Signature Resources Ltd. · TSXV:SGU

Signature Resources — Investor Presentation (September 2024)

29 slides from Signature Resources's investor presentation, September 2024

  1. Slide 1: Signature Resources Ltd. Corporate Update

    Signature Resources Ltd. Corporate Update September 2024 1

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS The materials contained herein are for informational purposes only. This is not considered an offer or solicitation to sell securities in any company in any manner. Except for the statements of historical fact contained herein, the information presented constitutes “forwar

  3. Slide 3: Simple Approach with Key Pieces in Place

    Simple Approach with Key Pieces in Place Established Gold Project Focused Strategy to Regional Targets Identified with district Potential Demonstrate Value  Asset in a Tier-One Jurisdiction  Optimized strategy to advance the  Advancing regional growth Lingman Lake Gold Project: prospects with ove

  4. Slide 4: Lingman Lake Project History

    LINGMAN LAKE PROJECT HISTORY  1939-42: gold discovered in vicinity of  1996: Echo Bay Mines drilled 11-holes Lingman Lake mine, probably South Zone totaling 2,051 m outside the current four area. patented claims.  1945: diamond drilling commences.  2013: Signature Resources acquired  1946: shaf

  5. Slide 5: Tier-1 Location: near the Prolific Red Lake Gold District

    Tier-1 Location: near the Prolific Red Lake Gold District 5

  6. Slide 6: Power/Road Infrastructure Rapidly Developing Nearby

    Power/Road Infrastructure Rapidly Developing Nearby The Government Project is the construction, operation, maintenance and retirement of approximately 1,630 km of a 115kV, 44kV, 25kV alternating current transmission system, located north of Red Lake and Pickle Lake, to connect to 17 remote First Nat

  7. Slide 7: Large Contiguous Land Package

    Large Contiguous Land Package Over 30km long covering 85% of the prospective Greenstone Belt 3% NSR’s on original claims with the rest of the ground being royalty free* • NSR is with vendor who sold three properties to Signature – 1.5% NSR on each property can purchase back for $1.5 million each 7 •

  8. Slide 8: 28,000m of Historical Drilling Completed

    28,000m of Historical Drilling Completed • Extensive near-surface gold mineralization discovered • Historical drilling only down to 200m • Open in all directions Historical UG Workings Drill hole traces (Decommissioned) View Looking South / High Grade Bulk Sampling* N Drilled depth of gold discovery

  9. Slide 9: High Grade Gold Drill Results

    High Grade Gold Drill Results • High-Grade gold pervasive across the entire known gold mineralization envelope View Looking South 9

  10. Slide 10: 2024 Geologic Model

    2024 Geologic Model • Updated Geologic Model has Extended the high grade Mineralization (>5 g/t) • Identified Moderate Grade Mineralization (>2g/t and <5 g/t) not previously a focus of the model View Looking South 10

  11. Slide 11: 2024 Model with AI Interpolation Modeling

    2024 Model with AI Interpolation Modeling • Use of AI Modeling has identified several interesting areas with data gaps. • Model reinforced by Geophysics Strengthens Confidence View Looking South AI Interpolation AI Interpolation 11

  12. Slide 12: 2024 Work Programs

    2024 Work Programs Historical UG Workings (Decommissioned) / High Grade Bulk Drill hole traces Sampling Drilled depth of gold discovery Post-Mineralization Diabase Dike 12

  13. Slide 13: 2024 Field Program

    2024 Field Program • 110 Samples collected and assayed. • Continue to compile and digitize historic camp activity. 13

  14. Slide 14: 2024 Field Program – South Zone

    2024 Field Program – South Zone 14

  15. Slide 15: 2024 Field Program – North Zone

    2024 Field Program – North Zone 15

  16. Slide 16: North Zone Drilling Gap

    North Zone Drilling Gap UV araaarhh a 3D NE View into west © LM21-21: 37 m vertical , 4 end of North Zone Channel samples etielsarnie : 4 _. depth 5.0 g/t/2.3m of iid W061 g/t/13.0m ay? We d Area of no drilling / ‘ = Channel sample 1.95 git /9.0m ae is ir Didbase dike North ye SIGNATURE NORTH ZONE A

