Stadler Rail Ag · SIX:SRAIL

Stadler Rail — Investor Day (March 2025)

119 slides from Stadler Rail's investor day presentation, Mar 19, 2025

  1. Slide 1: Capital Markets Day 2025

    Capital Markets Day 2025 Bussnang, 19 March 2025

  2. Slide 2: Strategy update

    Peter Spuhler Chairman of the Board Strategy update Capital Markets Day 2025 | 19.03.25 | © Stadler

  3. Slide 3: Stadler – at a glance

    Stadler – at a glance Est. 1942 ~ 15 000 employees ~ 270 customers Swiss values ~ 12 000 vehicles in 49 countries 8 procuction- and 8 component-sites globally 6 engineering- 80+ Service- locations locations Capital Markets Day 2025 | 19.03.25 | © Stadler 4

  4. Slide 4: Environmental disasters as a major challenge

    Environmental disasters as a major challenge Sierre (30.06.2024) − Flooding of Constellium plant in Sierre − 850t of the 1200t of aluminum profiles in storage had to be scrapped − Partial loss of production: backlog will be made up in August 2025 Dürnrohr (17.09.2024) − Heavy rainfall led to a dam b

  5. Slide 5: Development since the IPO on 12 April 2019

    Development since the IPO on 12 April 2019 2018 2024 Workforce (FTE) ~8 900 +71% ~15 000 Order backlog (CHF bn) 13.2 +121% 29.2 Net revenue (CHF bn) 2.0 +63% 3.3 EBIT-margin 7.5% -4.4pp 3.1% Shareprice (CHF)1 38.0 -39% 23.0 COVID-19 & Inflation & FX Russian war in Ukraine, Energy Floodings in Spain,

  6. Slide 6: Challenging global environment since 2019

    Challenging global environment since 2019 FX headwinds – Major negative impacts on project margins from Euro deterioration Covid-19 – Supply chain disruptions Stadler IPO – Delays in vehicle takeovers, revenue and cash-in – Inflation Russian war in Ukraine – Supply chain disruptions – Energy cost cr

  7. Slide 7: Overview rolling stock OEM market

    Overview rolling stock OEM market Stadler’s Strategic Markets 2023 Market Size (€bn) 1 Global Railway Market 2 Target Market 3 Target Regions 2023-28 (1) CAGR 207 160 59 32 +4.0% +4.0% +4.8% +5.8% Infrastructure 47 Freight Wagons 15 System Technology (2) OEM 11 22 LRV 3 Railway Market 2023-28 CAGR A

  8. Slide 8: SCI market shares by region

    SCI market shares by region (2022-2024) Home markets North America: EUR 2.4 bn Europe: EUR 13.9 bn CIS: EUR 4.5 bn Others 6% CRRC (2%) 1% Others Stadler (2%) 1% Others Wabtec (3%) 6% CRRC Pesa (1%) 2% 10% Alstom (3%) 2% Stadler (6%) Alstom Ust-Katav (2%) 3% 11% 8% 24% (23%) Skoda (5%) 6% (37%) 38% S

  9. Slide 9: SCI market shares Europe by segment

    SCI market shares Europe by segment (2022-2024) Focus Segments Multiple Units: EUR 5.9 bn LRV: EUR 1.9 bn Locomotives: EUR 1.9 bn Others Newag (3%) 4% Pesa 3% Others Others Alstom CAF (3%) 3% 6% (27%) Pesa (4%) 5% 6% 26% 22% Skoda (5%) 8% Alstom Vossloh (4%) 6% Siemens (39%) 42% (37%) 39% Siemens (7

  10. Slide 10: Stadler widens its focus within the overall rail ecosystem

    Stadler widens its focus within the overall rail ecosystem Infrastructure Feasibility study Rolling Maintenance and Economic Planning Funding Operation Stock & Service feasibility Signalling (incl. Wayside) With Rolling Stock at its core, Stadler addresses growing customer demand for complete soluti

  11. Slide 11: The Stadler core strategic dimensions

    The Stadler core strategic dimensions Market- segments Geographic Products & markets Solutions Stadler operates in selected market segments with high-quality products and solutions in specific geographical markets Capital Markets Day 2025 | 19.03.25 | © Stadler 12

  12. Slide 12: Example of Stadler core strategic dimensions

    Example of Stadler core strategic dimensions Green Technology Locomotives Market- New market segment to Market demand for segments meet growing customer interoperable and demand for multisystem locomotive is decarbonization of rail growing. fleets Europe & USA Europe RS FLIRT Locs RS ZERO for Geogra

