Panther Metals Plc · LSE:PALM

Panther Metals — Technical Presentation (April 2025)

20 slides from Panther Metals's technical presentation, April 2025

  1. Slide 1: Dotted Lake Project

    C R I T I C A L MI N E R A L S E X P L O R AT I O N & D I S C O V E RY DOTTED LAKE PROJECT Combined Soil Geochemistry Datasets 2021 & 2024 Dated: April 2025

  2. Slide 2: Dotted Lake Project Combined Soil Survey Datasets

    Dotted Lake Project Combined Soil Survey Datasets P a n t h e r M e t a l s S o i l Ge o c h e m i c a l S ur v e y s 2 0 2 1 & 2 0 2 4

  3. Slide 3: Dotted Lake Soil: Gold Grid

    Nooosi 8 NoooLtts No0091 9s NOoOsLes Dotted Lake Soil: Gold Grid ‘5690005 Dotted Lake 5970006 '592000E Map Legend 07s .cotz 6.9764 Hap background: GOV Canada - Top. UTM Zane 16% NADES Datum

  4. Slide 4: Dotted Lake Soil: Gold

    D ot t e d La ke S o i l : Go l d (> 10 ppb Au Labels)

  5. Slide 5: Dotted Lake Soil: Silver Grid

    D ot t e d La ke S o i l : S i l v e r G r i d

  6. Slide 6: Dotted Lake Soil: Silver

    D ot t e d La ke S o i l : S i l v e r (> 0.2 ppm Ag Labels)

  7. Slide 7: Dotted Lake Soil: Zinc Grid

    Nooosi 8 NoooLtts No0091 9s NOoOsLes Dotted Lake Soil: Zinc Grid ‘5690005 Dotted Lake 5970006 ‘5920006 Map Legend 202 24.18

  8. Slide 8: Dotted Lake Soil: Zinc

    D ot t e d La ke S o i l : Zi nc (> 100 ppm Zn Labels)

  9. Slide 9: Dotted Lake Soil: Copper Grid

    D ot t e d La ke S o i l : C op p e r G r i d

  10. Slide 10: Dotted Lake Soil: Copper

    D ot t e d La ke S o i l : C op p e r (> 100 ppm Cu Labels)

  11. Slide 11: Dotted Lake Soil: Nickel Grid

    D ot t e d La ke S o i l : Ni c ke l G r i d

  12. Slide 12: Dotted Lake Soil: Nickel

    D ot t e d La ke S o i l : Ni c ke l (> 75 ppm Ni Labels)

  13. Slide 13: Dotted Lake Soil: Cobalt Grid

    D ot t e d La ke S o i l : C ob a l t G r i d

  14. Slide 14: Dotted Lake Soil: Cobalt

    D ot t e d La ke S o i l : C ob a l t (> 21 ppm Co Labels)

  15. Slide 15: Dotted Lake Soil: Palladium Grid

    D ot t e d La ke S o i l : P a l l a d i um G r i d

  16. Slide 16: Dotted Lake Soil: Palladium

    D ot t e d La ke S o i l : P a l l a d i um (> 10 ppb Pd Labels)

  17. Slide 17: Dotted Lake Soil: Chromium Grid

    D ot t e d La ke S o i l : C hr o m i u m G r i d

  18. Slide 18: Dotted Lake Soil: Chromium

    D ot t e d La ke S o i l : C hr o m i u m (>80ppb Cr Labels)

  19. Slide 19: Soil Sample Analytical Method Details

    S o i l S a m p l e A n a l y t i c a l M e t h od D e t a i l s • Soil samples were analysed by ALS Laboratories in Thunder Bay using PREP-41 (preparation code) and ME-MS41L assay method. • Lowest Detection Limit Multi-Element Super Trace method ideal for exploration in soils or sediments, not appr

  20. Slide 20: Contact

    CONTACT L S E: PA LM Eastways Enterprise Centre, 7 Paynes Park, Hitchin, Hertfordshire, SG5 1EH +44 (0)1462 429 743 / +44 (0) 7971957685 www.panthermetals.com info@panthermetals.com @panthermetals

Panther Metals — Technical Presentation (April 2025) on 6ix