and water

  24. Slide 24: Water quality and supply

    Water quality and supply Tailings are considered to be non-reactive and non-toxic Water distribution using trucks was organised immediately after incident. Renova is now working on recovering and improving water supply systems and plants. • 1,378 Billion litres of drinking water distributed to citie

  25. Slide 25: Water supply – wet season

    Water supply – wet season New modular water treatment plants Mobile water treatment plants in Wells in Alpercata, São Vitor, Itueta in Belo Oriente Regência and Cachoeira Escura Lagoa Nova pipeline in Linhares Pancas Pipeline in Colatina Santa Maria Pipeline in Colatina

  26. Slide 26: Water quality status

    Water quality status Turbidity and Rainfall Range Monitoring in Rio Doce Watershed 1.200 =O= 10/01/2017 ane Confluence of Rivers "do Carmo" and "Piranga" 800 600 317 477 400 sts 200 Bo 0 PEP PLE PPMP EL EDP WEEP ELGG PEL id ddd o 5 a § £ Pit bagpibei a EPH Pe asp bby gs g & i 3 2 ge 6 rai q 2? - 5 é

  27. Slide 27: Socioeconomic programs

    684 bhpbilliton Socioeconomic programs

  28. Slide 28: Socioeconomic programs

    Socioeconomic programs 1. Social organisation – Registration, financial assistance, indemnity, Indigenous People, social dialogue 2. Infrastructure – recovery, reconstruction and resettlement 3. Education, culture and leisure – schools, historical, tourism, culture and leisure activities 4. Health –

  29. Slide 29: Registration and financial assistance

    Registration and financial assistance • Registration process is a critical in ensuring all impacted people are identified and can participate in the socioeconomic programs. • Emergency registration was completed with ~8,500 families registered. • A more robust process is now ongoing with the possibi

  30. Slide 30: Mediated indemnity program

    Mediated indemnity program • Desired outcome is a high level of participation to provide timely, fair and reasonable indemnification for all the impacts on people from the dam failure. • Significant in scale with over 400 people running the program in the field across 10 offices. • Two streams – wat

  31. Slide 31: Community resettlement

    Community resettlement • Social teams have been working with communities in a participatory process to determine the best location for each of the resettlements. • New land chosen for each of the three communities. Bento Rodrigues Paracatu de Baixo Gesteira • Lavoura was chosen by 92% of the • Lucil

  32. Slide 32: Barra Longa and Mariana reconstruction

    Barra Longa and Mariana reconstruction November 15 • 157,000 m3 material removed from Barra Longa. • Reconstruction of houses and infrastructure is progressing to plan. • Of the 99 houses to be renovated, 95 have been completed and handed back to residents. • 32 of the 36 commercial establishments h

  33. Slide 33: Barra Longa town square

    Barra Longa town square December 15 December 16 Tailings blocks used

  34. Slide 34: Health and education

    Health and education • All impacted people have been provided with access to psycho-social support. • 65 qualified health professionals including doctors and psychologists continue to provide health services. • Two health consultants are undertaking a diagnosis of health needs in Mariana and Barra L

  35. Slide 35: bhpobilliton