66 slides from Birchcliff Energy's investor presentation, May 9, 2018

  1. Slide 1: Corporate Presentation

    Slide 1: Corporate Presentation

    CORPORATE PRESENTATION May 9, 2018

  2. Slide 2: Forward-Looking Information

    Slide 2: Forward-Looking Information

    FORWARD-LOOKING INFORMATION: Certain statements contained in this presentation constitute forward-looking statements and information (collectively referred to as “forward-looking information”) within the meaning of applicable Canadian securities laws. Such forward-looking information relates to futu

  3. Slide 3: People, Focus & Execution

    Slide 3: People, Focus & Execution

    WG tipi “UWX_\optzsjjyyp Gordondale Pouce Coupe © Seattle, WA

  4. Slide 4: Corporate Snapshot & Select Guidance

    Slide 4: Corporate Snapshot & Select Guidance

    Corporate Snapshot & Select Guidance Q1 2018 average production 76,323 boe/d Estimated 2018 annual average production 76,000 – 78,000 boe/d % oil and NGL 20% Estimated 2018 capital expenditures (millions) $255 Total debt as at March 31, 2018 (millions) $657.7 Credit facilities limit as at March 31,

  5. Slide 5: Q1 2018 Highlights

    Slide 5: Q1 2018 Highlights

    Q1 2018 HIGHLIGHTS • Quarterly average production of 76,323 boe/d, a 24% increase from 61,662 boe/d in Q1 2017 • Quarterly cash flow of $83.7 million ($0.31/basic common share), a 24% increase from $67.6 million ($0.26/basic common share) in Q1 2017 • Drilled 20 (20.0 net) wells in Q1 2018, consisti

  6. Slide 6: Investment Highlights

    Slide 6: Investment Highlights

    INVESTMENT HIGHLIGHTS • Focused assets in the Peace River Arch Area of Alberta on the Montney/Doig Resource Play • Essentially 100% working interest; 99% of production is operated • Large, contiguous undeveloped land base with an average 91% W.I. • Significant control of infrastructure including the

  7. Slide 7: Birchcliff's History

    Slide 7: Birchcliff's History

    BIRCHCLIFF’S HISTORY A Track Record of Execution

  8. Slide 8: Keys to Success

    Slide 8: Keys to Success

    KEYS TO SUCCESS  Executives with proven track record, continuity since inception and significant ownership Management  Highly experienced Management Team with excellent technical knowledge and a long history with the company  348 (342.8 net) Montney/Doig horizontal wells drilled to December 31, 2

  9. Slide 9: Production History

    Slide 9: Production History

    90,000 PRODUCTION HISTORY 76,000 - 80,000 78,000 70,000 Compound per-share production 67,963 growth of 12% per year since 2005. Average Production (boe/d) (14% since PC Gas Plant Phase I 60,000 Completion) 49,236 50,000 38,950 40,000 33,734 30,000 25,829 22,802 20,000 18,136 13,079 10,148 11,216 10,

  10. Slide 10: Birchcliff Corporate Decline

    Slide 10: Birchcliff Corporate Decline

    BIRCHCLIFF CORPORATE DECLINE(1) Long life, low decline asset allows for smaller capital wedge YoY needed to maintain volumes Corporate Production (boe/d) 20.3% 25.7% Base Base Decline Decline (1) 2005-2017 Production profile provided for general illustrative purposes only and not indicative of expec

  11. Slide 11: Corporate Reserves

    Slide 11: Corporate Reserves

    CORPORATE RESERVES 1,000,000 $7,000 PDP - Reserves 900,000 TP - Reserves 2P - Reserves $6,000 800,000 PDP - NPV10 On a per share basis PDP, 1P and 2P TP - NPV10 reserves have increased at a compound $5,000 700,000 2P - NPV10 annual growth rate of 14%, 22% and 21% per year since 2005, respectively NP