  17. Slide 17: 2024 Drill Program

    2024 Drill Program 2a M2414 LM24-13 ‘SO68800N: '5968400N DRILL HOLE SYMBOLOGY Horizontal trace Drill hole ID ———» Collar ae sSranile ak + UM24-07 o. ste coke le Lvi24-06 24-01 Oe SIGNATURE RESOURCES Discipline | Execution | Integrity 2024 DIAMOND DRILL PROGRAM UTM NAD 83 Zone 15N LM24-05}

  18. Slide 18: Drilling - 2024

    Drilling - 2024 18

  19. Slide 19: 2024 Drill Program – Within the 2024 Geologic Model

    2024 Drill Program – Within the 2024 Geologic Model • Approximately 4,650m drill program to be completed this year • Completion of program will provide necessary data to complete initial NI 43-101 View Looking South 19

  20. Slide 20: 2024 Drill Program – Including AI Interpolation Targets

    2024 Drill Program – Including AI Interprolation Targets • Approximately 4,650m drill program to be completed this year • Completion of program will provide necessary data to complete initial NI 43-101 Historical UG Workings (Decommissioned) / High Grade Bulk View Looking South Sampling Drill hole t

  21. Slide 21: Drill Core

    Drill Core 21

  22. Slide 22: Vast Regional Discovery Potential and Growth Prospects

    Vast Regional Discovery Potential and Growth Prospects • Property-wide LIDAR and Geophysical surveys completed in 2021 • Preliminary regional exploration data assessments identified over 14 regional exploration areas • Major Potential Exists for New Regional Discoveries Lingman Lake Project Site 22

  23. Slide 23: Pathway to Delivering Shareholder Value

    Pathway to Delivering Shareholder Value •Updated Geologic model used to design 2024 drill program to most efficiently use our exploration funds to enrich our understanding and knowledge of the Lingman Lake Project. Field Program and Drill •Field program to improve structural mapping, nearby trenchin

  24. Slide 24: Why Own Signature?

    Why Own Signature? What’s Our Value Proposition  2024 will be a catalyst rich year Key Components in Place Underpinning  Company has significant investment in its owned Fundamental Value Generation and drilling rigs and exploration camp which improves Risk Management control and efficiency over dr

  25. Slide 25: Capital Structure and Shareownership

    Capital Structure and Shareownership As of July 31, 2024: • Shares Outstanding: 148,769,863 • Options Oustanding: 5,750,000 • Avg Ex Price $0.22 • Warrants Outstanding: 0 • Insiders Own >43% of shares outstanding Cash and Investments: $1.7m Debt Outstanding: $0.00 25

  26. Slide 26: Management

    Management J. Dan Denbow, CFA CEO, President and Director has spent over 30 years in capital markets with his most recent experience associated with USAA Investment Management Company. As a portfolio manager for USAA, Mr. Denbow was responsible for managing over US$4 billion in three strategies; a d

  27. Slide 27: Board of Directors

    Board of Directors Paolo Lostritto, P.Eng., Chairman of the Board has an extensive background in mining capital markets and working with companies across the globe since 1997 as they advance their projects through exploration, development, and production. Mr. Lostritto is currently serving on the Bo

  28. Slide 28: Board of Directors (Cont.) Advisors

    Board of Directors (Cont.) John Hayes M.Sc., MBA, P.Geo, Director, is a professional geologist with over 20 years of exploration, and many years of capital markets experience. John worked for ten years in mining equity research at BMO Capital Markets and at the time of his retirement in 2014 was a m

  29. Slide 29: End of Document

    End of Document www.signatureresources.ca 29

Signature Resources — Investor Presentation (September 2024) on 6ix