Birchcliff Energy Ltd. · TSX:BIR
Birchcliff Energy — Investor Presentation (May 2018)
66 slides from Birchcliff Energy's investor presentation, May 9, 2018

Slide 1: Corporate Presentation
CORPORATE PRESENTATION May 9, 2018

Slide 2: Forward-Looking Information
FORWARD-LOOKING INFORMATION: Certain statements contained in this presentation constitute forward-looking statements and information (collectively referred to as “forward-looking information”) within the meaning of applicable Canadian securities laws. Such forward-looking information relates to futu

Slide 3: People, Focus & Execution
WG tipi “UWX_\optzsjjyyp Gordondale Pouce Coupe © Seattle, WA

Slide 4: Corporate Snapshot & Select Guidance
Corporate Snapshot & Select Guidance Q1 2018 average production 76,323 boe/d Estimated 2018 annual average production 76,000 – 78,000 boe/d % oil and NGL 20% Estimated 2018 capital expenditures (millions) $255 Total debt as at March 31, 2018 (millions) $657.7 Credit facilities limit as at March 31,

Slide 5: Q1 2018 Highlights
Q1 2018 HIGHLIGHTS • Quarterly average production of 76,323 boe/d, a 24% increase from 61,662 boe/d in Q1 2017 • Quarterly cash flow of $83.7 million ($0.31/basic common share), a 24% increase from $67.6 million ($0.26/basic common share) in Q1 2017 • Drilled 20 (20.0 net) wells in Q1 2018, consisti

Slide 6: Investment Highlights
INVESTMENT HIGHLIGHTS • Focused assets in the Peace River Arch Area of Alberta on the Montney/Doig Resource Play • Essentially 100% working interest; 99% of production is operated • Large, contiguous undeveloped land base with an average 91% W.I. • Significant control of infrastructure including the

Slide 7: Birchcliff's History
BIRCHCLIFF’S HISTORY A Track Record of Execution

Slide 8: Keys to Success
KEYS TO SUCCESS Executives with proven track record, continuity since inception and significant ownership Management Highly experienced Management Team with excellent technical knowledge and a long history with the company 348 (342.8 net) Montney/Doig horizontal wells drilled to December 31, 2

Slide 9: Production History
90,000 PRODUCTION HISTORY 76,000 - 80,000 78,000 70,000 Compound per-share production 67,963 growth of 12% per year since 2005. Average Production (boe/d) (14% since PC Gas Plant Phase I 60,000 Completion) 49,236 50,000 38,950 40,000 33,734 30,000 25,829 22,802 20,000 18,136 13,079 10,148 11,216 10,

Slide 10: Birchcliff Corporate Decline
BIRCHCLIFF CORPORATE DECLINE(1) Long life, low decline asset allows for smaller capital wedge YoY needed to maintain volumes Corporate Production (boe/d) 20.3% 25.7% Base Base Decline Decline (1) 2005-2017 Production profile provided for general illustrative purposes only and not indicative of expec

Slide 11: Corporate Reserves
CORPORATE RESERVES 1,000,000 $7,000 PDP - Reserves 900,000 TP - Reserves 2P - Reserves $6,000 800,000 PDP - NPV10 On a per share basis PDP, 1P and 2P TP - NPV10 reserves have increased at a compound $5,000 700,000 2P - NPV10 annual growth rate of 14%, 22% and 21% per year since 2005, respectively NP

Slide 12: Proven Track Record as a Low Cost Producer
PROVEN TRACK RECORD AS A LOW COST PRODUCER 5 Year Profitability Breakdown: 2013 2014 2015 2016 2017 Average Average AECO (CAD$/GJ) $2.99 $4.27 $2.55 $2.05 $2.05 $2.78 Average WTI (USD$/bbl) $97.97 $92.99 $48.80 $43.32 $50.95 $66.81 P&NG Revenue ($/Mcfe) (1) $5.60 $6.40 $3.72 $3.12 $3.74 $4.52 PDP F&