  12. Slide 12: Proven Track Record as a Low Cost Producer

    Slide 12: Proven Track Record as a Low Cost Producer

    PROVEN TRACK RECORD AS A LOW COST PRODUCER 5 Year Profitability Breakdown: 2013 2014 2015 2016 2017 Average Average AECO (CAD$/GJ) $2.99 $4.27 $2.55 $2.05 $2.05 $2.78 Average WTI (USD$/bbl) $97.97 $92.99 $48.80 $43.32 $50.95 $66.81 P&NG Revenue ($/Mcfe) (1) $5.60 $6.40 $3.72 $3.12 $3.74 $4.52 PDP F&

  13. Slide 13: Proven Track Record as a Low Cost Finder

    Slide 13: Proven Track Record as a Low Cost Finder

    PROVEN TRACK RECORD AS A LOW COST FINDER $16 PDP F&D 1P F&D 2P F&D 1.2x $12 1.8x 1.8x 1.9x Cash flow F&D Cost ($/boe) 1.2x 1.2x 1.3x netback recycle $8 2.0x 2.0x ratios 1.4x 1.6x 1.8x 1.3x 2.0x $4 1.7x 1.8x 4.7x 7.3x $0 2012 2013 2014 2015 2016 2017 Corporate F&D Costs (incl. FDC) & Cash Flow Recycl

  14. Slide 14: Looking Forward

    Slide 14: Looking Forward

    LOOKING FORWARD 2018 Plans & Beyond

  15. Slide 15: 2018 Capital Program

    Slide 15: 2018 Capital Program

    2018 CAPITAL PROGRAM • Our board of directors has approved a 2018 capital expenditure budget of $255 million • The 2018 budget includes $149.9 MM of E&D spending and $66.9 MM of facilities and infrastructure ($25.7 MM for PC Gas Plant Phase VI completion including Phase V/VI shallow-cut capability)

  16. Slide 16: 2018 Capital Program Details

    Slide 16: 2018 Capital Program Details

    2018 CAPITAL PROGRAM DETAILS 2018 CAPITAL PROGRAM Gross Wells Net Wells Capital ($MM) Drilling & Development Pouce Coupe - Montney D1 Horizontal Gas Wells 12 12.0 $66.2 Pouce Coupe - Montney D2 Horizontal Gas Wells 1 1.0 $4.9 Pouce Coupe - Montney C Horizontal Gas Wells 1 1.0 $5.1 Gordondale - Montn

  17. Slide 17: 2018 Capital Program Details

    Slide 17: 2018 Capital Program Details

    2018 CAPITAL PROGRAM DETAILS • 2018 budget includes $66.9 MM Land & of investment in facilities Seismic, $4.6MM Other, $16.5MM 2% including: 6% Sustaining & • PC Gas Plant Phase VI Opt., $17.1,MM completion including Phase 7% V/VI shallow-cut capability ($25.7 MM) Drilling & • Pipeline twinning ($11

  18. Slide 18: 2018 Natural Gas Marketing

    Slide 18: 2018 Natural Gas Marketing

    2018 NATURAL GAS MARKETING AECO $ 1.50 $ 0.02 $ 0.26 $ 1.22 Dawn $ 3.30 $ 0.09 ACE/ ATP/ $ 1.22 2018E Natural Gas Egress (GJ/d) 2018E Corporate Revenue ($MM) Alliance Alliance $ 1.99 2% 2% $ 3.30 $ 1.50 $ 0.08 $ 0.03 25% Note: All Birchcliff gas realizes a $ 1.23 $ 0.35 30% 47% 9% heat premium(1) $

  19. Slide 19: Risk Management & Hedging

    Slide 19: Risk Management & Hedging

    RISK MANAGEMENT & HEDGING • In 2019, approximately 63% of Birchcliff’s natural gas production will be sold at prices that are not based on AECO (based on 2018 mid-point production guidance) 19

  20. Slide 20: Borrowing Base Details

    Slide 20: Borrowing Base Details

    BORROWING BASE DETAILS • Birchcliff has extendible revolving credit facilities in the aggregate principal amount of $950 million, which are comprised of an extendible revolving syndicated term credit facility of $850 million and an extendible revolving working capital facility of $100 million • Birc

