Boral Ltd.

Boral — Corporate Update (August 2018)

26 slides from Boral's corporate update, Aug 13, 2018

  1. Slide 1: Berrima Colliery - Closure Working Group

    Berrima Colliery - Closure Working Group >Welcome Mittagong RSL 13 August 2018

  2. Slide 2: Agenda

    Agenda 1. Welcome and introductions 2. History of colliery and decision to close 3. Site and surrounds 4. How did we get here 5. Current status 6. Next steps 7. CWG role and information needs 8. General business Titlefefefefeffff4g45g4545 9. Next meeting

  3. Slide 3: Introductions

    Introductions > Boral - Fabio Colusso, Greg Johnson, Rod Wallace > Resource Regulator - Greg Kininmonth, Will Mitry > Environment Protection Authority - William Dove, Andrew Couldridge > WaterNSW - Ravi Sundaram > Wingecarribee Shire Council - Barry Arthur Titlefefefefeffff4g45g4545 > Western Sydney

  4. Slide 4: History and decision to close

    History and decision to close ● Early mine workings in 1870’s ● Continuous operations since 1926 ● Bord and pillar mining - supplied cement works with coal ~250,000 tpa ● Legislative changes in 2007 - need development consent ● Development application for continued operations 2011 ○ Limited baseline

  5. Slide 5: Site and surrounding environment

    Site and surrounding environment Titlefefefefeffff4g45g4545

  6. Slide 6: Surface infrastructure

    Surface infrastructure Titlefefefefeffff4g45g4545

  7. Slide 7: Surface infrastructure – Pit Top

    Surface infrastructure – Pit Top Titlefefefefeffff4g45g4545

  8. Slide 8: Site and surrounding environment (cont'd)

    Site and surrounding environment (cont’d) Titlefefefefeffff4g45g4545 urce: Resource Regulator

  9. Slide 9: Cross sections plan view

    Cross sections plan view Titlefefefefeffff4g45g4545

  10. Slide 10: Cross section A

    Cross section A Titlefefefefeffff4g45g4545

  11. Slide 11: Cross section BB

    Cross section BB Titlefefefefeffff4g45g4545

  12. Slide 12: Cross section CC

    Cross section CC Titlefefefefeffff4g45g4545

  13. Slide 13: How did we get here?

    How did we get here? ● 2013 - Care & maintenance announcement ● 2014 - Decision to close - intention to fully seal ● 2015 - Geotechnical advice indicates high leakage ○ Consistent water quality – seek free draining mine ○ Lodge closure plan ● 2016 - Cease pumping – mine begins to free drain ○ Elevat

  14. Slide 14: Extent of flooded workings

    Extent of flooded workings Titlefefefefeffff4g45g4545

  15. Slide 15: Pit top trials used to design underground treatment trial

    Pit top trials during November 2017 were used to design underground treatment trial Titlefefefefeffff4g45g4545

  16. Slide 16: Current status

    Current status ● Underground treatment ● Assumption validation of sealing – interim sealing plan ● Gathering feedback (CWG) Titlefefefefeffff4g45g4545

  17. Slide 17: Underground treatment installed in stages Dec 2017 to Jan 2018

    The underground treatment was installed in 3 stages from early December 2017 until mid January 2018 Titlefefefefeffff4g45g4545

  18. Slide 18: Water Quality Improvements following treatment - Iron

    Water Quality Improvements following treatment - Iron Titlefefefefeffff4g45g4545

  19. Slide 19: Water Quality Improvements following treatment - Manganese

    Water Quality Improvements following treatment - Manganese Titlefefefefeffff4g45g4545

  20. Slide 20: Water Quality Improvements following treatment

    Water Quality Improvements following treatment Titlefefefefeffff4g45g4545

  21. Slide 21: Interim Sealing Plan - Roof bolting, dewatering & Bulkheads B1 - B7

    Interim Sealing Plan - Roof bolting works, dewatering & Bulkheads B1 - B7 Titlefefefefeffff4g45g4545

  22. Slide 22: Next steps

    Next steps ● Interim sealing plan to validate flow and porosity assumptions ● Further CWG consultation ● Lodgement of Stage 2 Closure Plan Titlefefefefeffff4g45g4545

  23. Slide 23: CWG role and information needs

    CWG role and information needs Titlefefefefeffff4g45g4545

  24. Slide 24: General business

    General business Titlefefefefeffff4g45g4545

  25. Slide 25: Next meeting date

    Next meeting date Titlefefefefeffff4g45g4545

  26. Slide 26: Slide 26

Boral — Corporate Update (August 2018) on 6ix