Slide 13: Proven Track Record as a Low Cost Finder
PROVEN TRACK RECORD AS A LOW COST FINDER $16 PDP F&D 1P F&D 2P F&D 1.2x $12 1.8x 1.8x 1.9x Cash flow F&D Cost ($/boe) 1.2x 1.2x 1.3x netback recycle $8 2.0x 2.0x ratios 1.4x 1.6x 1.8x 1.3x 2.0x $4 1.7x 1.8x 4.7x 7.3x $0 2012 2013 2014 2015 2016 2017 Corporate F&D Costs (incl. FDC) & Cash Flow Recycl

Slide 14: Looking Forward
LOOKING FORWARD 2018 Plans & Beyond

Slide 15: 2018 Capital Program
2018 CAPITAL PROGRAM • Our board of directors has approved a 2018 capital expenditure budget of $255 million • The 2018 budget includes $149.9 MM of E&D spending and $66.9 MM of facilities and infrastructure ($25.7 MM for PC Gas Plant Phase VI completion including Phase V/VI shallow-cut capability)

Slide 16: 2018 Capital Program Details
2018 CAPITAL PROGRAM DETAILS 2018 CAPITAL PROGRAM Gross Wells Net Wells Capital ($MM) Drilling & Development Pouce Coupe - Montney D1 Horizontal Gas Wells 12 12.0 $66.2 Pouce Coupe - Montney D2 Horizontal Gas Wells 1 1.0 $4.9 Pouce Coupe - Montney C Horizontal Gas Wells 1 1.0 $5.1 Gordondale - Montn

Slide 17: 2018 Capital Program Details
2018 CAPITAL PROGRAM DETAILS • 2018 budget includes $66.9 MM Land & of investment in facilities Seismic, $4.6MM Other, $16.5MM 2% including: 6% Sustaining & • PC Gas Plant Phase VI Opt., $17.1,MM completion including Phase 7% V/VI shallow-cut capability ($25.7 MM) Drilling & • Pipeline twinning ($11

Slide 18: 2018 Natural Gas Marketing
2018 NATURAL GAS MARKETING AECO $ 1.50 $ 0.02 $ 0.26 $ 1.22 Dawn $ 3.30 $ 0.09 ACE/ ATP/ $ 1.22 2018E Natural Gas Egress (GJ/d) 2018E Corporate Revenue ($MM) Alliance Alliance $ 1.99 2% 2% $ 3.30 $ 1.50 $ 0.08 $ 0.03 25% Note: All Birchcliff gas realizes a $ 1.23 $ 0.35 30% 47% 9% heat premium(1) $

Slide 19: Risk Management & Hedging
RISK MANAGEMENT & HEDGING • In 2019, approximately 63% of Birchcliff’s natural gas production will be sold at prices that are not based on AECO (based on 2018 mid-point production guidance) 19

Slide 20: Borrowing Base Details
BORROWING BASE DETAILS • Birchcliff has extendible revolving credit facilities in the aggregate principal amount of $950 million, which are comprised of an extendible revolving syndicated term credit facility of $850 million and an extendible revolving working capital facility of $100 million • Birc

Slide 21: Montney/Doig Resource Play
MONTNEY/DOIG RESOURCE PLAY A Significant Position in a World Class Play

Slide 22: Montney/Doig - A World Class Resource Play
MONTNEY/DOIG - A WORLD CLASS RESOURCE PLAY Resource density. Stacked resource up to 300 metres thick. Large areal extent. Extends over 50,000 square miles. Exceptional “fracability”. Low clay Birchcliff Montney/Doig content, low Poisson’s Ratio and high Young’s Modulus. Exceptional fracture stabilit

Slide 23: Montney/Doig Mineralogy Leads to Excellent Fracability
MONTNEY/DOIG MINEROLOGY LEADS TO EXCELLENT “FRACABILITY” The Montney/Doig Resource Play rock type is composed of a Some other Resource Plays have a high percentage of clays high percentage of hard minerals, and a low percentage of and soft minerals. When fractured this results in the rock clays and

Slide 24: Birchcliff Montney/Doig Resource Play
BIRCHCLIFF MONTNEY/DOIG RESOURCE PLAY • The Gordondale Acquisition added a fourth commercial development interval in the Montney D2 • Large contiguous land base with 349.4 sections prospective for the Montney/Doig as at December 31, 2017 • Birchcliff has contiguous land block at Pouce Coupe and Gord