  21. Slide 21: Montney/Doig Resource Play

    Slide 21: Montney/Doig Resource Play

    MONTNEY/DOIG RESOURCE PLAY A Significant Position in a World Class Play

  22. Slide 22: Montney/Doig - A World Class Resource Play

    Slide 22: Montney/Doig - A World Class Resource Play

    MONTNEY/DOIG - A WORLD CLASS RESOURCE PLAY Resource density. Stacked resource up to 300 metres thick. Large areal extent. Extends over 50,000 square miles. Exceptional “fracability”. Low clay Birchcliff Montney/Doig content, low Poisson’s Ratio and high Young’s Modulus. Exceptional fracture stabilit

  23. Slide 23: Montney/Doig Mineralogy Leads to Excellent Fracability

    Slide 23: Montney/Doig Mineralogy Leads to Excellent Fracability

    MONTNEY/DOIG MINEROLOGY LEADS TO EXCELLENT “FRACABILITY” The Montney/Doig Resource Play rock type is composed of a Some other Resource Plays have a high percentage of clays high percentage of hard minerals, and a low percentage of and soft minerals. When fractured this results in the rock clays and

  24. Slide 24: Birchcliff Montney/Doig Resource Play

    Slide 24: Birchcliff Montney/Doig Resource Play

    BIRCHCLIFF MONTNEY/DOIG RESOURCE PLAY • The Gordondale Acquisition added a fourth commercial development interval in the Montney D2 • Large contiguous land base with 349.4 sections prospective for the Montney/Doig as at December 31, 2017 • Birchcliff has contiguous land block at Pouce Coupe and Gord

  25. Slide 25: Stacked Resource Provides Substantial Future Upside

    Slide 25: Stacked Resource Provides Substantial Future Upside

    STACKED RESOURCE PROVIDES SUBSTANTIAL FUTURE UPSIDE 25

  26. Slide 26: Montney/Doig Multi Layer Opportunity

    Slide 26: Montney/Doig Multi Layer Opportunity

    MONTNEY/DOIG MULTI LAYER OPPORTUNITY 3 2 1 4 5 6 5 6 4 3 2 1 26

  27. Slide 27: Birchcliff Montney/Doig Inventory

    Slide 27: Birchcliff Montney/Doig Inventory

    BIRCHCLIFF MONTNEY/DOIG INVENTORY BIR MONTNEY/DOIG POUCE PDP/PDNP 1P Locations 2P Locations PDP/PDNP 1P Locations 2P Locations Gross Net Gross Net Gross Net Gross Net Gross Net Gross Net BD/MNTN D5 73.0 71.5 189.0 182.3 260.0 249.4 BD/MNTN D5 71.0 71.0 177.0 174.4 243.0 237.1 MNTN D4 12.0 12.0 17.0

  28. Slide 28: Proximal to Infrastructure with Long Term Exposure to LNG Export

    Slide 28: Proximal to Infrastructure with Long Term Exposure to LNG Export

    PROXIMAL TO INFRASTRUCTURE WITH LONG TERM EXPOSURE TO LNG EXPORT Montney/Doig Birchcliff Pouce Coupe Production Montney/Doig & PC Gas Plant Owned Infrastructure PC Gas Plant Nova Pipeline System North American Market LNG Export Source: RBC Energy Insights: The Montney – Tracking an Elephant August 1

  29. Slide 29: Pouce Coupe Overview

    Slide 29: Pouce Coupe Overview

    POUCE COUPE OVERVIEW • Proven asset in development phase • Wells show high initial deliverability, low terminal decline and stable long term production • Predictable results with improving gas rates & liquids yields • 100% owned and operated • Expect to drill 14 (14.0 net) Montney/Doig horizontal na