  13. Slide 13: Innovation as our driver for long term profitable growth

    Innovation as our driver for long term profitable growth Vehicle Commissioning Delivery, Technology & concept & Tendering Order intake Manufacturing & revenue, Innovation product homologation EBIT development Process takes 4 - 10 years on average Capital Markets Day 2025 | 19.03.25 | © Stadler 14

  14. Slide 14: Conservative revenue recognition and production output

    Conservative revenue recognition and production output 8.6 ∅ order intake > 5.0 >5.0 Comments CHF 6.8 bn 6.8 ~95% >80% 6.4 ‐ Revenue recognition for trains based on conservative units of 5.6 delivery method 4.2 ‐ This leads to a multi-year lag 3.9 between operational activity 3.63.8 3.8 3.6 3.6 3.3

  15. Slide 15: Strategic thrusts

    Strategic thrusts Geographical Green expansion Technology Digitalisation Capital Markets Day 2025 | 19.03.25 | © Stadler 16

  16. Slide 16: Q&A

    Q&A Capital Markets Day 2025 | 19.03.25 | © Stadler 17

  17. Slide 17: Operations

    19.03.2025 Markus Bernsteiner Operations Capital Markets Day 2025 | 19.03.25 | © Stadler

  18. Slide 18: Agenda

    AGENDA 01 Current challenges and measures taken 02 Operational fields of action Core dimensions for profitable growth 03 Operational implementation Processes, systems & organisation Capital Markets Day 2025 | 19.03.25 | © Stadler 19

  19. Slide 19: Current challenges

    01 Current challenges Capital Markets Day 2025 | 19.03.25 | © Stadler

  20. Slide 20: Environmental disasters

    Environmental disasters Sierre − Adjustment of production plans according to reprioritization of orders − Examination of possible cleaning concepts for damaged profiles Measures taken − Short-time working in St. Margrethen & arrangement of overtime − Setting-up task force mode − Alloy adjustments Dü

  21. Slide 21: Stadler Germany

    Stadler Germany Objectives & measures Stadler Germany Locations under pressure in Berlin Measures to ensure − Economic situation: Weak economic development in Germany is a burden on Stadler’s locations in Berlin competitiveness in Berlin − Supplier problems: Bankruptcy cases in the supplier industry

  22. Slide 22: Operational fields of action

    02 Operational fields of action Capital Markets Day 2025 | 19.03.25 | © Stadler

  23. Slide 23: Developments since the last Capital Markets Day

    Developments since the last Capital Markets Day 330 CHF millions invested +1 Production site in Sites & Products1 +2 Component plants >15 New Service sites 2,000 New employees Order Intake 22% 0 2 4 6 8 Ø OI 2019-21 Ø OI 2022-24 +3 Apprenticeships Prod. capacity 68% More apprentices growth Capital M

  24. Slide 24: Cross-location exchange & operational dimensions

    Operational fields of action Cross-location exchange & operational dimensions Cross-location exchange Core dimensions for profitable growth Team Innovation Focus Areas Order intake − Cross-location exchange & harmonisation based on best practices Operation and revenue − Effective communication betwe

  25. Slide 25: Implementation priorities

    Operational fields of action Implementation priorities 26 Guidelines Implementation Strategy & governance Product & process 6 Guidelines 7 Guidelines Processes Systems Organisations − Sharpening of the − Implementation − Strengthening of core processes of ERP & PLM Service / Signalling − Examples: −

  26. Slide 26: Operational implementation: Processes

    03.01 Operational implementation Processes Capital Markets Day 2025 | 19.03.25 | © Stadler

  27. Slide 27: Sharpening of our core processes

    Operational Implementation – Processes Sharpening of our core processes SALES PROCESS PROJECT MANAGEMENT Upcoming Application and Offer preparation Service / Negotiations Engineering Procurement Production IBS Guarantee tender tender analysis including TRM after sales Contract GO-I GO-II Tender X+2

  28. Slide 28: Implementation of the engineering map

    Operational implementation – Processes Implementation of the engineering map Milestone / project planning Introduced quality gates Engineering process G1 G2 G3 G4 G5 G6 G7 G8 G9 G10 G11 G12 G13 G14 Design and approvals Car body construction and assembly Factory acceptance and type test Operation and

  29. Slide 29: Components optimisation

    Operational implementation – Processes Components optimisation Objectives Examples of implemented solutions − Better technical solutions Push buttons Light curtain doors Batteries − Targeted further developments − Lower production costs − Lower life cycle costs -33% -33% -33% Stakeholders − Engineer

  30. Slide 30: Modularisation machine room panelling

    Operational implementation – Processes Modularisation machine room panelling Concept harmonisation Cost reduction of between FLIRT & KISS No welded parts (creation of pooling options in purchasing) (e.g. use of lasered extract air filters) 64% Use of standard c-parts Modern LED (e.g. secondary reten