Slide 25: Stacked Resource Provides Substantial Future Upside
STACKED RESOURCE PROVIDES SUBSTANTIAL FUTURE UPSIDE 25

Slide 26: Montney/Doig Multi Layer Opportunity
MONTNEY/DOIG MULTI LAYER OPPORTUNITY 3 2 1 4 5 6 5 6 4 3 2 1 26

Slide 27: Birchcliff Montney/Doig Inventory
BIRCHCLIFF MONTNEY/DOIG INVENTORY BIR MONTNEY/DOIG POUCE PDP/PDNP 1P Locations 2P Locations PDP/PDNP 1P Locations 2P Locations Gross Net Gross Net Gross Net Gross Net Gross Net Gross Net BD/MNTN D5 73.0 71.5 189.0 182.3 260.0 249.4 BD/MNTN D5 71.0 71.0 177.0 174.4 243.0 237.1 MNTN D4 12.0 12.0 17.0

Slide 28: Proximal to Infrastructure with Long Term Exposure to LNG Export
PROXIMAL TO INFRASTRUCTURE WITH LONG TERM EXPOSURE TO LNG EXPORT Montney/Doig Birchcliff Pouce Coupe Production Montney/Doig & PC Gas Plant Owned Infrastructure PC Gas Plant Nova Pipeline System North American Market LNG Export Source: RBC Energy Insights: The Montney – Tracking an Elephant August 1

Slide 29: Pouce Coupe Overview
POUCE COUPE OVERVIEW • Proven asset in development phase • Wells show high initial deliverability, low terminal decline and stable long term production • Predictable results with improving gas rates & liquids yields • 100% owned and operated • Expect to drill 14 (14.0 net) Montney/Doig horizontal na

Slide 30: 2017 Well Performance
Wh “LMMOooirjifa 2017 WELL PERFORMANCE Pouce Coupe Lower Montney (D1) Performance vs. Type Curve 9.000 ===. Deloitte Tier 0 Type Curve Raw Producing Day Gas Rate (Mscfd) Aa) So o Oo i é l 0 2 4 6 8 10 12 Normalized Producing Time (Months) Lower Montney (D1) = 2016 Lower Montney (D1) —— 2017 Lower Mo

Slide 31: Continued Well Improvement
CONTINUED WELL IMPROVEMENT 31

Slide 32: Continuous Cost and Design Refinement
CONTINUOUS COST AND DESIGN REFINEMENT Drilling costs have decreased while overall well costs have slightly Birchcliff Corporate Wellbore Evolution increased due to 7,500 increased2,500 frac intensity Lateral Length (m) and Frac Intensity (Ton per 1000m) 6,000 2,000 Average DCE Cost per Well (k$) 4,5

Slide 33: 2017 Liquids Summary Map
2017 LIQUIDS 2017 New Wells IP60 Rates (Avg. Per Well) SUMMARY MAP GORDONDALE: CRUDE OIL • Excellent Lower Montney oil inventory in D1 and D2 intervals • Engineered completions drive recovery factor improvements • EOR scheme under evaluation POUCE COUPE: CONDENSATE (C5+) • 2017 well results demonstr

Slide 34: 2018 Liquids Summary Map
2018 LIQUIDS 2018 New Well Production Test Rates SUMMARY MAP GORDONDALE: CRUDE OIL • Strong Montney D2 oil and total BOE test rates • Strong Montney D1 oil and total BOE test rates • Further refinements of engineered completions having positive results POUCE COUPE: CONDENSATE (C5+) • Strong Montney

Slide 35: Pouce Coupe Liquids Type Curve - 2018 Targeted Well
POUCE COUPE LIQUIDS TYPE CURVE – 2018 TARGETED WELL 5,000 Rate of Return (%) WTI ($US/bbl) $55/bbl $60/bbl $65/bbl $1.50/GJ 30% 32% 35% AECO 4,000 $2.00/GJ 46% 49% 51% Sales Gas Rate (Mscfd) $2.50/GJ 64% 68% 71% 3,000 NPV 10% ($MM) WTI ($US/bbl) $55/bbl $60/bbl $65/bbl 2,000 $1.50/GJ $3.2 $3.5 $3.8