  30. Slide 30: 2017 Well Performance

    Slide 30: 2017 Well Performance

    Wh “LMMOooirjifa 2017 WELL PERFORMANCE Pouce Coupe Lower Montney (D1) Performance vs. Type Curve 9.000 ===. Deloitte Tier 0 Type Curve Raw Producing Day Gas Rate (Mscfd) Aa) So o Oo i é l 0 2 4 6 8 10 12 Normalized Producing Time (Months) Lower Montney (D1) = 2016 Lower Montney (D1) —— 2017 Lower Mo

  31. Slide 31: Continued Well Improvement

    Slide 31: Continued Well Improvement

    CONTINUED WELL IMPROVEMENT 31

  32. Slide 32: Continuous Cost and Design Refinement

    Slide 32: Continuous Cost and Design Refinement

    CONTINUOUS COST AND DESIGN REFINEMENT Drilling costs have decreased while overall well costs have slightly Birchcliff Corporate Wellbore Evolution increased due to 7,500 increased2,500 frac intensity Lateral Length (m) and Frac Intensity (Ton per 1000m) 6,000 2,000 Average DCE Cost per Well (k$) 4,5

  33. Slide 33: 2017 Liquids Summary Map

    Slide 33: 2017 Liquids Summary Map

    2017 LIQUIDS 2017 New Wells IP60 Rates (Avg. Per Well) SUMMARY MAP GORDONDALE: CRUDE OIL • Excellent Lower Montney oil inventory in D1 and D2 intervals • Engineered completions drive recovery factor improvements • EOR scheme under evaluation POUCE COUPE: CONDENSATE (C5+) • 2017 well results demonstr

  34. Slide 34: 2018 Liquids Summary Map

    Slide 34: 2018 Liquids Summary Map

    2018 LIQUIDS 2018 New Well Production Test Rates SUMMARY MAP GORDONDALE: CRUDE OIL • Strong Montney D2 oil and total BOE test rates • Strong Montney D1 oil and total BOE test rates • Further refinements of engineered completions having positive results POUCE COUPE: CONDENSATE (C5+) • Strong Montney

  35. Slide 35: Pouce Coupe Liquids Type Curve - 2018 Targeted Well

    Slide 35: Pouce Coupe Liquids Type Curve - 2018 Targeted Well

    POUCE COUPE LIQUIDS TYPE CURVE – 2018 TARGETED WELL 5,000 Rate of Return (%) WTI ($US/bbl) $55/bbl $60/bbl $65/bbl $1.50/GJ 30% 32% 35% AECO 4,000 $2.00/GJ 46% 49% 51% Sales Gas Rate (Mscfd) $2.50/GJ 64% 68% 71% 3,000 NPV 10% ($MM) WTI ($US/bbl) $55/bbl $60/bbl $65/bbl 2,000 $1.50/GJ $3.2 $3.5 $3.8

  36. Slide 36: Gordondale Overview

    Slide 36: Gordondale Overview

    GORDONDALE OVERVIEW • Acquired in 2016, Gordondale consolidated a sizeable and contiguous land base within Birchcliff’s existing core area • High oil & NGLs weighting • Strategic infrastructure • Low base decline production • High quality development opportunities including the addition of a fourth

  37. Slide 37: Gordondale Key Infrastructure

    Slide 37: Gordondale Key Infrastructure

    GORDONDALE KEY INFRASTRUCTURE Key Natural Gas Processing Infrastructure • Existing infrastructure has already AltaGas Gordondale CNRL Progress Sour Deep Cut Gas Plant Sour Shallow Cut Gas Plant supported peak production of 16-31-078-11W6 Licensed Capacity: ~135 MMcf/d 01-01-078-10W6 Acquired W.I.: ~

  38. Slide 38: Gordondale Base Production History

    Slide 38: Gordondale Base Production History

    GORDONDALE BASE PRODUCTION HISTORY 2017 Year-End 40,000 ~30,000 BOE/d Last well drilled in 2014 (on-stream Birchcliff 2015) with peak production of Acquisition ~35,000 boe/d (~22,000 BOE/d) Scheduled 35,000 AltaGas Plant Turnaround 30,000 AltaGas Deep Cut Plant on 2017 stream October 2012 and Produc