  31. Slide 31: Operational implementation: Systems

    03.02 Operational implementation Systems Capital Markets Day 2025 | 19.03.25 | © Stadler

  32. Slide 32: Ongoing harmonisation of application landscape in several domains

    Operational implementation – Systems Ongoing harmonisation of application landscape in several domains Transition phase started in 2022 State of the art platform architecture 2027/28 − Different software providers and local instances Technology and Infrastructure serve as a global − Non-harmonised p

  33. Slide 33: Implementation of ERP & PLM

    Operational implementation – Systems Implementation of ERP & PLM 2022 2023 2024 2025 2026 2027 2028 2029 closed WAVE 1 DIV Germany DIV Switzerland WAVE 2 DIV Germany DIV Service DIV Signalling DIV Central Europe ongoing WAVE 3 DIV North America DIV Service DIV Components DIV Service WAVE 4 DIV Spain

  34. Slide 34: Operational implementation: Organisation

    03.03 Operational implementation Organisation Capital Markets Day 2025 | 19.03.25 | © Stadler

  35. Slide 35: Adjustments since 2022

    Operational Implementation – Organisation Adjustments since 2022 Creation of Division Cross-site collaboration North America − Regular exchange of experience: − Rapid growth of Stadler US since − Cross-location harmonisation based on best practice 2016, already over 500 employees − Utilise synergies

  36. Slide 36: Factory expansion & investments in new production technologies

    Operational implementation – Organisation Factory expansion & investments in new production technologies Factory expansion Investments in new production technologies Poland Visual inspection − Center of competence (converters & EPA) − Comparison of component photos with 3D − Increase of steel body p

  37. Slide 37: Networking and optimisation for sustainable success

    Operational measures Networking and optimisation for sustainable success Cross-location exchange Fields of action for sustainable growth − Strengthening our cross-location cooperation: Leverage expertise − Team: Investing in training and talent management within Stadler and increase operational effi

  38. Slide 38: Capital Markets Day 2025 | 19.03.25 | © Stadler

    Capital Markets Day 2025 | 19.03.25 | © Stadler 39

  39. Slide 39: Deep dive Signalling

    Marc Trippel Head of Signalling Division Deep dive Signalling Capital Markets Day 2025 | 19.03.25 | © Stadler

  40. Slide 40: Signalling strategy and positioning

    01 Signalling strategy and positioning Capital Markets Day 2025 | 19.03.25 | © Stadler 41

  41. Slide 41: Stadler is more than rolling stock

    Stadler Signalling Stadler is more than rolling stock

  42. Slide 42: Why Signalling

    Division Signalling Why Signalling SAFETY CAPACITY / EFFICENCY COMPETITIVENESS Signalling – from safe train operations (collision avoidance and speed supervision) to efficiency gains Capital Markets Day 2025 | 19.03.25 | © Stadler 43

  43. Slide 43: Signalling portfolio

    Division Signalling Signalling portfolio Mainline Urban Metro On-board European Train Control Automatic Train Protection Automatic Train Protection System (ETCS) and Driver Advisory Systems and Driver Advisory Systems Wayside Interlocking (CH) Conventional Signalling Conventional Signalling Portfoli

  44. Slide 44: Strong market drivers

    Division Signalling Strong market drivers Demand drivers and their implications Positive outlook in focus markets High demand for mass-transit and M€ +3.7 % CAGR Rail control market outlook Urbanisation capacity increase on existing 30 27.6 infrastructure 25 22.2 +4.9 % CAGR Climate Need for efficie

  45. Slide 45: Milestones and growth rate on track

    Division Signalling Milestones and growth rate on track Growing order backlog Order intake hilights MCHF 1’000 Saudi Arabia: First ETCS nnboard 900 contract in the Middle East with 800 SAR 9x 700 600 500 USA: First large CBTC contract with 400 MARTA (Atlanta) 300 200 100 Switzerland: First mainline

  46. Slide 46: Strategic positioning in signalling market landscape

    Division Signalling Strategic positioning in signalling market landscape Strategic positioning in signalling market landscape Headcount ~1’000 Large global Local players ‐ Clear focus on players1 high value core ‐ Agile innovator developments ‐ Close to ‐ Access to group customers resources and buil

  47. Slide 47: Leveraging global Rolling Stock and Service footprint

    Division Signalling Leveraging global Rolling Stock and Service footprint Focused organisation with global reach − Lean, agile and innovative Signalling organization with selective expansion − Clear focus on centralized Signalling competence centres − Solid base in Europe (Germany, Italy and Switzer