Slide 36: Gordondale Overview
GORDONDALE OVERVIEW • Acquired in 2016, Gordondale consolidated a sizeable and contiguous land base within Birchcliff’s existing core area • High oil & NGLs weighting • Strategic infrastructure • Low base decline production • High quality development opportunities including the addition of a fourth

Slide 37: Gordondale Key Infrastructure
GORDONDALE KEY INFRASTRUCTURE Key Natural Gas Processing Infrastructure • Existing infrastructure has already AltaGas Gordondale CNRL Progress Sour Deep Cut Gas Plant Sour Shallow Cut Gas Plant supported peak production of 16-31-078-11W6 Licensed Capacity: ~135 MMcf/d 01-01-078-10W6 Acquired W.I.: ~

Slide 38: Gordondale Base Production History
GORDONDALE BASE PRODUCTION HISTORY 2017 Year-End 40,000 ~30,000 BOE/d Last well drilled in 2014 (on-stream Birchcliff 2015) with peak production of Acquisition ~35,000 boe/d (~22,000 BOE/d) Scheduled 35,000 AltaGas Plant Turnaround 30,000 AltaGas Deep Cut Plant on 2017 stream October 2012 and Produc

Slide 39: Gordondale D2 Oil Type Curve
GORDONDALE D2 OIL TYPE CURVE D2 Oil Tier 1 - Rate of Return (%) D2 Oil Tier 1 Type Curve D2 Oil Tier 2 Type Curve WTI ($US/bbl) 300 $55/bbl $60/bbl $65/bbl $1.50/GJ 81% 97% 115% AECO $2.00/GJ 94% 111% 130% 250 $2.50/GJ 108% 126% 146% Oil Rate (Bblpd) 200 D2 Oil Tier 1 - NPV 10% ($MM) WTI ($US/bbl) 1

Slide 40: Elmworth Development
ELMWORTH DEVELOPMENT • Received regulatory approval for an acid gas injection well in August 2016 Second Exploration • Preliminary planning underway for a Horizontal 100% owned and operated 40 MMcf/d natural gas processing plant; currently expected to be operational in the fall of 2022 First • Drill

Slide 41: Conceptual Montney/Doig Field Development Model
CONCEPTUAL MONTNEY/DOIG FIELD DEVELOPMENT MODEL STATUS OF MODEL CALIBRATION AND DERISKING FACIES & PETROPHYSICAL GEOLOGICAL, GEOPHYSICAL, GEOMECHANCAL HYDRAULIC FRAC & MICRO SEIS. RESERVOIR MODEL OPTIMIZED DCC & PRODUCTION BASAL DOIG / D5 T1 D4 T2 D3 D2 >T0 D1 >T0 C >T4 41

Slide 42: Pouce Coupe Drilling Performance
POUCE COUPE DRILLING PERFORMANCE Drill Cost Efficiency Average Drilling Speed (Spud to Rig Release) 800 300 750 Cost per Drilled Length ($/m MD) 2017 - $1,993k/well (4,832m MD, 32 Stages Planned) 250 2017 - 3.7 Days/1000m 700 2016 - $1,881k/well (4,492m MD, 20 Stages Planned) 2016 - 3.9 Days/1000m D

Slide 43: Pouce Coupe Lower Montney (D1) Core Area Completion Evolution
POUCE COUPE LOWER MONTNEY (D1) CORE AREA COMPLETION EVOLUTION Completion Cost per Stage vs. Number of Stages Proppant Intensity $400 40 1.00 200 Completion Cost Per Stage ($000's) 0.90 180 $350 35 Average Proppant Intensity (t/m) Average Number of Stages (#) Average Interfrac Spacing (m) 0.80 160 $3

