  1. Slide 1: MHI's Post Combustion Carbon Dioxide Recovery Process & Status Update

    Slide 1: MHI's Post Combustion Carbon Dioxide Recovery Process & Status Update

    Mitsubishi Heavy Industries, America MHI’s Post Combustion Carbon Dioxide Recovery Process & Status Update Steven Holton Mitsubishi Heavy Industries, America

  2. Slide 2: Background

    Slide 2: Background

    Mitsubishi Heavy Industries, America Background Coal looks certain to remain the principal fossil fuel for Power Generation in the foreseeable future Clean coal technology development is great but what about the existing plants? CO2 capture retrofit ability is critical MHI offers a post-combustion s

  3. Slide 3: CO2 Capture and Sequestration

    Slide 3: CO2 Capture and Sequestration

    Mitsubishi Heavy Industries, America CO2 Capture and Sequestration Boiler CO2 / GT CO2 Capture Compression zCO2 Storage Options „ Enhanced Oil Recovery (EOR) „ Enhanced Gas Recovery (EGR) „ Enhanced Coal Bed Methane Recovery (ECBMR) „ Disposal to Depleted Oil and Gas Reservoirs „ Disposal to Deep Sa

  4. Slide 4: KM-CDR Process Flow

    Slide 4: KM-CDR Process Flow

    Mitsubishi Heavy Industries, America MHI’s KM-CDR Process Flow Flue Gas Outlet CO2 Purity : 99.9 % ABSORBER STRIPPER C.W. Flue Gas Cooler C.W. Flue Gas C.W. Reboiler Steam

  5. Slide 5: Nanko Pilot Plant

    Slide 5: Nanko Pilot Plant

    Mitsubishi Heavy Industries, America Nanko Pilot Plant PILOT PLANT OUTLINE Location : Nanko Power Plant, Osaka, Japan Capacity : 2 T/D Start Up : 1991 Feed Gas : Natural gas fired boiler Purpose of the Plant ① Development of Energy Minimizing Solvent ② Development of Equipment Technology Development

  6. Slide 6: Commercial Experiences

    Slide 6: Commercial Experiences

    Mitsubishi Heavy Industries, America MHI’s Commercial Experiences Malaysia Japan India Petoronas Chemical Co. IFFCO 1999~ 2005~ Dec 2006~ 200 t/d 330 t/d 450 t/d Urea General use Urea OTHER UAE China India Middle East India PROJECTS IFFCO Project FEED FEED Awarded Awarded Dec 2006~ Status Complete C

  7. Slide 7: Experience

    Slide 7: Experience

    Mitsubishi Heavy Industries, America MHI’s Experience Large Scale CO2 Capture Plant -3000 T/D Plant

  8. Slide 8: Flue Gas CO2 Recovery Technology

    Slide 8: Flue Gas CO2 Recovery Technology

    Mitsubishi Heavy Industries, America MHI’s Flue Gas CO2 Recovery Technology Key Features • Hindered Amine Solvent “KS-1” • Special proprietary equipment • Proprietary energy efficient process • Enables large scale, based on MHI’s FGD experiences • Advantages KS-1 solvent - High CO2 Loading - Negligi

  9. Slide 9: Solubility of CO2 in KS-1 and MEA Solution

    Slide 9: Solubility of CO2 in KS-1 and MEA Solution

    Mitsubishi Heavy Industries, America Solubility of CO2 in KS-1 and MEA Solution Regeneration Region MEA KS-1 CO2 Partial Pressure Higher CO2 loading More efficient regeneration Absorption Region 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 CO2 Loading (mol.CO2 / mol.Amine)

  10. Slide 10: Corrosion Test Result

    Slide 10: Corrosion Test Result

    Mitsubishi Heavy Industries, America Corrosion Test Result (Unit : mils per year) Test 1 Test 2 MEA 93.0 76.4 MEA + inhibitor 9.5 8.3 KS-1 3.1 3.6 Test condition : 130°C, in the presence of O2 Less corrosion

  11. Slide 11: Deteriorated Product of MEA and KS-1

    Slide 11: Deteriorated Product of MEA and KS-1

    Mitsubishi Heavy Industries, America Deteriorated Product of MEA and KS-1 +4 KS-1 Commercial KS-1 Pilot HEAT STABLE SALTS (wt%) +3 MEA Commercial MEA Pilot +2 +1 Less HSS formed Base 0 100 200 300 400 500 600 RUNNING TIME (hours)

  12. Slide 12: CO2 Capture Process Improvement Update

    Slide 12: CO2 Capture Process Improvement Update

    Mitsubishi Heavy Industries, America MHI’s CO2 Capture Process Recovered CO2 – Improvement update Heat Recovery Stripper & Process Features: Solvent Unique concept to utilize lean solvent Regeneration CO2 Steam and steam condensate heat for regeneration inside the stripper Lean solvent 30% reduction