  48. Slide 48: Focused on innovation and market entries

    Division Signalling Focused on innovation and market entries Achievements Strong base for the future Mainline: successful onboard market entry in Well-positioned for the growing ETCS on- Europe, including Refit business board market and solid base for wayside Urban: comprehensive product portfolio o

  49. Slide 49: Strategic direction – from vision to reality

    Division Signalling Strategic direction – from vision to reality Independence and value-added Mainline Independence from direct competition ‐ Interoperable solutions, onboard and wayside and increasing value-added for Stadler ‐ Leader for ETCS Refit solutions Innovation-leader Determined to be innov

  50. Slide 50: ERTMS & ETCS

    02 ERTMS & ETCS Sazi Enicker Head of Sales ETCS Capital Markets Day 2025 | 19.03.25 | © Stadler 51

  51. Slide 51: Strategic ETCS framework

    Secure independence Independence from the competition in ETCS train protection is crucial for Stadler’s long-term success. Strategic ETCS framework Manage complexity ETCS business is complex, demanding and requires up- front investments. For new market entries, this heavily depends on the need for i

  52. Slide 52: ETCS: strategic focus areas

    Division Signalling ETCS: strategic focus areas Strategic focus areas New Stadler fleets Stadler installed base New markets Third-party fleets Drive margin by Drive margin by Enter new markets by Do retrofit projects for equipping new Stadler addressing retrofit of means of suitable third party vehi

  53. Slide 53: Different project set ups

    Division Signalling Different project set ups NEW REFIT • ATP full integration • TSI compliance upgrade • Customizable solutions • ETCS update or 1st installment • Project planning & execution support • Class-B integration • Authorization & Test • Authorization & Test • Mainly Stadler vehicles, • Ex

  54. Slide 54: 10 country homologations in record time

    Division Signalling 10 country homologations in record time Homologated Roadmap − Austria − Czech Republic − Belgium − Denmark − Croatia − France − Germany − Saudia Arabia − Hungary − Spain − Italy − Slovakia − Netherlands − Poland − Slovenia − Switzerland Saudi- Arabia Capital Markets Day 2025 | 19

  55. Slide 55: More than 1,400 vehicles equipped and increasing market share

    Division Signalling More than 1’400 vehicles equipped and increasing market share New OBUs 2022/2023 6% 15% 11% 8% 60% Stadler Hitachi Rail (incl. Ansaldo) Saudi- Siemens Arabia Alstom (incl. Bombardier) Others Legend Homologation obtained Source: Deployment World Map (UNISIG), 10/2024 Ongoing activ

  56. Slide 56: Trusted by established customers for ETCS refits

    Division Signalling Trusted by established customers for ETCS refits Average age of Rolling Stock in Europe1 ‐ Diesel locomotives 40 years ‐ Electric locomotives 29 years ‐ Diesel multiple units 25 years ‐ Electric multiple units 18 years ‐ High-speed trains 14 years 1) SCI 2024: Worldwide Market fo

  57. Slide 57: Success story: Locomotive BR 185

    Division Signalling Success story: Locomotive BR 185 OVERVIEW CONCEPT EXECUTION SUCCESS FACTORS Freight Locomotive operating in Reverse Engineering with Execution close to the vehicle Modification limits AT and DE Vehicle Scan and numerous home location, without investigations on the Vehicle involve

  58. Slide 58: Success story: Train BR 605

    Division Signalling Success story: Train BR 605 OVERVIEW CONCEPT EXECUTION SUCCESS FACTORS Passangers Train for DK, DE and Reverse Engineering with “Backpack solution” history of vehicle modifications CH Vehicle Scan and numerous without involvement of the train investigations on the Vehicle manufac

  59. Slide 59: Success story: Yellow Machine BR 741

    Division Signalling Success story: Yellow Machine BR 741 OVERVIEW CONCEPT EXECUTION SUCCESS FACTORS Maintenance vehicle for ETCS Reverse Engineering with Limited access to technical Mastering safety analysis is lines in Germany Vehicle Scan and numerous documents critical due to vehicle complexity i

  60. Slide 60: Market entry: ETCS competency also on infrastructure side

    Division Signalling Market entry: ETCS competency also on infrastructure Side SZU (Zuerich) awarded Stadler with the network- wide modernisation of its signalling systems − Partnership and long-term implementation con- tract from planning and installation to testing and commissioning of the safety s

  61. Slide 61: Innovation

    03 Innovation Ankit Dabral Head of Business Development CBTC/ATO Capital Markets Day 2025 | 19.03.25 | © Stadler 62

  62. Slide 62: Innovation at core

    Division Signalling Innovation at core Communication Based Train Control – NOVA PRO ‐ Innovative approach with first CBTC application compatible for both Metro and Light Rail Vehicles ‐ Pure Moving block, based on commercial-off-the-shelf (COTS) – one of a kind in the industry Depot automation ‐ Mod

