Pepco Holdings Inc

Pepco — Williams Capital Group Transmission Seminar (January 2012)

32 slides from Pepco's conference presentation, Jan 10, 2012

  1. Slide 1: Williams Capital Group Transmission Seminar

    Slide 1: Williams Capital Group Transmission Seminar

    NEW YORK, NY • JANUARY 11, 2012 Williams Capital Group Transmission Seminar William Gausman Senior Vice President, Strategic Initiatives

  2. Slide 2: Safe Harbor Statement

    Slide 2: Safe Harbor Statement

    Safe Harbor Statement Some of the statements contained in today’s presentation with respect to Pepco Holdings, Pepco, Delmarva Power and Atlantic City Electric, and each of their respective subsidiaries, are forward-looking statements within the meaning of the U.S. federal securities laws and are su

  3. Slide 3: Our Businesses

    Slide 3: Our Businesses

    Our Businesses Power PHI Service Territory Delivery Forecast Business Mix* 90 - 95% Energy Services 5 - 10% * Percentages based on projected operating income for 2011 - 2015 Note: See Safe Harbor Statement at the beginning of today’s presentation. 2

  4. Slide 4: Diverse, Stable Service Territory

    Slide 4: Diverse, Stable Service Territory

    Diverse, Stable Service Territory Regulatory Diversity, 2010 Rate Base Customer Diversity, 2010 MWh Sales Residential 37% Government 10% Industrial Commercial 6% 47% Diversified customer base and more stable employment trends help to minimize recessionary impacts on our service territory 3

  5. Slide 5: Rate Base Summary

    Slide 5: Rate Base Summary

    Rate Base Summary Distribution is 77% and Transmission is 23% of our 2010 year-end rate base Note: See Safe Harbor Statement at the beginning of today’s presentation. 4

  6. Slide 6: Capital Expenditures - 2012 - 2016 Forecast

    Slide 6: Capital Expenditures - 2012 - 2016 Forecast

    Capital Expenditures - 2012 - 2016 Forecast Distribution is 72% and Transmission is 28% of Power Delivery Capital Expenditures forecasted over the next five years (1) Assumes Mid-Atlantic Power Pathway (MAPP) in-service date of 2020. (2) Reflects the remaining anticipated reimbursement pursuant to a

  7. Slide 7: Transmission Overview

    Slide 7: Transmission Overview

    Transmission Overview Note: See Safe Harbor Statement at the beginning of today’s presentation. 6

  8. Slide 8: Generation Deactivations

    Slide 8: Generation Deactivations

    Generation Deactivations Approximately 847 MW of generation within the PHI footprint and surrounding area have been retired in the last 5 years Approximately 2415 MW have announced future deactivation dates Source: http://www.exeloncorp.com/powerplants/oystercreek/Pages/profile.aspx http://www.pjm.c

  9. Slide 9: Need for Transmission Enhancements

    Slide 9: Need for Transmission Enhancements

    Need for Transmission Enhancements • Need for new transmission lines is not primarily driven by load growth • NERC reliability requirements have added new operating requirements and, as a result, are a significant driver for new transmission facilities across all three operating companies • Generati

  10. Slide 10: Integrating Renewable Resources into the PHI System

    Slide 10: Integrating Renewable Resources into the PHI System

    Integrating Renewable Resources into the PHI System • The PHI service territory offers a unique opportunity with one of the greatest concentrations of strong off-shore wind resources existing along the Mid-Atlantic region • In order to develop large scale off-shore wind projects, additional transmis

  11. Slide 11: Need For Advanced Technologies

    Slide 11: Need For Advanced Technologies

    Need For Advanced Technologies • The transmission systems of the future will incorporate advanced technologies to control flow, manage voltage variations and improve monitoring for operations and maintenance requirements • PHI is incorporating these technologies into the systems we are building toda