Slide 44: Engineered Completions for Montney/Doig Full Field Development
ENGINEERED COMPLETIONS FOR MONTNEY/DOIG FULL FIELD DEVELOPMENT Industry Range Birchcliff Best Practices Oil Birchcliff Best Practices Gas Liner type Openhole or Cemented Openhole or Cemented Openhole Inter-well spacing 100 – 400 m (300 – 1,200 ft) 200 m (600 ft) 300 m (900 ft) Inter-frac spacing 20

Slide 45: Terminal Decline Changes
TERMINAL DECLINE CHANGES • Continued support for low terminal decline rates from Birchcliff’s existing wells and offsetting industry wells with significant production history. • Deloitte’s Tier 0 type curve has remained at 8.2 Bcfe sales with the same terminal decline rates of 11% Proved and 9% Prov

Slide 46: PC Gas Plant
PC GAS PLANT The Engine for Future Growth

Slide 47: Production Processed through the PC Gas Plant
Production Processed through the PC Gas 2013 2014 2015 2016 2017 Q1 2018 Plant Average daily production, net to Birchcliff: Natural gas (Mcf) 91,666 132,808 163,641 168,444 193,417 253,357 Oil & NGLs (bbls) 527 1,065 1,287 960 1,316 2,050 Total boe (6:1) 15,805 23,200 28,560 29,034 33,552 44,276 % o

Slide 48: Key Strategic Advantages of PC Gas Plant
Corporate Operating Costs vs. % of Natural Gas Sales Volumes Processed at the PC Gas Plant KEY STRATEGIC $10.00 100% Corporate Operating Cost ($/boe) Volume Through PC Gas Plant ADVANTAGES $8.00 $6.00 80% 60% • 100% owned and operated $4.00 40% • Generates operating cost savings of $2.00 20% approxi

Slide 49: PC Gas Plant Highlights
PC GAS PLANT HIGHLIGHTS • Current processing capacity of 260 MMcf/d • Phase V expansion was completed ahead of it’s initially scheduled October 1, 2017 completion date, adding 80 MMcf/d bringing total processing capacity to 260 MMcf/d 33% • Expect Phase VI expansion will be completed in October 2018

Slide 50: Building on Our Past
BUILDING ON OUR PAST Over 10 Years of Success

Slide 51: Birchcliff Timeline and Production Growth
Forecasted record annual Birchcliff’s average daily production was 67,963 boe/d in average production of 76,000-78,000 boe/d in 2017 compared to 2,793 boe/d in 2005, a compounded 2018 annual growth rate of 30% per year over that span. 2,793 boe/d 1 2 3 4 5 6 7 8 9 10 11 2004 2018 July 6, 2004: Birch

Slide 52: Production Growth and Operating & Cash Costs
Production Growth 80,000 300 70,000 boe/d/million wtd. avg. shares 250 60,000 Birchcliff has increased production at a 200 50,000 compound annual growth rate of boe/d 40,000 150 30,000 30% since 2005. 100 20,000 50 10,000 0 0 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Average P

Slide 53: Reserves Growth
Reserves Growth 1200 4,000 1000 3,200 Birchcliff has added significant low cost 800 reserves since commencing operations in boe/1,000shares MMboe 2,400 600 2005. On a per common share 400 1,600 basis, PDP, 1P and 2P reserves 200 800 grew 14% per year, 22% per year and 21% per year, 0 0 2005 2006 200

Slide 54: Appendix
VW QGCC[Co 'DCDBC SS GK D.D—C CDC C[E .G.BE[ \ \ \ a a WG GQQv Le LZ x Q 2 uu Oo. a <

Slide 55: 2017 Year End Montney/Doig Reserves
2017 YEAR END MONTNEY/DOIG 1,000,000 RESERVES Drilled 53 HZ M/D wells Drilled 20 HZ M/D wells and acquired 87 HZ M/D wells 900,000 348 (342.8 net) Montney/Doig horizontal Drilled 29 HZ M/D wells 800,000 wells drilled as of Dec 31, 2017 Drilled 41 HZ M/D wells 700,000 Drilled 25 HZ M/D wells Reserves