  13. Slide 13: Flue Gas CO2 Recovery Technology: Process Comparison

    Slide 13: Flue Gas CO2 Recovery Technology: Process Comparison

    Mitsubishi Heavy Industries, America MHI’s Flue Gas CO2 Recovery Technology Process Comparison MEA KS-1 Solution Circulation Rate 1 0.6 Regeneration Energy 1 0.68 Degradation of the Solvent 1 0.1 Solvent Loss 1 0.1 Corrosion Inhibitor YES NO

  14. Slide 14: CO2 Recovery from Coal-fired Boiler

    Slide 14: CO2 Recovery from Coal-fired Boiler

    Mitsubishi Heavy Industries, America CO2 Recovery from Coal-fired Boiler Characteristics of the flue gas from coal fired boilers The flue gas contains more NOx, SOx, dust, halogens and heavy metals compared with that from natural gas-fired boilers Natural Gas Fired Flue Gas Component Coal Fired Flue

  15. Slide 15: Coal Fired Long Term Demonstration Plant

    Slide 15: Coal Fired Long Term Demonstration Plant

    Mitsubishi Heavy Industries, America Coal Fired Long Term Demonstration Plant DEMO PLANT OUTLINE Solvent : KS-1 Capacity : 10 T/D Feed Gas : Coal Fired Boiler (14.1 v% CO2) Start-up : July 2006 Location : Nagasaki, Japan Development Results ‹ Increased understanding of the effects of impurities on t

  16. Slide 16: KM-CDR CO2 Capture Process for Coal Flue Gas

    Slide 16: KM-CDR CO2 Capture Process for Coal Flue Gas

    Mitsubishi Heavy Industries, America MHI’s KM-CDR CO2 Capture Process Flue Gas for Coal Flue Gas Outlet CO2 Purity : 99.9 % ABSORBER STRIPPER C.W. Flue Gas Cooler C.W. Flue Gas Deep C.W. Reboiler FGD Steam

  17. Slide 17: CO2 Recovery from Coal-fired Boilers

    Slide 17: CO2 Recovery from Coal-fired Boilers

    Mitsubishi Heavy Industries, America CO2 Recovery from Coal-fired Boilers ‹Retrofit Boiler Stack SCR ESP FGD De-NOx: YES De-Dust: YES Treated Flue Gas De-SOx: YES FGD CO2 (Deep FGD) Capture Flue Gas Future upgrading (Deep FGD) CO2 To Compression for performance required by CO2 Capture Product & Dehy

  18. Slide 18: Development Schedule

    Slide 18: Development Schedule

    Mitsubishi Heavy Industries, America Development Schedule Evolution 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 1 t/d (0.14MWth) Pilot Test Completed Coal 10 t/d Long Term Fired Demo. Plant 4,000 Hr Operation Achieved Flue Gas projects 1 Ton/Day Pilot Plant Medium S

  19. Slide 19: Flue Gas Coal Fired CO2 Recovery Scale up

    Slide 19: Flue Gas Coal Fired CO2 Recovery Scale up

    Mitsubishi Heavy Industries, America Flue Gas Coal Fired CO2 Recovery Scale up 100 times 1.7 times 1.5 times ~ 6 times scale up scale up scale up scale up Malaysia Japan India Large Coal Fired Nanko Commercial Commercial Commercial Demonstration Pilot plant Plant plant plant plant CO2 recovery 2 200

  20. Slide 20: Phased Approach to Commercialization: Natural Gas

    Slide 20: Phased Approach to Commercialization: Natural Gas

    Mitsubishi Heavy Industries, America MHI’s Phased Approach to Commercialization NATURAL GAS MHI’s Operating Experience 2 t/d 200 t/d 330 t/d 450 t/d 800 t/d >3000 t/d Pilot Plant Experience Commercial Experience FEED complete Basic Design complete with natural gas fired flue gas with Natural Gas fir

  21. Slide 21: Phased Approach to Commercialization: Coal

    Slide 21: Phased Approach to Commercialization: Coal

    Mitsubishi Heavy Industries, America MHI’s Phased Approach to Commercialization COAL Small scale coal fired demonstration plant (10 t/d) Large scale coal fired demonstration plant (1000 – 3000 t/d) Scale up to commercial scale plant (>5000 t/d) MHI’s Operating Experience 10 t/d 1 - 3000 t/d >5000 t/

  22. Slide 22: In Summary

    Slide 22: In Summary

    Mitsubishi Heavy Industries, America In Summary ¾ Coal has a number of advantages distinguishing it from other fuels (price, abundant & stable supply) ¾ It will take a suite of technologies to ‘make a difference’ but MHI’s post combustion CO2 capture process is available for both retrofit and green

  23. Slide 23: Thank you

    Slide 23: Thank you

    Mitsubishi Heavy Industries, America Thank you Further information; Steve Holton Mitsubishi Heavy Industries, America Inc. Environmental Systems Division Phone: (512) 419-5388 Cell Phone: (512) 804-8789 E-mail: steve_holton@mhihq.com Web: http://www.mhi.co.jp/mcec/product/recov_co2/ 0