  63. Slide 63: Metro

    Division Signalling Metro For customers who want to be ensured of reliability, precision and maximum safety in urban metro lines. Stadler offers high-quality, lean and modular CBTC solutions and their migration into the existing infrastructure. Automated operation – CBTC Migration The Stadler NOVA P

  64. Slide 64: The most modern metre gauge railway in Europe

    Division Signalling The most modern metre gauge railway in Europe CBTC GoA2 ‐ In commercial operation since December 2022 ‐ Scalable system design: GoA2 in 2024 / expandable to GoA4 ‐ Including collision warning system ‐ Depot automation 2025 in commercial operation Capital Markets Day 2025 | 19.03.

  65. Slide 65: Full automation (GoA4) on open track

    Division Signalling Full automation (GoA4) on open track CBTC GoA4 ‐ ATO GOA4 on open track ‐ Pioneering automated rail operation on branch line ‐ Communication via public network ‐ Defines standards for autonomous operation on open track ‐ On-demand operation in planning ‐ Commissioning 2027 Capita

  66. Slide 66: Depot

    Division Signalling Depot Whether interlocking, ATO solutions or sensors – Stadler supplies tailored hard- and software solutions for visualization and operation within depots Shunting systems Automated shunting Stadler offers innovative system solutions for regulated and We support railway operator

  67. Slide 67: From partial automation in the depot area…

    From partial automation in the depot area… Capital Markets Day 2025 | 19.03.25 | © Stadler 68

  68. Slide 68: … up to fully automatised depot operations

    … up to fully automatised depot operations (shunting, parking, coupling, washing, preparation) Capital Markets Day 2025 | 19.03.25 | © Stadler 69

  69. Slide 69: Use cases of depot automation in GoA4

    Division Signalling Use cases of depot automation in GoA4 Autonomous shunting of the train Autonomous to the workshop Coupling of trains Driverless parking of vehicles Autonomous washing of the train Autonomous preparation of the train at departure platform Capital Markets Day 2025 | 19.03.25 | © St

  70. Slide 70: Digital solutions

    Division Signalling Digital solutions Stadler links different systems to develop digital solutions for various applications. Railway transport therby becomes more punctual and attractive and supports the climate-friendly mobility transportation. We are creating a digital, flexible and independent e-

  71. Slide 71: Revolutionizing migration

    Division Signalling Revolutionizing migration − No platform solutions − Customer-specific migration and strategy − Parallel equipment onboard and trackside − Tailored solutions − Applicable on a large product portfolio Tailormade solutions for our customers’ needs Capital Markets Day 2025 | 19.03.25

  72. Slide 72: Q&A

    Q&A Capital Markets Day 2025 | 19.03.25 | © Stadler 73

  73. Slide 73: Deep dive US market

    Dr. Ansgar Brockmeyer Head of Marketing & Sales Deep dive US market Capital Markets Day 2025 | 19.03.25 | © Stadler

  74. Slide 74: Stadler worldwide market shares

    01 Stadler worldwide market shares Regional Development Capital Markets Day 2025 | 19.03.25 | © Stadler 75

  75. Slide 75: SCI market shares by region

    Competitive landscape global market SCI market shares by region (2022-2024) Home markets North America: EUR 2.4 bn Europe: EUR 13.9 bn CIS: EUR 4.5 bn Others 6% CRRC (2%) 1% Others Stadler (2%) 1% Others Wabtec (3%) 6% CRRC Pesa (1%) 2% 10% Alstom (3%) 2% Stadler (6%) Alstom Ust-Katav (2%) 3% 11% 8%

  76. Slide 76: US rail market characteristics

    02 US rail market characteristics Geographical and technological challenges Capital Markets Day 2025 | 19.03.25 | © Stadler 77

  77. Slide 77: Geographical footprint of US population is challenging for railways

    US Rail Market Characteristics Geographical footprint of US population is challenging for railways 4500km Population: ~340 Mio Area: ~10 Mio km2 2500km Capital Markets Day 2025 | 19.03.25 | © Stadler 78

  78. Slide 78: The railway network is the largest of the world with <1% electrification

    US Rail Market Characteristics The railway network is 290 tkm the largest of the world with <1% electrification Capital Markets Day 2025 | 19.03.25 | © Stadler 79

  79. Slide 79: The US passenger rail market has a vast modernisation potential

    US Rail Market Characteristics The US passenger rail market has a vast modernisation potential: Past, present and future of CalTrain (CA) in a single image Capital Markets Day 2025 | 19.03.25 | © Stadler 80