  39. Slide 39: Gordondale D2 Oil Type Curve

    Slide 39: Gordondale D2 Oil Type Curve

    GORDONDALE D2 OIL TYPE CURVE D2 Oil Tier 1 - Rate of Return (%) D2 Oil Tier 1 Type Curve D2 Oil Tier 2 Type Curve WTI ($US/bbl) 300 $55/bbl $60/bbl $65/bbl $1.50/GJ 81% 97% 115% AECO $2.00/GJ 94% 111% 130% 250 $2.50/GJ 108% 126% 146% Oil Rate (Bblpd) 200 D2 Oil Tier 1 - NPV 10% ($MM) WTI ($US/bbl) 1

  40. Slide 40: Elmworth Development

    Slide 40: Elmworth Development

    ELMWORTH DEVELOPMENT • Received regulatory approval for an acid gas injection well in August 2016 Second Exploration • Preliminary planning underway for a Horizontal 100% owned and operated 40 MMcf/d natural gas processing plant; currently expected to be operational in the fall of 2022 First • Drill

  41. Slide 41: Conceptual Montney/Doig Field Development Model

    Slide 41: Conceptual Montney/Doig Field Development Model

    CONCEPTUAL MONTNEY/DOIG FIELD DEVELOPMENT MODEL STATUS OF MODEL CALIBRATION AND DERISKING FACIES & PETROPHYSICAL GEOLOGICAL, GEOPHYSICAL, GEOMECHANCAL HYDRAULIC FRAC & MICRO SEIS. RESERVOIR MODEL OPTIMIZED DCC & PRODUCTION BASAL DOIG / D5 T1 D4 T2 D3 D2 >T0 D1 >T0 C >T4 41

  42. Slide 42: Pouce Coupe Drilling Performance

    Slide 42: Pouce Coupe Drilling Performance

    POUCE COUPE DRILLING PERFORMANCE Drill Cost Efficiency Average Drilling Speed (Spud to Rig Release) 800 300 750 Cost per Drilled Length ($/m MD) 2017 - $1,993k/well (4,832m MD, 32 Stages Planned) 250 2017 - 3.7 Days/1000m 700 2016 - $1,881k/well (4,492m MD, 20 Stages Planned) 2016 - 3.9 Days/1000m D

  43. Slide 43: Pouce Coupe Lower Montney (D1) Core Area Completion Evolution

    Slide 43: Pouce Coupe Lower Montney (D1) Core Area Completion Evolution

    POUCE COUPE LOWER MONTNEY (D1) CORE AREA COMPLETION EVOLUTION Completion Cost per Stage vs. Number of Stages Proppant Intensity $400 40 1.00 200 Completion Cost Per Stage ($000's) 0.90 180 $350 35 Average Proppant Intensity (t/m) Average Number of Stages (#) Average Interfrac Spacing (m) 0.80 160 $3

  44. Slide 44: Engineered Completions for Montney/Doig Full Field Development

    Slide 44: Engineered Completions for Montney/Doig Full Field Development

    ENGINEERED COMPLETIONS FOR MONTNEY/DOIG FULL FIELD DEVELOPMENT Industry Range Birchcliff Best Practices Oil Birchcliff Best Practices Gas Liner type Openhole or Cemented Openhole or Cemented Openhole Inter-well spacing 100 – 400 m (300 – 1,200 ft) 200 m (600 ft) 300 m (900 ft) Inter-frac spacing 20

  45. Slide 45: Terminal Decline Changes

    Slide 45: Terminal Decline Changes

    TERMINAL DECLINE CHANGES • Continued support for low terminal decline rates from Birchcliff’s existing wells and offsetting industry wells with significant production history. • Deloitte’s Tier 0 type curve has remained at 8.2 Bcfe sales with the same terminal decline rates of 11% Proved and 9% Prov