Slide 56: Montney/Doig Well Locations
MONTNEY/DOIG WELL LOCATIONS 56

Slide 57: Series A Perpetual Preferred Shares
SERIES A PERPETUAL PREFERRED SHARES Preferred Share Details Series A Number of Shares 2 million Issue Date August 8, 2012 TSX Trading Symbol BIR.PR.A Issue / Par Price $25.00 per share Quarterly Dividend $0.523375 per share Current Yield 8.374% Redeemable by Holder No • September 30, 2022: Series A

Slide 58: Series C Preferred Shares
SERIES C PREFERRED SHARES Preferred Share Details Series C Number of Shares 2 million Issue Date June 14, 2013 TSX Trading Symbol BIR.PR.C Issue / Par Price $25.00 per share Quarterly Dividend $0.4375 per share Yield at Issue 7.0% June 30, 2020 and each Redeemable by Holder quarter thereafter 2016 2

Slide 59: Executive Officers
EXECUTIVE OFFICERS Mr. Tonken is the President, Chief Executive Officer and Chairman of the Board of Birchcliff. He has more than 36 years of A. Jeffery experience in the oil and natural gas industry and is one of the Corporation’s founders. Prior to creating Birchcliff, Mr. Tonken founded and serve

Slide 60: Executive Officers
EXECUTIVE OFFICERS Mr. Carlsen is the Vice-President, Engineering of Birchcliff and is a Professional Engineer. He previously served as Asset Christopher A. Team Lead and Senior Exploitation Engineer with Birchcliff. Mr. Carlsen is a Professional Engineer with more than 16 years of experience in the

Slide 61: Board of Directors
BOARD OF DIRECTORS A. Jeffery Tonken See Mr. Tonken’s biography under “Executive Officers”. President, CEO and Chairman of the Board Mr. Shaw is a director of Birchcliff and has more than 29 years of experience in the oil and natural gas industry and is one of the Corporation’s founders. Prior to jo

Slide 62: Board of Directors
BOARD OF DIRECTORS Mr. Dawson is a director of Birchcliff. Prior to joining Birchcliff, Mr. Dawson was the Vice-President General Counsel and Corporate Secretary of AltaGas. Mr. Dawson joined AltaGas as Associate General Counsel in August 1997, after consulting Dennis with AltaGas Services Inc. from

Slide 63: Presentation of Oil and Gas Reserves and Resources
PRESENTATION OF OIL AND GAS RESERVES AND RESOURCES: Deloitte prepared the 2017 Consolidated Reserves Report, the 2017 Deloitte Reserves Report, and the 2016 Deloitte Reserves Report and the 2016 Resource Assessment. McDaniel prepared the 2016 McDaniel Reserves Report. Such evaluations were prepared

Slide 64: Advisories
Uncertainty Ranges for Resources Estimates of resource volumes can be categorized according to the range of uncertainty associated with the estimates. Uncertainty ranges are described in the COGE Handbook as low, best and high estimates as follows: • A “low estimate” (1C) is considered to be a conse

Slide 65: Non-GAAP Measures
With respect to disclosure of F&D costs disclosed in this presentation: F&D costs including FDC have been presented herein. F&D costs for each reserves category in a particular period are calculated by taking the sum of: (i) exploration and development costs incurred in the period; and (ii) the chan

Slide 66: Thank You Team Birchcliff
THANK YOU TEAM BIRCHCLIFF Jeffrey Akeroyd, Bradley Alexander, Karen Allen, Camille Ashton, Gates Aurigemma, Valerie Babkov, Bryce Baloun, Angela Belbeck, Charmaine Belley, Tyrus Bender, Daniel Blattler, Calvin Bohdan, Angela Boire, Darryl Bolch, Deborah Borthwick, Myles Bosman, Jeff Boswell, Robyn B
Source: Internet Archive copy of birchcliffenergy.com
More decks from Birchcliff Energy Ltd.
Investor Presentation (November 2026)51 slides · Nov 12, 2026
Investor Presentation (August 2026)51 slides · August 2026
Investor Presentation (May 2026)53 slides · May 2026
Investor Presentation (March 2026)48 slides · March 2026
Investor Presentation (January 2026)46 slides · January 2026
Investor Presentation (November 2025)45 slides · November 2025