  80. Slide 80: Market review: Stadler in North America

    Stadler in North America MARKET REVIEW AUTHORITY: Lack of: central authority / planning / knowledge Consultant driven INFRASTRUCTURE: Mostly owned by freight FUNDING: Track class 1 – 9 Generally very good Upgrades are very costly and slow CapEx vs OpEx SUPPLY CHAIN: Small supplier base Long lead tim

  81. Slide 81: Stadler in North America

    03 Stadler in North America Innovation and Technology offensive Capital Markets Day 2025 | 19.03.25 | © Stadler 82

  82. Slide 82: Stadler product families in North America

    A solid basis Stadler product families in North America Leader in ZERO emissions technology Most advanced Metro vehicles Next Generation Light Rail Vehicles 2002 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Metro Marta CBTC LRV UTA KISS Caltrain EMU FLIRT TexRail Caltrain BE

  83. Slide 83: Our products in an overview

    Stadler Rail in the United States Our products in an overview GTW FLIRT KISS METRO LIGHT RAIL VEHICLES TAILOR MADE Propulsion Systems: Propulsion Systems: Propulsion Systems: Propulsion Systems: Propulsion Systems: Options: - Diesel - Battery - Battery - Battery - Overhead Catenary - Cog Rail - Over

  84. Slide 84: Footprint Salt Lake City (UT)

    Footprint Salt Lake City (UT) Stadler in North America New paint booths Water test station Expanded Expansion commissioning area hall - NEW View Looking Southwest View Looking Southeast Capital Markets Day 2025 | 19.03.25 | © Stadler 85

  85. Slide 85: Stadler in the United States

    04 Stadler in the United States Growing fast & sustainably Capital Markets Day 2025 | 19.03.25 | © Stadler 86

  86. Slide 86: Ongoing projects

    Stadler in the United States Ongoing projects − Caltrain ‒ Fleet stable in revenue service − 19 KISS ‒ Last 2 Trainsets from Base Order & Option 1 in final assembly EMU − SBCTA ‒ Start of revenue service with H2 scheduled for spring 2025 − 3 FLIRT ‒ Maintenance contract awarded DMU + 1 ‒ DMU Fleet i

  87. Slide 87: Newly awarded projects

    Stadler in the United States Newly awarded projects − Caltrain ‒ Route: San Francisco Peninsula – San Jose – Gilroy − 1 KISS ‒ Ridership: TBD BEMU ‒ Revenue Service: Expected end of 2027 ‒ Power: Electric, runs on 25kV 60Hz AC overhead line − Metra ‒ Route: Rock Island Line − 8 FLIRT ‒ Ridership: TB

  88. Slide 88: Projects in production

    05 Projects in production 2019 - 2025 Capital Markets Day 2025 | 19.03.25 | © Stadler 89

  89. Slide 89: Caltrain KISS Double-Decker EMU

    Caltrain (CA) KISS Double-Decker Electric Multiple Unit (EMU) TRACK Route San Francisco Peninsula – San Jose – Tamien Stations 24 stations Length 77 miles Ridership 65,000+ per day CUSTOMER TRAIN SPECIFICATIONS Name Peninsula Corridor Joint Powers Board (PCJPB) Type EMU KISS 7-CAR Vehicles 19 trains

  90. Slide 90: MARTA Metro

    Metropolitan Atlanta Rapid Transit Authority (MARTA) (GA) Metro TRAIN SPECIFICATIONS Type Metro Vehicles 56 trains / 224 cars Max Speed 70 mph Axle Arrangement TBD Power Electric, 750v DC Third Rail Size of Train L 340’ x W 10.5’ CUSTOMER TRACK Name Metropolitan Atlanta Rapid Transit Authority Route

  91. Slide 91: Utah State University FLIRT BEMU

    Utah State University (UT) FLIRT Battery Electric Multiple Unit (BEMU) TRAIN SPECIFICATIONS Type FLIRT BEMU 2-Car Vehicles 1 train / 2 cars Max Speed 79 mph Axle Arrangement 4 Powered 4 Unpowered Power Battery Size of Train L 169’ x W 9’ x H 14’ CUSTOMER TRACK Name Utah State University (USU) Route

  92. Slide 92: In design and future projects

    06 In design and future projects 2024 - 2028 Capital Markets Day 2025 | 19.03.25 | © Stadler 93

  93. Slide 93: Caltrans FLIRT H2 ZEMU

    California Department of Transportation (Caltrans) (CA) FLIRT H2 Zero-Emission Multiple Unit (ZEMU) TRACK Route Sacramento - Merced Stations 15 Length Approx 230m per direction Ridership tbd CUSTOMER TRAIN SPECIFICATIONS Name Caltrans Type FLIRT H2 Vehicles 10 + 19 Location Sacramento Max. Speed 90