  46. Slide 46: PC Gas Plant

    Slide 46: PC Gas Plant

    PC GAS PLANT The Engine for Future Growth

  47. Slide 47: Production Processed through the PC Gas Plant

    Slide 47: Production Processed through the PC Gas Plant

    Production Processed through the PC Gas 2013 2014 2015 2016 2017 Q1 2018 Plant Average daily production, net to Birchcliff: Natural gas (Mcf) 91,666 132,808 163,641 168,444 193,417 253,357 Oil & NGLs (bbls) 527 1,065 1,287 960 1,316 2,050 Total boe (6:1) 15,805 23,200 28,560 29,034 33,552 44,276 % o

  48. Slide 48: Key Strategic Advantages of PC Gas Plant

    Slide 48: Key Strategic Advantages of PC Gas Plant

    Corporate Operating Costs vs. % of Natural Gas Sales Volumes Processed at the PC Gas Plant KEY STRATEGIC $10.00 100% Corporate Operating Cost ($/boe) Volume Through PC Gas Plant ADVANTAGES $8.00 $6.00 80% 60% • 100% owned and operated $4.00 40% • Generates operating cost savings of $2.00 20% approxi

  49. Slide 49: PC Gas Plant Highlights

    Slide 49: PC Gas Plant Highlights

    PC GAS PLANT HIGHLIGHTS • Current processing capacity of 260 MMcf/d • Phase V expansion was completed ahead of it’s initially scheduled October 1, 2017 completion date, adding 80 MMcf/d bringing total processing capacity to 260 MMcf/d 33% • Expect Phase VI expansion will be completed in October 2018

  50. Slide 50: Building on Our Past

    Slide 50: Building on Our Past

    BUILDING ON OUR PAST Over 10 Years of Success

  51. Slide 51: Birchcliff Timeline and Production Growth

    Slide 51: Birchcliff Timeline and Production Growth

    Forecasted record annual Birchcliff’s average daily production was 67,963 boe/d in average production of 76,000-78,000 boe/d in 2017 compared to 2,793 boe/d in 2005, a compounded 2018 annual growth rate of 30% per year over that span. 2,793 boe/d 1 2 3 4 5 6 7 8 9 10 11 2004 2018 July 6, 2004: Birch

  52. Slide 52: Production Growth and Operating & Cash Costs

    Slide 52: Production Growth and Operating & Cash Costs

    Production Growth 80,000 300 70,000 boe/d/million wtd. avg. shares 250 60,000 Birchcliff has increased production at a 200 50,000 compound annual growth rate of boe/d 40,000 150 30,000 30% since 2005. 100 20,000 50 10,000 0 0 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Average P

  53. Slide 53: Reserves Growth

    Slide 53: Reserves Growth

    Reserves Growth 1200 4,000 1000 3,200 Birchcliff has added significant low cost 800 reserves since commencing operations in boe/1,000shares MMboe 2,400 600 2005. On a per common share 400 1,600 basis, PDP, 1P and 2P reserves 200 800 grew 14% per year, 22% per year and 21% per year, 0 0 2005 2006 200

  54. Slide 54: Appendix

    Slide 54: Appendix

    VW QGCC[Co 'DCDBC SS GK D.D—C CDC C[E .G.BE[ \ \ \ a a WG GQQv Le LZ x Q 2 uu Oo. a <

  55. Slide 55: 2017 Year End Montney/Doig Reserves

    Slide 55: 2017 Year End Montney/Doig Reserves

    2017 YEAR END MONTNEY/DOIG 1,000,000 RESERVES Drilled 53 HZ M/D wells Drilled 20 HZ M/D wells and acquired 87 HZ M/D wells 900,000 348 (342.8 net) Montney/Doig horizontal Drilled 29 HZ M/D wells 800,000 wells drilled as of Dec 31, 2017 Drilled 41 HZ M/D wells 700,000 Drilled 25 HZ M/D wells Reserves

  56. Slide 56: Montney/Doig Well Locations

    Slide 56: Montney/Doig Well Locations

    MONTNEY/DOIG WELL LOCATIONS 56

  57. Slide 57: Series A Perpetual Preferred Shares

    Slide 57: Series A Perpetual Preferred Shares

    SERIES A PERPETUAL PREFERRED SHARES Preferred Share Details Series A Number of Shares 2 million Issue Date August 8, 2012 TSX Trading Symbol BIR.PR.A Issue / Par Price $25.00 per share Quarterly Dividend $0.523375 per share Current Yield 8.374% Redeemable by Holder No • September 30, 2022: Series A

