Bhp Group Ltd · ASX:BHP

Bhp — BHP Billiton — Corporate Update (May 2013)

23 slides from Bhp's corporate update, May 30, 2013

  1. Slide 1: Form 6-K Report of Foreign Private Issuer

    UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 Form 6-K REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16 UNDER THE SECURITIES EXCHANGE ACT OF 1934 May 30, 2013 BHP BILLITON LIMITED BHP BILLITON PLC (ABN 49 004 028 077) (REG. NO. 3196209) (Exact name of Regi

  2. Slide 2: Cover letter: Queensland Coal site tour presentation

    resourcing bhpbilliton 180 GPO Melbourne Neathouse London Tel Fax 30 bhpbilliton.com To: cc: QUEENSLAND A Jane Group BHP Registered The copy May New +61 +44 Australian Lonsdale + presentation BHP McAloon Billiton BOX 44 Company of 1300 20 2013 SW1V York 20 Billiton the the Place in Office: 7802 86 V

  3. Slide 3: BMA asset overview: resourcing the future

    BMA resourcing bhpbilliton Stephen Asset 30 MayPresident overview 2013 Dumble the future BMA

  4. Slide 4: Disclaimer

    resourcing bhpbilliton Disclaimer This management; shortages Forward statements These cause For significantly of Other transport government uncertainty; which Except Non-IFRS BHP includes capital. not Certain UK No Nothing Reliance The completeness Queensland Slide existing offer been example, GAAP

  5. Slide 5: Disclaimer: Coal Resource information

    resourcing bhpbilliton Disclaimer This Resource All Billiton Table Measured Asset Indicated Inferred Metallurgical CQCA BHP Illawarra IndoMet Queensland Slide information presentation Billiton Mitsui 31and and Rescource Coal Coal Resource information Resource the Gregory Coal has 183 interest Coal c

  6. Slide 6: Program

    resourcing bhpbilliton Program BHP Metallurgical Hay Day BMA Peak Caval Dean Vicky Gideon Phil Stephen Queensland SlideHynes 1: Point 2: Billiton Downs 4Dalla overview Ridge Binns Wednesday, Thursday, Oberholzer Dumble overview site the Valle Coal site Coal coal visit future visit site 30 market fin

  7. Slide 7: Key themes

    Key resourcing •bhpbilliton Queensland Slide A We Continued Unparalleled Our Strong capable performance themes have 5unique recent delivered the management Coal improvement infrastructure future resource recovery based sitesignificant tour, culture position in team in 30 production underpins our May

  8. Slide 8: Operationally experienced leadership team

    Operationally resourcing bhpbilliton Asset Stephen Gerhard Marco Geoff Development Brandon Gordon Planning Mick Michelle Steve Nick Head Vincent Queensland Slide Lake 6of Spencer Hadwen Rae President Streeton Pires Carlyle Cosgrove Alliance Technology Finance Projects Business Production Resource, H

  9. Slide 9: Relentless focus on keeping our people safe

    Relentless resourcing bhpbilliton BMA (TRIF, 840T 12 16 Jun Fatality Queensland Slide RIF 087Total Jun 12 month focus the 09 Recordable Coal Jun future on moving site 10keeping Jun tour, Injury average) 1130our Jun May Frequency people 122013safe

  10. Slide 10: Investing in local communities

    Investing resourcing bhpbilliton E-reefs CQU Shave BMA Delivering Rescue Moranbah Local Queensland Slide 8Indigenous Kidspace Buying for partnership Helicopter to aDistrict the Affordable Cure Coal build Program future Mackay Chair site strong Partnership Support tour, Housing relationships 30 Servi

  11. Slide 11: The premier metallurgical coal basin

    The resourcing •bhpbilliton SW Rangal Moranbah Queensland Slide Large Predominately Flat Established Proximity CROSS-SECTION Bowen 9topography, Coal coalCoal the to Basin Coal resources Measures infrastructure key future Measures high site favourable is growth the quality tour, support NE premier ma

  12. Slide 12: Our resource and infrastructure underpin competitive advantage

    Our resourcing –•bhpbilliton 1. Queensland Slide We In Key 35 32 182 162 141 Coal FY12 resource, draglines shovels are have 10 dump dozers loaders BMA Resources the we seven the Coal fleet trucks largest and moved people (world’s future mines excavators statistics site are private 1.4 and tour, tabu

  13. Slide 13: Production capacity and projects

    resourcing –•bhpbilliton BMA 04(million 20 60 80 40 544 10 Projects capacity Latent FY13e FY12 FY11 FY10 1. FY15e Queensland Slide 9We With Industrial Strong maximise reduce complete Includes 37are have 11 iscompletion production currently in tonnes recovery focused operating optimised the execution

  14. Slide 14: Water management response

    We resourcing •–bhpbilliton Goonyella Peak Saraji Queensland Slide We In Our A$100 landform increased wider onare response, site experienced Downs 12 discharge actions irrigation better discharge water million Riverside the work discharge Coal rapid will prepared we future evaporation performance in

  15. Slide 15: Goonyella truck productivity and utilisation

    We resourcing –•bhpbilliton BMA (hours/month, F 50 100 150 Goonyella FY14e Utilisation Availability (annualised 0S 2,000 4,000 6,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Queensland Slide Y13e ep We Pre-strip it 12 new increased focused improved in-pit optimised upgraded implemented is wil

  16. Slide 16: Workforce engagement and performance culture

    AWe resourcing •–bhpbilliton Queensland Slide Effective extensive important workforce individual performance are 14 driving the employee use metrics Coal crew participation future based ofimprovement site and visual are engagement culture tour, operator monitored performance in30planning, will May w

  17. Slide 17: Planned work and schedule adherence

    We resourcing •–bhpbilliton Work 0T 20 40 60 80 100 (%) Sep Planned Adherence Queensland Slide arget We Planned Our Benchmarking targeting schedule continue 12 have 15 systems management Oct and work anoted the >80% to 12 Coal disciplined scheduled to 80% schedule are future Nov “plan isadherence of

  18. Slide 18: Cost reduction and reset

    Our resourcing •–bhpbilliton Queensland BMA Slide We Cost Our mining full eliminate bottom-up have will 16 visibility cost reviews in displace schedule reduction set the excess the Coal clear future have of approach right site capacity, excess equipment all targets been focus area tour, remaining wi

  19. Slide 19: Leveraging technology and automation

    Leveraging resourcing –•bhpbilliton Longwall Autonomous Queensland Slide Longwall Equipment Integrated WAIO first17 expect increases lowers automated autonomous BMA installation assessment facility to unit top the lift Top production technology Remote Coal drill automation drill costs coal haul futu

  20. Slide 20: Employment agreements and workforce flexibility

    Providing resourcing –•bhpbilliton Queensland BMA Slide A There We Other agreement enables removed provides Daunia new now 18agreements isthree and BMA ahave operational flexibility the constraints strong Coal covers Caval year future atoportfolio site more focus BMA are seven Ridge on tour, flexibi

  21. Slide 21: Key themes

    Key resourcing •bhpbilliton Queensland Slide A We Continued Unparalleled Our Strong capable performance themes have 19 unique recent delivered the management Coal improvement infrastructure future resource recovery based sitesignificant tour, culture position in team in 30 production underpins our M

  22. Slide 22: resourcing the future

    resourcing the future bhpbilliton

  23. Slide 23: Signatures

    SIGNATURES Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized. BHP Billiton Limited and BHP Billiton Plc Date: May 30, 2013 By: /s/ Jane McAloon Name: Jane McAloon Ti