  94. Slide 94: Caltrain Options KISS BEMU

    Caltrain Options (CA) KISS Battery Electric Multiple Unit (BEMU) TRACK Route San Jose Tamien -Salinas, CA Stations 3 stations Length 67 miles Ridership Showcase demonstrator CUSTOMER TRAIN SPECIFICATIONS Name Peninsula Corridor Joint Powers Board (PCJPB) Type BEMU KISS 4-CAR Vehicles 1 train Locatio

  95. Slide 95: Metra FLIRT BEMU

    Metra / RTA Chicago (IL) FLIRT Battery Electric Multiple Unit (BEMU) TRACK Route Chicago – Joliet (Rock Island Line) Stations 26 Length 41 miles Ridership 7M per year CUSTOMER TRAIN SPECIFICATIONS Name Metra Type FLIRT BEMU 2-Car Vehicles 8 Location Chicago Max Speed 100 mph Due Date June 2028 Axle

  96. Slide 96: UTA CITYLINK Light Rail Vehicle

    Utah Transit Authority (UT) CITYLINK Light Rail Vehicle TRACK Route Airport – Draper – University of Utah - Daybreak Stations 26 Length 45 miles Ridership 11M per year CUSTOMER TRAIN SPECIFICATIONS Name Utah Transit Authority Type CITYLINK Vehicles 20 Location Salt Lake City, Utah Max Speed 65 mph D

  97. Slide 97: TexRail FLIRT DMU

    TexRail (TX) FLIRT Diesel Multiple Unit (DMU) TRAIN SPECIFICATIONS Type FLIRT / 5 car DMU Vehicles 4 trains / 20 cars Max Speed 79 mph Axle Arrangement 4 powered 8 unpowered Power Diesel, 700kW Size of Train L 266’ x W 9’5.4” x H 15’10” Weight 160 Tons CUSTOMER TRACK Fort Worth – Dallas Name Trinity

  98. Slide 98: MARTA signaling

    MARTA signaling - Project volume approx. 500 Mio USD - Modernization of infrastructure and on-board equipment - Upgrade to Communication Based Train Control (CBTC) - Implementation of Stadler Nova Pro - Replacement of 3rd party obsolete legacy system - Breakthrough in NA-market Capital Markets Day 2

  99. Slide 99: Financial performance and outlook

    Raphael Widmer Group CFO Financial performance and outlook Capital Markets Day 2025 | 19.03.25 | © Stadler

  100. Slide 100: Conservative accounting principles

    Conservative accounting principles Order • Only firm orders are booked as order intake (no options included) intake • Order financing must be secured Revenue • Percentage of completion: units-of-delivery method recognition • Revenue is only booked when a train is delivered; costs are calculated usin

  101. Slide 101: Financial risk management

    Financial risk management • Currency exposures are naturally hedged where feasible • In regions where Stadler is exposed to a structural mismatch between the currency of its net revenue and costs, it utilises hedging tools such as foreign currency forward contracts and other derivative instruments i

  102. Slide 102: Long-term development of key financials

    Long-term development of key financials Unpegging of Growth & Ukraine war COVID-19 Floodings European crisis CHF vs. EUR execution inflation 10’000 9’000 8’000 7’000 6’000 Order intake (CHFm) 5’000 Average order intake (CHFm) 4’000 Book-to-bill ratio (1) 3’000 2’000 1’000 0 2011 2012 2013 2014 2015

  103. Slide 103: Order backlog

    CHFbn Order backlog 29.2 Comments 0.6 Order backlog of CHF 29.2bn with a 24.4 growing Service & Components 0.2 7.6 share providing long-term visibility +15% CAGR 22.0 0.2 5.9 17.9 4.8 16.1 0.1 15.0 4.4 13.2 2.8 4.1 11.0 2.3 9.3 2.0 20.9 0.8 17.0 18.4 12.3 12.0 13.4 10.9 8.5 9.0 2016 2017 2018 2019 2

  104. Slide 104: Capital expenditure

    CHFm Capital expenditure 288 Comments 57 − Capacity investments driven by 248 244 233 expansions in Spain, Hungary, the 35 US and Poland 79 − Intangibles Capex mainly relate 188 184 70 to R&D in locomotives, alternative 14 177 propulsion technology 59 and signalling 66 231 213 76 174 166 163 55 11 1

  105. Slide 105: Cash flow cycles through project execution

    Cash flow cycles through project execution Comments Front-end − No structural change in payment loaded terms cash − Customer and market specific profile cash flow profiles typically vary significantly − Key driver for cashflows in a specific period are the mix of ongoing orders combined with advance