  12. Slide 12: Benefits of New Technologies

    Slide 12: Benefits of New Technologies

    Benefits of New Technologies SVCs and HVDC • High speed switching to respond to changing conditions on the transmission system • Increases grid voltage by supplying reactive power • Decreases grid voltage by consuming reactive power • Control flows on the system • HVDC can provide black start and Bi

  13. Slide 13: Benefits of New Technologies

    Slide 13: Benefits of New Technologies

    Benefits of New Technologies Aluminum Conductor Composite Reinforced • Stable, compatible (ACCR) • Less sag at high temperatures - maintain or Aluminum materials, Oxide improve clearances at high energy levels Fibers even at high temperatures • Higher strength-to-weight ratio - maintain or improve s

  14. Slide 14: Benefits of New Technologies

    Slide 14: Benefits of New Technologies

    Benefits of New Technologies Phasor Monitoring Units and Dissolved Gas Analysis • Measurements of voltages and currents, which are time-tagged with high precision via GPS time signal receivers • Operators can make better control decisions • Enhanced post-disturbance analysis • Continuous asset monit

  15. Slide 15: Mid-Atlantic Power Pathway - Project Update

    Slide 15: Mid-Atlantic Power Pathway - Project Update

    Mid-Atlantic Power Pathway - Project Update • PJM provided notice to PHI in August 2011 that the MAPP project in-service date will be delayed until 2019 - 2021 • PHI suspended most permitting, engineering, and environmental studies • Maryland PSC approved our request to delay the procedural schedule

  16. Slide 16: PHI - Positioned for Growth

    Slide 16: PHI - Positioned for Growth

    PHI - Positioned for Growth • $5.6 billion in planned infrastructure investment over 5 years, with 28% in transmission • Significant transmission growth to support generation retirements and NERC policy compliance • Timely transmission cost recovery by FERC formula and incentive rates • Reasonable r

  17. Slide 17: Williams Capital Group Transmission Seminar

    Slide 17: Williams Capital Group Transmission Seminar

    NEW YORK, NY • JANUARY 11, 2012 Williams Capital Group Transmission Seminar William Gausman Senior Vice President, Strategic Initiatives

  18. Slide 18: Appendix

    Slide 18: Appendix

    Appendix y Pepco Holdings Inc

  19. Slide 19: Transmission Projects 2012 - 2016

    Slide 19: Transmission Projects 2012 - 2016

    Transmission Projects 2012 - 2016 ACE Notes: 1.Common Mode outages include line faults associated with stuck breaker, double circuit tower line, and faulted circuit breakers and buses 2.N-1-1 outages ensure facilities can be operated within normal thermal and voltage limits after N-1 (single) contin

  20. Slide 20: Transmission Projects 2012 - 2016 (DPL)

    Slide 20: Transmission Projects 2012 - 2016 (DPL)

    Transmission Projects 2012 - 2016 DPL Note: See Safe Harbor Statement at the beginning of today’s presentation. 19

  21. Slide 21: Capital Expenditures Forecast - Updated November 2011

    Slide 21: Capital Expenditures Forecast - Updated November 2011

    Capital Expenditures Forecast - Updated November 2011 (1) Reflects the remaining anticipated reimbursement pursuant to awards from the U.S. DOE under the ARRA. (2) Installation of AMI in New Jersey is contingent on regulatory approval ($9 million in 2015, $92 million in 2016). (3) Assumes MAPP in-se

  22. Slide 22: Forecast Capital Expenditures Comparison

    Slide 22: Forecast Capital Expenditures Comparison

    Forecast Capital Expenditures Comparison * Amounts are net of anticipated reimbursement pursuant to awards from the U.S. DOE under the ARRA. Note: See Safe Harbor Statement at the beginning of today’s presentation. 21

  23. Slide 23: Distribution Rate Cases - Pending Pepco - District of Columbia

    Slide 23: Distribution Rate Cases - Pending Pepco - District of Columbia

    Distribution Rate Cases - Pending Pepco - District of Columbia Regulatory lag mitigation measures proposed: • Reliability Investment Recovery Mechanism (RIM) • Fully forecasted test years Drivers of requested increase: •Rate base growth/reliability investments •Investment in Advanced Metering Infras

