  1. Slide 1: Transatlantic Mining - High-Grade U.S. Gold & Silver Explorer & Developer

    July 2018 TRANSATLANTIC MINING - HIGH-GRADE U.S. GOLD & SILVER EXPLORER & DEVELOPER

  2. Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT TSX-V: TCO Disclaimer – Transatlantic Mining Corp (“TRANSATLANTIC” or “The Company”) has prepared this presentation based on the information available to it. No representation or warranty, expressed or implied, is made as to the fairness, accuracy, completeness or correctness of

  3. Slide 3: Corporate Structure

    CORPORATE STRUCTURE TSX-V: TCO BOARD Shares on Issue as of June 2018 61.8 M CEO Bernie Sostak Warrants on Issue: (average @ 25 cents 3 years) Geology, 30 yrs experience 45.3 M Chairman Ray Parry Diluted shares 107.1 M Finance, 30 yrs experience Current Share Price 4 cents Independent Michael Hulmes

  4. Slide 4: Company Project Overview

    COMPANY PROJECT OVERVIEW TSX-V: TCO A precious metal and base metal explorer and mine developer with three company-making projects: ➢ Staged purchase of Alder Mountain Project including US Grant Gold-Silver Mine & Mill in Montana (USA) ➢ Option to lease or purchase the Kearsarge Gold Project in Mont

  5. Slide 5: Corporate Summary

    CORPORATE SUMMARY TSX-V: TCO New Mine Opportunity Drill, mine and develop gold and silver concentrate from known high-grade, multiple vein system US Grant Mine Property US Grant Purchase Mine and Mill Purchased Strategic US Grant Mine-Mill Project to acquire 100% ownership1 US Grant Mine Development

  6. Slide 6: Experienced Management Team & Board

    EXPERIENCED MANAGEMENT TEAM & BOARD TSX-V: TCO Board Bernie Sostak, Chief Executive Officer (CEO) Commercial Geologist, B.Sc., Diploma Business, MAusIMM, with over 25 years’ experience in the gold mining industry, most recently as General Manager of Business Development and Technical Services for AS

  7. Slide 7: US Grant Gold/Silver Mine & Mill

    US GRANT GOLD/SILVER MINE & MILL TSX-V: TCO ▪ Located in the Virginia City District which has produced ~9 million ounces gold and silver ▪ Group of patented and unpatented claims within the Alder Mountain Project ▪ Includes 535 acre total land package ▪ 5 patented and 28 unpatented claims ▪ Historic

  8. Slide 8: Ground Breaking Year – US Grant Mine

    GROUND BREAKING YEAR – US GRANT MINE Explored Commission Build Mine Concentrate Mill ➢ Focus on the permitted US Grant Mine to generate future cash flow ➢ Exploring new areas - drill results include 2.8 m at 19.3 g/t Gold Equivalent (Au Eq)1 ➢ Installed two ball mills with a capacity of 150 tpd and

  9. Slide 9: US Grant Mine - US Grant Vein

    US GRANT MINE - US GRANT VEIN TSX-V: TCO US Grant Vein is primary mine target with new drilling and assays 9

  10. Slide 10: US Grant Mine - US Grant Vein

    US GRANT MINE - US GRANT VEIN TSX-V: TCO ➢ Portal established ➢ Drilling intersecting new US Grant Vein position where no known historical workings previous ➢ Access to mineralised vein less than 200 m ➢ High grade vein with low grade halo in 11 holes ➢ Parallel El Fleeda exploration upside and not

  11. Slide 11: Alder Mountain Project - Exploration Potential

    ALDER MOUNTAIN PROJECT - EXPLORATION POTENTIAL US Grant Mine ▪ Gold-Silver quartz veins, dipping 45 degrees, 0.5 to 7.0 meters wide and 1,200 US Grant / El Fleeda Limited historical drilling ❖ Parallel systems Open in all directions m strike partially developed ❖ Simple access Simple access ▪ El Fle

  12. Slide 12: US Grant Gold/Silver Mine & Mill

    US GRANT GOLD/SILVER MINE & MILL TSX-V: TCO ▪ Permits in place for mine and processing activities at the US Grant Mine and Mill ▪ Production start up target goal of 10,000 - 20,000k ounces gold equivalent (Au Eq)2 in 2018.1,2 20183,4 20193,4 10k – 20k >10k – 20k Eq Au Ounces5 Eq Au Ounces5 ▪ Potenti

  13. Slide 13: US Grant – Mine Ready

    US GRANT – MINE READY TSX-V: TCO ▪ Progress to Modern Decline Mining - Low capital required to access new Vein ▪ Trial Mining to minimum 4 feet wide established ▪ Mill commissioned to 150 tons per day ▪ Operate all year round and toll treating opportunities 13 TRANSATLANTIC MINING - AN EMERGING META

  14. Slide 14: Kearsarge Gold Project

    KEARSARGE GOLD PROJECT ▪ Located in the historical Virginia City Mining District only 5 miles (8 km) from the US Grant Mill ▪ 1995 historical resource estimate reported ~ 600,000 ounces Au1 (Red hatching) ▪ Kearsarge group of claims: ▪ 35 patented claims ▪ over 700 acres ▪ > 6 line kilometres of mul