  106. Slide 106: Long-term net working capital evolution

    CHFm Long-term net working capital evolution 403 115 27 -157 -323 -443 -710 -856 -1’011 2016 2017 2018 2019 2020 2021 2022 2023 2024 Orders with substantial Consumption of advance payments Catch-up of Covid delays, progress and final advance payments at as orders are being execute.d payments from or

  107. Slide 107: Long-term net cash evolution

    CHFm Long-term net cash evolution 960 629 532 399 368 6 -231 -351 -608 2016 2017 2018 2019 2020 2021 2022 2023 2024 Movements in net cash are mainly driven by swings in net working capital Capital Markets Day 2025 | 19.03.25 | © Stadler 108

  108. Slide 108: Deep dive long-term project accounting

    Deep dive long-term project accounting Capital Markets Day 2025 | 19.03.25 | © Stadler 109

  109. Slide 109: Conservative revenue recognition

    Conservative revenue recognition Phase I: Phase II: Phase III: Phase IV: Phase V: Signing Engineering Manufacturing Delivery Warranty Project phases 6m 1y 1.5y 3-4y 3-6y Milestones payments Milestones payments Delivery payment (10% - 30%) (70% - 75%) (5% - 15%) % of total payments(1) Cash in Cash ou

  110. Slide 110: Production output

    CHFm Production output 8.6 ∅ order intake > 5.0 >5.0 CHF 6.8 bn Comments 6.8 ~95% >80% 6.4 − Operating activities and production output significantly 5.6 ahead of revenue recognition by units-of-delivery 4.2 − Significant step-up in production 3.9 3.6 3.8 3.8 3.6 3.6 output expected in 2025 driving

  111. Slide 111: Example: Units-of-delivery vs cost-to-cost I/II

    CHFm Example: Units-of-delivery vs cost-to-cost I/II Assumptions 2025 2026 2027 2028 Total Manufacturing costs (material & hours) 13.6 30.4 28.8 7.2 80.0 Cash-in (Advance-, milestone- and final payments) 15.0 37.5 37.5 10.0 100.0 Order margin in % 20.0 Vehicle deliveries 0 0 4 1 5 Units-of-Delivery

  112. Slide 112: Example: Units-of-delivery vs cost-to-cost II/II

    CHFm Example: Units-of-delivery vs cost-to-cost II/II Units-of-delivery (annual) Units-of-delivery (cumulative) Units-of-delivery 100 100 10 80 80 5 60 60 0 40 40 20 20 -5 0 0 -10 2025 2026 2027 2028 2025 2026 2027 2028 2025 2026 2027 2028 Cost-to-cost (annual) Cost-to-cost (cumulative) Cost-to-cost

  113. Slide 113: Work in progress I/II

    Work in progress I/II Assets Liabilities ‐ Work in progress is determined on an order-by-order basis ‐ Depending on its cashflow profile, stage of execution and percentage of completion, an order can either constitute an asset or a liability from work in progress ‐ Net work in progress is the main d

  114. Slide 114: Work in progress II/II

    Work in progress II/II Assets Liabilities Capital Markets Day 2025 | 19.03.25 | © Stadler 115

  115. Slide 115: Compensation claims from work in progress

    Compensation claims from work in progress Accounting principles (extract) – Revenue from rail vehicles is recognised on the basis of the percentage of completion (by units-of- delivery), provided the relevant conditions are met – There are justified cases in which acceptance by the customer is delay

  116. Slide 116: Diversified, high-quality order backlog

    Diversified, high-quality order backlog Order backlog by region Order backlog by market segment Share of top 10 orders(1) 4% 2% 6% 8% 5% 6% 26% 4% 7% 37% 3% 47% 3% 3% 2% 2% 2% 2% 11% 66% 30% 6% 10% 7% DACH CIS Trains Tailor-made Western Europe Eastern Europe Locomotives Service & Components Americas

  117. Slide 117: EBIT bridge to mid-term guidance

    EBIT in % of net revenue EBIT bridge to mid-term guidance Comments 6-8% − Negative impacts in 2024 to diminish over the coming years ~1% − Step-up in revenues going into ~1% 2026 will lead to significantly higher SG&A absorption − More stringent and selective sales ~2% process drives an increasing 3

  118. Slide 118: Guidance

    Guidance 2025 2026 mid-term Order intake 1.0-1.5 ø book-to-bill 1.0-1.5 ø book-to-bill 1.0-1.5 ø book-to-bill Net revenue increase vs 2024 > CHF 5.0bn > CHF 5.5bn EBIT-margin 4 – 5% 6 – 8% CAPEX ~ CHF 250m ~ CHF 200m max. CHF 200m Dividend policy 60% 60% 60% (% of profit for the year, attributable t

  119. Slide 119: Q&A

    Q&A Capital Markets Day 2025 | 19.03.25 | © Stadler 120