  24. Slide 24: Distribution Rate Cases - Pending Atlantic City Electric - New Jersey

    Slide 24: Distribution Rate Cases - Pending Atlantic City Electric - New Jersey

    Distribution Rate Cases - Pending Atlantic City Electric - New Jersey Drivers of requested increase: • Rate base growth/reliability investments Regulatory lag mitigation measure proposed in a separate filing made October 18, 2011: • Request the continuance and expansion of the recently completed Inf

  25. Slide 25: Distribution Rate Cases - Pending Delmarva Power - Delaware Electric

    Slide 25: Distribution Rate Cases - Pending Delmarva Power - Delaware Electric

    Distribution Rate Cases - Pending Delmarva Power - Delaware Electric Two regulatory lag mitigation measures proposed Drivers of requested increase: in filing: • Rate base growth/reliability investments •Reliability Investment Recovery Mechanism - provides full • Increase in operating expenses and ti

  26. Slide 26: Distribution Rate Cases - Pending Delmarva Power - Maryland

    Slide 26: Distribution Rate Cases - Pending Delmarva Power - Maryland

    Distribution Rate Cases - Pending Delmarva Power - Maryland Regulatory lag mitigation measures proposed in Drivers of requested increase: filing: • Rate base growth/reliability investments •Reliability Investment Recovery Mechanism (RIM) • Recovery of Hurricane Irene restoration • Fully forecasted t

  27. Slide 27: Distribution Rate Cases - Pending Pepco - Maryland

    Slide 27: Distribution Rate Cases - Pending Pepco - Maryland

    Distribution Rate Cases - Pending Pepco - Maryland Regulatory lag mitigation measures proposed in Drivers of requested increase: filing: • Rate base growth/reliability investments •Reliability Investment Recovery Mechanism (RIM) • Recovery of Hurricane Irene restoration •Fully forecasted test years

  28. Slide 28: Distribution Rate Cases - The Current Cycle

    Slide 28: Distribution Rate Cases - The Current Cycle

    Distribution Rate Cases - The Current Cycle • Filing Cycle Status – Pepco DC Pending - Filed July 2011 – Atlantic City Electric NJ Pending - Filed August 2011 – Delmarva Power DE - Electric Pending - Filed December 2011 – Delmarva Power MD Pending - Filed December 2011 – Pepco MD Pending - Filed Dec

  29. Slide 29: Pepco - Maryland Reliability Case 9240

    Slide 29: Pepco - Maryland Reliability Case 9240

    Pepco - Maryland Reliability Case 9240 • Related to power outages caused by severe weather in Pepco’s service territory in 2010 • Public Service Commission initiated the proceeding for Pepco in August 2010 to investigate the reliability of the electric distribution system and the quality of service

  30. Slide 30: Reliability Standards - Maryland

    Slide 30: Reliability Standards - Maryland

    Reliability Standards - Maryland Maryland (PSC - RM43) - Rule making proceeding applying to all electric utilities in the state to establish comprehensive reliability and service standards • Following working group process and rule making hearings, Commission approved draft rules establishing requir

  31. Slide 31: Reliability Standards - District of Columbia

    Slide 31: Reliability Standards - District of Columbia

    Reliability Standards - District of Columbia District of Columbia - New reliability standards adopted in July 2011, further technical revisions proposed December 2011 • New rules require improvement in reliability performance (outage frequency and duration) on an annual basis beginning in 2013 and c

  32. Slide 32: Cross-Border Energy Lease Status

    Slide 32: Cross-Border Energy Lease Status

    Cross-Border Energy Lease Status • Equity investment as of September 30, 2011 of $1.3 billion • Annual tax benefits of $52 million • Annual net earnings of $21 million • Current Status: – IRS audit settlement approved in November 2010 for the 2001/2002 periods; disallowed net losses on the cross-bor

Source: SEC EDGAR · 8-K filed Jan 10, 2012

More decks from Pepco Holdings Inc