  15. Slide 15: Kearsarge Gold Project - Greater Exploration

    KEARSARGE GOLD PROJECT-GREATER EXPLORATION ▪ Initial Area of focus on the Big and Kearsarge Vein ▪ Near Mining Opportunity Significant Intersections : • Big Vein Highlighted drillhole grades (**) : Hole # 70 -1-94 5.9 metres (17.6 feet ) at 31.15 g/t Au (1.0 Oz/t Au)- True width 5.9 m 70 -3-94 7.5 m

  16. Slide 16: Kearsarge Gold Project - Exploration Potential

    KEARSARGE GOLD PROJECT - EXPLORATION POTENTIAL ▪ Multiple gold veins in shear zones, dipping 70 degrees, discrete to 33 feet wide (10 m) selective domains ▪ Historical drilling with reported grades to1: 45 ft at 0.269 oz/t Au 2,500 – 3,500 oz Au/m (13.7 m @ 8.3 g/t Au ) Within zone of 150 ft at 0.09

  17. Slide 17: Kearsarge Gold Project - Long Section Planes

    KEARSARGE GOLD PROJECT-LONG SECTION 2 PLANES -BIG VEIN AND KEARSARGE VEINS 1 See News Release March 2 2018 Kearsarge Drilling Update: and Appendix C also 17 TRANSATLANTIC MINING - AN EMERGING METALS EXPLORER & DEVELOPER

  18. Slide 18: Kearsarge - Lease / Purchase Agreement

    KEARSARGE - LEASE / PURCHASE AGREEMENT TSX-V: TCO KEARSARGE CLAIM GROUP (KCG) LEASE/PURCHASE OPTION1 ➢ First Renewal Term of 12 months following expiry of due diligence period for US$40,000 ➢ Second Renewal Term of ten years following 1st renewal term with following sequential conditions: • US$100,0

  19. Slide 19: Monitor Copper/Gold/Silver Project

    MONITOR COPPER/GOLD/SILVER PROJECT ▪ Already earned-in for 80% of Monitor Project JV in Coeur D’Alene (Silver Valley), Idaho for US2.1M ▪ Second largest silver producing area in the world ▪ Comprises 20 unpatented claims and 402 acres. Includes four old mines: Monitor, Richmond, St. Lawrence and Cop

  20. Slide 20: Monitor Copper/Gold/Silver Project

    MONITOR COPPER/GOLD/SILVER PROJECT ▪ Monitor average copper grade mined prior to 1920 was ~15% Cu with highest reported grade of 30.5% ▪ + Associated metals accompanying Cu: Au 7.2 g/t, Ag 22.5 g/t ▪ Richmond average copper grade produced was 7.5% Cu prior to 1920 ▪ + Associated metals accompanying

  21. Slide 21: Monitor Project - Exploration Upside

    MONITOR PROJECT - EXPLORATION UPSIDE TSX-V: TCO BIG ELK PROSPECT ▪ Sulphide deposit at surface, including a high- grade, Cu sample of 30.8% within 1 metre of sub surface ▪ Known veins with extensions from adits recently accessed ▪ High grade Cu along 800+ m strike on two veins - Monitor and Richmond

  22. Slide 22: Company Activity Timeline Outlook

    COMPANY ACTIVITY TIMELINE OUTLOOK TSX-V: TCO 2017 2018 Q1 Q2 Q3 Q4 US Grant Lease Trial Mining ⚫ US Grant Surface Exploration Drilling ⚫ US Grant Mill Upgrade to 150 tpd capacity ⚫ First Trial Mine Concentrate Revenue ⚫ Purchase - Alder Mountain Project ⚫ ⚫ Financing ⚫ ⚫ Modern Equipment - New Decli

  23. Slide 23: Why Transatlantic? Converting Projects into Mines

    WHY TRANSATLANTIC? CONVERTING PROJECTS INTO MINES Gold and Silver US Grant Mine/Mill – trial mining 40,000 tonnes and processing to a 12 month cash flow US Grant Mine & Mill US Grant Mine-Mill Project as an Asset. Future expansion cases from 150 - 300 tpd Purchase processing capacity1 US Grant Explo

  24. Slide 24: Contact

    TSX-V: TCO Contact Bernie Sostak (CEO) +1 (604) 424-8257 +61(0) 439 904 044 bsostak@transatlanticminingcorp.com 24

  25. Slide 25: Appendix A – Drilling Assay Results

    APPENDIX A – DRILLING ASSAY RESULTS TSX-V: TCO Nesbert Nyama is an Independent, Qualified Person responsible for having reviewed and verified the technical information contained in this presentation. See also NI 43-101“US Grant Mine Property Geology and Mineralisation report July 28 2017 -Significan

  26. Slide 26: Appendix B – Exploration Target Potential

    APPENDIX B – EXPLORATION TARGET POTENTIAL1 TSX-V: TCO 1Exploration target for the project is conceptual in nature and in the range of 350,000 to 750,000 ounces Au Eq. at 0.19 ounce/ton to 0.3 ounce/ton Au Eq. The potential quantity and grade is conceptual in nature as there has been insufficient exp

  27. Slide 27: Appendix C – Kearsarge Drill Results

    APPENDIX C – KEARSARGE DRILL RESULTS True Width Historic Drillhole Number From (ft) To (ft) Length (ft) Length (m) (m) # g/t Au Oz/t Au Elevation Vein 70-1-94 16.8 34.4 17.6 5.9 5.9 31.15 1.00 7029.7 Big Vein 70-2-94 31.0 32.5 1.5 0.5 0.4 66.52 2.14 7030.9 Big Vein 48.5 59.3 10.8 3.6 2.9 12.20 0.39