  58. Slide 58: Series C Preferred Shares

    Slide 58: Series C Preferred Shares

    SERIES C PREFERRED SHARES Preferred Share Details Series C Number of Shares 2 million Issue Date June 14, 2013 TSX Trading Symbol BIR.PR.C Issue / Par Price $25.00 per share Quarterly Dividend $0.4375 per share Yield at Issue 7.0% June 30, 2020 and each Redeemable by Holder quarter thereafter 2016 2

  59. Slide 59: Executive Officers

    Slide 59: Executive Officers

    EXECUTIVE OFFICERS Mr. Tonken is the President, Chief Executive Officer and Chairman of the Board of Birchcliff. He has more than 36 years of A. Jeffery experience in the oil and natural gas industry and is one of the Corporation’s founders. Prior to creating Birchcliff, Mr. Tonken founded and serve

  60. Slide 60: Executive Officers

    Slide 60: Executive Officers

    EXECUTIVE OFFICERS Mr. Carlsen is the Vice-President, Engineering of Birchcliff and is a Professional Engineer. He previously served as Asset Christopher A. Team Lead and Senior Exploitation Engineer with Birchcliff. Mr. Carlsen is a Professional Engineer with more than 16 years of experience in the

  61. Slide 61: Board of Directors

    Slide 61: Board of Directors

    BOARD OF DIRECTORS A. Jeffery Tonken See Mr. Tonken’s biography under “Executive Officers”. President, CEO and Chairman of the Board Mr. Shaw is a director of Birchcliff and has more than 29 years of experience in the oil and natural gas industry and is one of the Corporation’s founders. Prior to jo

  62. Slide 62: Board of Directors

    Slide 62: Board of Directors

    BOARD OF DIRECTORS Mr. Dawson is a director of Birchcliff. Prior to joining Birchcliff, Mr. Dawson was the Vice-President General Counsel and Corporate Secretary of AltaGas. Mr. Dawson joined AltaGas as Associate General Counsel in August 1997, after consulting Dennis with AltaGas Services Inc. from

  63. Slide 63: Presentation of Oil and Gas Reserves and Resources

    Slide 63: Presentation of Oil and Gas Reserves and Resources

    PRESENTATION OF OIL AND GAS RESERVES AND RESOURCES: Deloitte prepared the 2017 Consolidated Reserves Report, the 2017 Deloitte Reserves Report, and the 2016 Deloitte Reserves Report and the 2016 Resource Assessment. McDaniel prepared the 2016 McDaniel Reserves Report. Such evaluations were prepared

  64. Slide 64: Advisories

    Slide 64: Advisories

    Uncertainty Ranges for Resources Estimates of resource volumes can be categorized according to the range of uncertainty associated with the estimates. Uncertainty ranges are described in the COGE Handbook as low, best and high estimates as follows: • A “low estimate” (1C) is considered to be a conse

  65. Slide 65: Non-GAAP Measures

    Slide 65: Non-GAAP Measures

    With respect to disclosure of F&D costs disclosed in this presentation: F&D costs including FDC have been presented herein. F&D costs for each reserves category in a particular period are calculated by taking the sum of: (i) exploration and development costs incurred in the period; and (ii) the chan

  66. Slide 66: Thank You Team Birchcliff

    Slide 66: Thank You Team Birchcliff

    THANK YOU TEAM BIRCHCLIFF Jeffrey Akeroyd, Bradley Alexander, Karen Allen, Camille Ashton, Gates Aurigemma, Valerie Babkov, Bryce Baloun, Angela Belbeck, Charmaine Belley, Tyrus Bender, Daniel Blattler, Calvin Bohdan, Angela Boire, Darryl Bolch, Deborah Borthwick, Myles Bosman, Jeff Boswell, Robyn B