Slide 1: Duralie Coal CCC Meeting Presentation – Company Report & Overview of Activities
Duralie Coal CCC Meeting Presentation – Company Report & Overview of Activities August 2020 Michael Plain Environment & Community Superintendent
Slide 2: Table of Contents
Table of Contents 1. Agenda Item 7a - Progress at the Mine 2. Agenda Item 7b - Environmental Reporting 3. Agenda Item 7c - Environmental Management Plans & Monitoring 4. Agenda Item 7d - Community Complaints 5. Agenda Item 7e - Community Programs 2 3 August 2020 2
Slide 3: 1. Progress at the Mine
1. Progress at the Mine 1st Half 2020 No mining operations were undertaken at Duralie during the first half of 2020. Rehabilitation works continued with bulk shaping of the waste emplacement. AD1 decommissioning completed. 2nd Half of 2020 Stage 1 of PAF re-handling works is scheduled to be
Slide 4: 2. Environmental Reporting & Regulators
2. Environmental Reporting & Regulators Management Project Status Area Reporting • Duralie Coal Mine Annual Review • The Duralie Coal Mine 2019/20 Annual Review is due September 2020. The Annual 2019/20 Review will be made available to the CCC and on the Duralie Coal website. Regulator • Mining Oper
Slide 5: 3. Environmental Management Plans & Monitoring
3. Environmental Management Plans & Monitoring a) Air Quality Management b) Blast Management c) Noise Management d) Water Management e) Rehabilitation Management f) Biodiversity Management g) Mine Closure Planning 5 3 August 2020 5
Slide 6: 3a. Air Quality Management – Dust Deposition
3a. Air Quality Management Duralie Dust Deposition - Annual Rolling Average 12 Months to June 2020 8.0 Dust (g/m2/month) 6.0 4.0 2.0 0.0 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 D3 D4 D5 D5A D7 D8 D9 D10 D12 D13 DP&E limit Jul-19 Heavy - 30% Dirt, 0% Coal,
Slide 7: 3a. Air Quality Management – PM10 Monitoring
3a. Air Quality Management Duralie HVAS Monitoring (PM10) 12 Months to July 2020 200 PM10 (µg/m3) 150 100 50 0 4-Jun-19 3-Aug-19 2-Oct-19 1-Dec-19 30-Jan-20 30-Mar-20 29-May-20 28-Jul-20 High Noon Twin Houses Hattam Edwards DP&E Limit Duralie HVAS Monitoring (PM10) • All sites below DP&E limit. Typi
Slide 8: 3b. Blast Management
3b. Blast Management Management Project Status Area Blasting • Blast monitoring • Blast activities at the DCM were completed on 17 August 2018. No further blasting is proposed until further notice. • Note: Blast Compliance: No more than 5% of total blasts for annual monitoring period to exceed an ov
Slide 9: 3c. Noise Management
3c. Noise Management Management Project Status Area Noise • Routine Monitoring • Routine quarterly noise monitoring of operations recommenced in Q4 2019, to Monitoring monitor noise emissions from rehabilitation day works. • Quarterly monitoring continued during H1 2020. All results were compliant.
Slide 10: 3d. Water Management
3d. Water Management Management Project Status Area Site Water • Annual water balance review. • The 2019 annual site water balance review has been completed. A summary will be Management included in the Annual Review 2019/20. Surface Water • Routine monitoring • Multiple high flow rain events occurr
Slide 11: 3d. Water Management – Rainfall and Surface Water Monitoring
3d. Water Management Duralie Mine Site - Monthly Rainfall Duralie Surface Water Monitoring - pH 6 months to July 2020 12 300 11 10 200 9 Rainfall (mm) 8 7 100 6 5 0 31-Dec-19 30-Jan-20 29-Feb-20 30-Mar-20 29-Apr-20 29-May-20 28-Jun-20 28-Jul-20 SW2 - DCPL (CSC) SW2 RC - Rail Culvert DCPL (CSC) 2020
Slide 12: 3e. Rehabilitation Management
3e. Rehabilitation Management Management Area Project Status Rehabilitated Waste • Rehabilitation Works • 20ha of native rehabilitation was completed in H1 2020 including topsoil spreading emplacements and seeding. • Rehabilitation maintenance • Slashing and over-seeding of areas of pasture complete
Slide 13: 3e. Rehabilitation Management – Dam Decommissioning
3e. Rehabilitation Management Management Area Project Status Dam • Auxiliary Dam 1 • Decommissioning and rehabilitation of AD1 was completed in H1 2020, 20ha of non- Decommissioning native pasture. • AD1 Clay core was recovered and has been stockpiled for use for the clay lining in the Coal Shaft Cr
Slide 14: 3f. Biodiversity Management
3f. Biodiversity Management Management Project Status Area BMP • Biodiversity • A revision of the Biodiversity Management Plan has been prepared following the first 5 years of Management Plan implementation. A summary of the biodiversity offset works completed and the changes to the revision BMP is
Slide 15: 3f. Biodiversity Management
3f. Biodiversity Management Management Project Status Area Flora/Fauna • Nest Box Program • Nest box monitoring was undertaken during April 2020 including the new nest boxes in the rehabilitation area . A summary of the nest box progress will be included in the next Annual Review. Pest Control • Wil
Slide 16: 3g. Mine Closure Planning
3g. Mine Closure Planning Note: *Refer to Duralie Mining Operations Plan & Rehabilitation Management Plan Table 14 Mine Closure Planning Schedule. *Further detail on mine closure planning progress is included in the Annual Review 2019/20. Management Project Status Area Mine Closure • Stakeholder • C
Slide 17: 4. Community Complaints
4. Community Complaints Duralie Complaint Summary Period: 01/01/2020 - 30/06/2020 Period: 6 Months Total No. of Complaints: 0 (0 noise, 0 blast, 0 air quality, 0 other) Total No. of Complainants: 0 Date/Time of Method of Nature of Complaint Complainant Location Complaint Complaint Investigation/Outc
Slide 18: 5. Community Programs
5. Community Programs Management Area Project Status Support Programs Stratford Coal • Since 2010, Stratford Coal has granted over $600,000 to local community groups. Community Support • SCPL received a very good response from many community organisations in 2020 with 24 Program successful local com